Loading...
HomeMy WebLinkAboutVJ Engineering-5/6/2013Iowa Department of Natural Resources Wastewater Section Construction Permit Application SEWAGE TREATMENT AGREEMENT INSTRUCTIONS This agreement must be executed for all projects where construction and sewage treatment will be provided by different parties; i.e., a private subdivision connecting to a municipal system. This agreement must be executed by the parties who are owners at the time the permit is issued, regardless of whether title to the proposed construction project will be transferred after completion of the project. This agreement is not necessary when a contract for sewage treatment already exists; i.e., service contracts between municipalities. However, the Department of Natural Resources must be informed in writing that the contractual agreement does exist. APPLICANT ENGINEER OWNER Sunnyside South Addition, LLC FIRM VJ Engineering ADDRESS PO Box 447, Hudson, IA 50643 ADDRESS 1501 Technology Drive, Suite 100, Cedar Falls, IA 50613 REPRESENTATIVE Jeff Stickfort TELEPHONE 319-290-4357 PROJECT OFFICER Bruce P. Radue, P.E. TELEPHONE 319-266-5829 PROJECT IDENTIFICATION Sunnyside South Addition OWNER AND SYSTEM RECEIVING WASTES City of Waterloo CERTIFICATE I am the authorized representative of the owner identified above and state that the proposed sanitary sewerage facilities shall be constructed in accordance with the plans and specifications and all wastes contributed by this project shall be discharged to the treatment system identified above. SIGNATURE TITLE DATE I am the authorized sewerage facilities treatment of all of the Department service agreements, AGREEMENT TO PROVIDE representative of the owner of the system identified identified above is approved by the owner, and that wastes contributed by this project, in accordance with of Natural Resources. This agreement shall not or fee systems entered into between the parties. SEWAGE TREATMENT above and state that the connection of the proposed sanitary the owner accepts responsibility for providing adequate the provisions of Chapter 455B, Code of Iowa, and the rules be construed in any way to affect any local ordinances, sewer SIGNAT i .r i ,ir ou TYPED OR PRIty,v,4NTED b.NAME 1,16_,r) TITLE j6d141Y- PHONE NUMBER DATE si a_ __ DNR form 29 (Nov 0 ) 542-3219 Exhibit 11A Iowa Department of Natural Resources Wastewater Engineering Section Construction Permit Application SCHEDULE A, General Information APPLICANT ENGINEER OWNER E-MAIL ADDRESS Sunnyside South Addition, LLC jeff@stickfortconstruction.com FIRM E-MAIL ADDRESS VJ Engineering bradue@vjengineering.com ADDRESS PO Box 447, Hudson, IA 50643 ADDRESS 1501 Technology Parkway, Suite 100, Cedar Falls, IA 50613 REPRESENTATIVE TELEPHONE Jeff Stickfort 319-290-4357 PROJECT OFFICER TELEPHONE Bruce P. Radue, P.E. 319-266-5829 PROJECT IDENTIFICATION Sunnyside South Addition ESTIMATED START DATE * ESTIMATED COMPLETION DATE PLEASE RESPOND TO ALL QUESTIONS YES 1. Has an engineering report, facilities plan or other information previously been submitted for this project? ❑ NO r If Yes=> PROJECT IDENTITY DATE SUBMITTED 2. Does the project and construction permit application, as submitted, follow the recommendations, design loadings, construction schedule, permit limits, and conclusions of the approved engineering report or facilities plan? If No=> Provide the design basis and technical information justifying all changes. 3. Are there three complete sets of plans and specifications accompanying this application? For a minor gravity sewer extension within the meaning of 455B.183.3 Code of Iowa and Design Standard 11.1, two complete sets will be adequate for expeditious approval. For more complex projects, three sets of plans and specifications may be requested. 4. Are approved standard specifications a part of this application? /1 /1 1 ❑ ❑ ❑ If Yes=> APPROVED STANDARD SPECIFICATIONS OF (municipality or firm) DATE APPROVED 5. Does each set of plans and specifications or engineering report accompanying this application contain a "professional engineering seal" executed in conformance with 542B.16, Code of Iowa? If No=> Processing will be delayed pending receipt of applicable design schedules and certified plans, specifications or engineering report. 6. Is this a joint wastewater and water supply project? If Yes=> A construction permit application for the water supply project should be submitted separately to the Water Supply Section. A water supply permit fee may be required. 7. Is the applicant to provide treatment of effluent resulting from this construction? If No=> A Sewage Treatment Agreement (DNR Form 29) executed by the authority providing treatment must accompany this application. 8. Is a new or amended operation permit necessary to use the facilities described in this application? If Yes=> A new or amended permit to operate may be requested prior to the receipt of a construction permit. 9. Is any waterline located within 10 feet; or any private or public well, lake, or public recreation area located within 400 feet of the proposed construction? If Yes=> Identify and locate the facility(s) relative to the proposed construction. 10. Will construction inspection be conducted by a licensed engineer employed by the applicant? /./ 12 ❑ ❑ ❑ // ❑ L- r /1 ►• ❑ If No=> NAME OF ENGINEERING FIRM CONDUCTING INSPECTION 11. Will this project utilize CWSRF loan funds? ❑ ►1 CERTIFICATION APPLICANT I certify that I am the authorized representative of the owner and state that the project identified above is approved by the owner. ,I lia%� A" ' r— // — a ENGINEER I certify that all aspects of design included in this application conform to applicable standards contained in Chapter 567 IAC 64, or that an explanation and justification for any proposed variations from such standards is attached. I am familiar with the information contained in this application, and to the best of my knowledge, such information is complete and accurate. SIGNATURE V 1 J DATE SIGNATURE DATE * Estimated Construction Start Date: Complete applications must be submitted at least 120 days in advance of the date for starting construction in accordance with Rules 567 IAC 60.4 and 64.2 PLEASE COMPLETE THE SCHEDULE CHECKLIST ON THE FOLLOWING PAGE OF THIS FORM DNR form 28A (Sept 2010) 542-3129 Construction Permit Application SCHEDULE A, General Information, page 2 SCHEDULE B c D E F G HI H2 H3 I J K1 K2 K3 L M N 0 P Q R1 R2(A & B) R3 S Identify all categories TITLE Collection system DOCUMENT CHECKLIST included in this project. Also, identify schedules attached to this application. INCLUDED IN ATTACHED PROJECT O ❑ Lateral Sewer Extension Trunk & Interceptor Sewer Wastewater Pump Station Treatment Project Site Selection Treatment Project Design Data Schematic Flow Diagram Treatment Process Loading and Removal Efficiency Mechanical Plant Reliability Screening, Grit Removal and Flow Measurement Septic Tank System Controlled Discharge Pond Aerated Pond Anaerobic Lagoon Setting Tanks Fixed Film Reactor — Stationary Media Rotating Biological Contactor O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 Aeration Tanks or Basins 0 0 Gas Chlorination Sludge Digestion and Holding Sludge Dewatering and Disposal Low Rate Land Application of Sludge ❑ ❑ O 0 O 0 O 0 Land Application of Sewage Sludge (To be developed) Land Application of Wastewater (To be developed) Sewage Treatment Agreement O 0 O 0 O 0 SUBMITTAL DATE Identify any categories included in this project which are not provided in the above list of schedules. DNR form 28A (Sept 2010) 542-3129 Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE B, Collection system DATE PREPARED 4/17/2013 DATE REVISED PROJECT IDENTITY Sunnyside South Addition DNR USE PROJECT NO. PERMIT NO. 1. Identify proposed construction which is subject to flooding and explain what is proposed to prevent water from entering the system. If no portion is subject to flooding, state none. Segment Flooding Protection NW, Sec. 8-88-13 Flood Proof Casting (IMH) *2. Indicate hydraulic capacity of: 1) the nearest downstream main or interceptor, 2) the nearest downstream lift station, and 3) all downstream segments where flow restriction may occur. Indicate the source and accuracy of numerical data. Location Design capacity, MGD Peak Hourly Dry weather Flow MGD (actual) Peak Hourly Wet Weather Flow MGD (actual) Segment Segment Segment SW1/4, 5-88-13 1.03 0.01 0.06 *3. Identify treatment facility, the design loadings and present raw waste loadings. Indicate source and accuracy of numerical data. Facility name and number Waterloo Water Pollution Control Plant Facility Loading Design Average Wet Weather (actual) Peak Hourly Wet Weather (actual) MGD #BODS/day 34.8 88,000 24.53 31,500 60+ 48,000+ Provide projected design loading increase, which will be added to this facility as a result of this project. Design Loading Initial Design Year (Line) Residential service area 3— Acres (0 Acres Population 42 Persons 84 Persons Flow (100 GPCD) 4200 GPD 8400 GPD BOD5 (0.17 #/d/cap) 7.2 #/day 14.4 #/day Industrial service area Acres Acres [dated flow GPD GPD BOD5 #/day #/day Other Acres Acres Rated Flow GPD GPD BOD5 #/day #/day Total BOD5 7.2 #/day 14.4 #/day Total Flow 4200 GPD 8400 GPD Peak Hourly Flow 16800 GPD 33600 GPD Include a written explanation of items 2 and 3 if the sewer system and/or treatment facility are overloaded. DNR form 28B (Nov 00) 542-3095 Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE C, Lateral Sewer Extension DATE PREPARED 4/17/2013 DATE REVISED PROJECT IDENTITY Sunnyside South Addition DNR USE PROJECT NO. PERMIT NO. 1. Design Basis Initial Design Year (2020 ) Residential service area 5 Acres 10 Acres Population 42 Persons 84 Persons Flow (100 GPCD) 4200 GPD 8400 GPD BOD5 (0.17 #/d/cap) 7.2 #/day 14.4 #/day Industrial service area Acres Acres Rated Flow GPD GPD BOD5 #/day #/day Other Acres Acres Rated Flow GPD GPD BOD5 #/day #/day Total BOD5 7.2 #/day 14.4 #/day Total Flow 4200 GPD 8400 GPD Peak Hourly Flow 16800 GPD 33600 GPD 2. Pipe Diameter 8 Inch 10 Inch 12 Inch Material PVC Truss Joint Elastomeric Minimum Slope 0.4 % % % Maximum Manhole Space 387 ft. ft. ft. Total Sewer Length 3,351 ft.. ft. ft. Maximum Cover 12.2 ft. ft. ft. Minimum Cover 8.5 ft. ft. ft. 3. Construction specifications (indicate ASTM No. or other standard included in the specifications). A brief description is required in each part. A. Bedding class ASTM Class II, D2321-75 except as modified by ASTM D2680-01 B. Pipe laying ASTM Class II, D2321-75 except as modified by ASTM D2680-01 C. Compaction 95% Standard Proctor Density D. Manhole ASTM C478, 48" dia. E. Specified maximum Infiltration/exfiltration rate 200 GPDPMPI F. Infiltration/exfiltration test procedures v -notch weir, televising, or air test G. Alignment & grade test procedures (1) During construction: Stake & batter board yes Laser yes (2) After construction: Lamping yes Other televising H. Deflection test procedures NA 4. Are detailed manhole drawings included: Yes ❑ No Typical frame and cover assembly Neenah R-1642 Are manhole covers nonvented: Yes ® No ❑ Manhole diameter 48 in. Manhole opening diameter 24 in. Material Concrete 5. Minimum sewer & water main separation: Horizontal 10 Are specifications included? No ft. Vertical 18 in. 6. Stream, road, or railroad crossing protection NA Are specifications included? NA DNR form 28C (Nov 00) 542-3096