May 20, 2013
Mr. Larry Smith
Water Pollution Control Facilities
3505 Easton Avenue
Waterloo, Iowa 50702
Subject: Waterloo WPCF UV Disinfection Facilities
City Contract No. 817
AECOM #60184375
Dear Larry,
AECOM 319-232-6531 tel
501 Sycamore Street 319-232-0271 fax
Suite 222
Waterloo, Iowa 50703
www.aecom.com
Enclosed please find two (2) copies of Change Order No. 2 to the above -referenced project.
The change order reflects some additional electrical work primarily associated with relocation of the float
and is for a net increase in the Contract Amount of $2,530.00. The change order reflects an increase of
approximately 0.06%.
The project is very nearly completed, and we do not anticipate any significant change order items through
project completion.
We have discussed the change order previously. If you have any questions or if you need anything
further from us at this time, please let us know.
Yours sincerely,
Robert E. Bamsey
Enclosures: As Noted
c: Ms. Suzy Schares (w/enclosure)
P:1602709631200_CorrespondencetsCO2.docx
CHANGE ®" IE
Owner. City of Waterloo, Iowa
Project Waterloo WPCF— UV Disinfection
NOE2
Date: May 20, 2013
Owner's Contract No.: 817
Date of Contract Start: May 29, 2012
Contractor: Story Construction, Co.
$ 4,123,000
You are directed to make the following changes in the Contract Documents. Description:
See attached change request summary (5/10/13).
Reason for Change Order:
Additional electrical work.
CONTRACT PRICE
CONTRACT TIMES
To
Completion
Original: $ 4,123,000.00 Original: April 30, 2013
Previous C.O.s (ADD/DEDUCT): $ 38,777.00 Previous C.O.s (ADD/DEDUCT):
This C.O. (ADDS): $ 2,530.00 This C.O. (ADD/DEDUCT):
Contract Price With All Approved
Change Orders: $ 4,164,307.00 REVISED: April 30, 2013
Original Completion Date: April 30, 2013
Revised Completion Date: April 30, 2013
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and
acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO
By:
OAuthorized Signature) ` Date:
ACCEPTED:
By:
Cotitfactor4Authorized Signature)
Date:
P:Y02709631600_CRSt606_Constmaion Contract Changes1606.I Chatge_Orders\CO2.doc
AECOM
60270963.600 2
Project No. Change Order No.
_ = CONSTRUCTION
Change
Request
Summary
PROJECT:
Disinfection Facilities
Easton Avenue Water Pollution Control Facility
Waterloo, Iowa
CHANGE REQUEST NO.: CR- 10
DATE: May 10, 2013
PROPOSED CHANGE DESCRIPTION
Miscellaneous electrical items listed below.
Schedule Impact: NONE
Proposal Qualifications:
NONE . Proposal valid for 14 days.
Attachments: Quotation from Schammel Electric
SUMMARY OF COST BREAKDOWN:
Quotation from Schammel Electric
Delete Relocation of Float LSH 8-31-1 Deduct ($665.00)
Extend Conduit to N. E. Corner of UV Building Add 390.00
Wiring from N. E. Comer J -Box to 180 -PLC -1 Add 622.00
Provide GFCI Outlet at 260-HVU-1 Add 694.00
Relocate Interior Outlets and Remove Exterior Outlets .Add 754.00
$1,795.00
Administration of the Change .Add 584.00
Bonds and Insurance Add 30.00
Fee Add 121.00
TOTAL $2,530.00
Story Construction Co.
Contractor
AECOM
Designer
City of Waterloo, Iowa
Owner
[ 1 Recommend Acceptance [ ] Accepted
[ ] Do Not Recommend Acceptance [ ] Not Accepted
BY_;_ -4,41-- __ By: By
Date: ? A Date: Date:
cc: Field
File