Loading...
HomeMy WebLinkAboutAecom Technical Services-6/3/2013A=COM May 20, 2013 Mr. Larry Smith Water Pollution Control Facilities 3505 Easton Avenue Waterloo, Iowa 50702 Subject: Waterloo WPCF UV Disinfection Facilities City Contract No. 817 AECOM #60184375 Dear Larry, AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com Enclosed please find two (2) copies of Change Order No. 2 to the above -referenced project. The change order reflects some additional electrical work primarily associated with relocation of the float and is for a net increase in the Contract Amount of $2,530.00. The change order reflects an increase of approximately 0.06%. The project is very nearly completed, and we do not anticipate any significant change order items through project completion. We have discussed the change order previously. If you have any questions or if you need anything further from us at this time, please let us know. Yours sincerely, Robert E. Bamsey Enclosures: As Noted c: Ms. Suzy Schares (w/enclosure) P:1602709631200_CorrespondencetsCO2.docx CHANGE ®" IE Owner. City of Waterloo, Iowa Project Waterloo WPCF— UV Disinfection NOE2 Date: May 20, 2013 Owner's Contract No.: 817 Date of Contract Start: May 29, 2012 Contractor: Story Construction, Co. $ 4,123,000 You are directed to make the following changes in the Contract Documents. Description: See attached change request summary (5/10/13). Reason for Change Order: Additional electrical work. CONTRACT PRICE CONTRACT TIMES To Completion Original: $ 4,123,000.00 Original: April 30, 2013 Previous C.O.s (ADD/DEDUCT): $ 38,777.00 Previous C.O.s (ADD/DEDUCT): This C.O. (ADDS): $ 2,530.00 This C.O. (ADD/DEDUCT): Contract Price With All Approved Change Orders: $ 4,164,307.00 REVISED: April 30, 2013 Original Completion Date: April 30, 2013 Revised Completion Date: April 30, 2013 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO By: OAuthorized Signature) ` Date: ACCEPTED: By: Cotitfactor4Authorized Signature) Date: P:Y02709631600_CRSt606_Constmaion Contract Changes1606.I Chatge_Orders\CO2.doc AECOM 60270963.600 2 Project No. Change Order No. _ = CONSTRUCTION Change Request Summary PROJECT: Disinfection Facilities Easton Avenue Water Pollution Control Facility Waterloo, Iowa CHANGE REQUEST NO.: CR- 10 DATE: May 10, 2013 PROPOSED CHANGE DESCRIPTION Miscellaneous electrical items listed below. Schedule Impact: NONE Proposal Qualifications: NONE . Proposal valid for 14 days. Attachments: Quotation from Schammel Electric SUMMARY OF COST BREAKDOWN: Quotation from Schammel Electric Delete Relocation of Float LSH 8-31-1 Deduct ($665.00) Extend Conduit to N. E. Corner of UV Building Add 390.00 Wiring from N. E. Comer J -Box to 180 -PLC -1 Add 622.00 Provide GFCI Outlet at 260-HVU-1 Add 694.00 Relocate Interior Outlets and Remove Exterior Outlets .Add 754.00 $1,795.00 Administration of the Change .Add 584.00 Bonds and Insurance Add 30.00 Fee Add 121.00 TOTAL $2,530.00 Story Construction Co. Contractor AECOM Designer City of Waterloo, Iowa Owner [ 1 Recommend Acceptance [ ] Accepted [ ] Do Not Recommend Acceptance [ ] Not Accepted BY_;_ -4,41-- __ By: By Date: ? A Date: Date: cc: Field File 300 South Bell Ave Ames, IA 50010-7707 515.232.4358 515.232.0599 fax www.storycon.com GENERAL CONSTRUCTION DESIGN+BUILD CONSTRUCTION MANAGEMENT