Loading...
HomeMy WebLinkAboutIowa Department of Transportation-7/8/2013Form 830240wd 7/00 , lowa Department of Transportation `vitChange Order Non -Substantial: Part Non - Part No. 9 Substantial: ❑ ❑ 12 / 07 /12 Contract Accounting_ ID No.: 28335 County Black Hawk Project No: STP -E -8155(721)-8V-07 Kind of Work: P.C.C. Trail Date Prepared: 12-05-12 Contractor: Vieth Construction Corporation Concurrence Date You are hereby authorized to make the following changes to the contract documents. A - Description of change to be made or extra work to be done: 7004 — Item 1 - Clearing and Grubbing 7005 — Item 3 - Excavation, Class 10, Waste 7006 — Item 11 - Removal of Concrete 7007 — Item 14 - Structural Concrete (Miscellaneous) 7008 — Item 17 - Recreational Trail, PCC, 6° 7009 — Item 18 - Removal of Sidewalk 7010 — Item 20 - Combined Concrete Sidewalk and Retaining Wall 7011 — Item 21 - P.C. Concrete Retaining wall — Reason for change or extra work: 7004 — 7011. Contract Quantities adjusted for field changes on plan quantity bid items. 7008 and 7010. A significant change was made during construction to change approximately 280 lineal feet of recreational trail to combined concrete sidewalk and retaining wall adjacent to the rip rap face of the flood control levee. CITY OF f Ott 00 ro€d 7 s Nta or DatEe y BY: (Continued on reverse side) Approved -4 1 Director, ce ystems Planning Date Receipt is ackn ged of this change or extra work and terms of settlement are hereby agree of 77-7( ATTEST: 7- tl M CityrClerk mare Approved contingent upon funds being available under the existing project agreement or upon additional Federal -aid funds being made available by a modified project agreement. Date For the Division Administrator Federal Highway Administration Date 17113 /17_,. Date Contractor By frc - (11€704 Approved Date Assistant Construction Engineer Date DISTRIBUTION: Project Engineer— Forward original to District. District— Nortsubstantial — Forward original and one copy to the Office of Construction and two copies back to the Project Engineer. - Substantial - Forward original and two copies to the Office of Construction. TOTAL Accounting ID No. 1 12 18 13 13 15 1 2 3 4 5 6 C-1 —Settlement for cost of work to be made as follows: Change Order No. 9 7004 — 7011— Contractor will be paid bid prices for all work completed. C-2 — Justification for cost(s) 7004 — 7011 — Contractor quantity adjustment required to meet field conditions on plan quantity items. No additional working days will be added to contract for this work. D — ITEMS INCLUDED IN CONTRACT If Credit Add "CR» Change No. Line Item Number Unit Price .xxx Quantity .xxx Amount .xx 7004 Item 1 - Clearing and Grubbing 8,000.00 0.10 800.00 7005 Item 3 - Excavation, Class 10, Waste 19.00 100.00 1900.00 7006 Item 11 - Removal of Concrete 875.00 4.00 3500.00 7007 Item 14 - Structural Concrete (Miscellaneous) 1075.00 3.10 3332.50 7008 Item 17 - Recreational Trail, PCC, 6" 46.00 CR (372.42) CR (17,131.32) 7009 Item 18 - Removal of Sidewalk 15.00 8.33 124.95 7010 Item 20 - Combined Concrete Sidewalk and Retaining Wall 700.00 97.72 68,404.00 7011 Item 21 - P.C. Concrete Retaining wall 745.00 CR (20.50) CR (15,272,50) E — ITEMS NOT INCLUDED IN CONTRACT 45,657.63 If Credit, Add "CR" Change No. Item Description Item Number Function Code Unit Price .xxx Quantity .xxx Amount .xx TOTAL