Loading...
HomeMy WebLinkAboutAecom Technical Services-7/22/2013A=COM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com FY 2014 VERTICAL INFRASTRUCTURE PROJECTS IDOT PROJECT NO. 91140AL0200 WATERLOO REGIONAL AIRPORT WATERLOO, IOWA Project Description - See Attachment Scope of Services - See Attachment Compensation A. Compensation for services will be on an hourly basis in accordance with the hourly fees and other direct expenses in effect at the time the services are performed for a not -to - exceed fee of Eighteen Thousand Six Hundred Dollars ($18,600.00) without authorization of the Client. General Conditions Except as specifically amended by this agreement, services shall be provided in accordance with the Consultant Services Agreement for the Waterloo Regional Airport between AECOM Technical Services, Inc., and the Waterloo Airport Board dated December 5, 2008. APPROVED: CITY OF WATERLOO, IOWA APPROVED: AECOM TECHNICAL SERVICES, INC. By _ ;. B Ernest G. Clark, Mayor Douglas W. S Indel, P.E. Date Date Associate Vice President July 16, 2013 SCOPE OF SERVICES FY 2014 VERTICAL INFRASTRUCTURE PROJECTS IDOT PROJECT NO. 91140AL0200 WATERLOO REGIONAL AIRPORT WATERLOO, IOWA 1. Project Description The project is described as the projects associated with the Iowa Department of Transportation FY 2014 Vertical Infrastructure Projects. Projects identified in the grant include the following: 1. Hangar #2 Rehabilitation — Replacement of Bi -Fold Door — The bi-fold door on Hangar #2 is a 60 -foot wide door from original construction in 1981. This project to be funded by FY 14 Vertical Infrastructure Grant. 2. Aircraft Maintenance Hangar #4 Rehabilitation — The north and south walls of this 50 -year old building currently allow water to get through the walls and leak onto the hangar storage area. The roofing has been replaced and appears to be in good condition. This project to be funded by FY14 Vertical Infrastructure Grant. II. Scope of Services The work to be performed by the Consultant includes the following tasks: 1. Data Collection and Review. This task consists of the collection of existing data applicable to this project and related to the proposed work site. The record drawings of completed projects and utility information will be compiled as background information for the project. As part of this task, a field survey will be performed to collect dimensional sketches as necessary for the bi-fold door replacement and to investigate the walls of Hangar #4. The Client shall coordinate with lease holders of each of the hangar units so that the Consultant can gain access to these in a timely manner for the purpose of survey, investigation, and photographic documentation of the hangar spaces. 2. Final Design. This task consists of the preparation of the final bid documents for this project, including specifications, drawings (if required) and cost estimates. The final plans and/or specifications will set forth the requirements of the design phase. 3. Final Project Specifications. This task consists of the preparation of specifications for the project. The specifications will be in compliance with current City of Waterloo and Iowa Department of Transportation requirements in effect at the time the specifications are prepared. 4. Estimate of Probable Construction Cost. This task consists of the preparation of an estimate of construction costs based upon the plans and specifications. This statement of probable construction cost prepared by the Consultant represents the Consultant's best judgment as a design professional at the time the estimate is drawn. It is recognized, however, that neither the Consultant nor the Client has any control over the cost of labor, materials or equipment; over the contractor's method of determining bid prices; or over competitive bidding or market conditions. Accordingly, the Consultant cannot and does not guarantee that bids will not vary from any Statement of Probable Construction Cost or other cost estimates prepared by the Consultant. 5. Quality Review. This task consists of the quality review of work elements on the project. During the course of this project, quality reviews will be conducted by senior technical personnel not directly involved in the project. 6. Bid Assistance. This task consists of assisting the Client in advertising for and receiving bids or quotes, analyzing the bids or quotes received and preparing a recommendation to the Client for award of contract. 7. Bid Document Interpretation. This task consists of answering bid document interpretation questions from bidders, preparing and issuing any required addenda. 8. Resident Review. This task consists of limited on-site construction review at key critical construction operations to observe construction operations to determine compliance with contract documents. Site reviews will be documented in a construction journal. Coordination with airport tenants related to this project will be the responsibility of the Client. 9. Project Administration. This task consists of office administration and coordination of the project. Interoffice meetings, general day-to-day administrative responsibilities, and typing of interoffice memoranda and minutes of meetings are included in this task. L:\work\ADMI NWGREE\PROF\WatAirFY141 DOTVertlnfra.doc