Loading...
HomeMy WebLinkAboutPeterson Contractor's Inc.-8/12/2013WAYNE CLAASSEN ENGINEERING AND SURVEYING, INC. 2705 University Avenue P.O. Box 898 WATERLOO, IA 50704 Phone: 319-235-6294 Fax: 319-235-0028 TO City of Waterloo Leisure Services Director 1101 Campbell Ave. Waterloo, IA 50701 LETTER OF TRANSMITTAL DATE: August 2, 2013 JOB NO: ATTENTION: Paul Huting RE: Riverview Recreation Area Passive Area Unit Enhancements City Contract No. 815 WE ARE SENDING YOU 0 Attached 0 Under separate cover via O Shop drawings 0 Prints 0 Plans 0 Samples the following items: 0 Specifications O Copy of letter 0 Change order 0 COPIES DATE NO. DESCRIPTION 1 Change Orders 1-3 THESE ARE TRANSMITTED as checked below: O For approval ❑ For your use O As requested ❑ For review and comment ❑ FOR BIDS DUE REMARKS ❑ No exceptions taken ❑ Exceptions are noted ❑ Revise and resubmit ❑ Rejected ❑ Submit copies for distribution ❑ Return corrected prints 0 20 0 PRINTS RETURNED AFTER LOAN TO US COPY TO: FILE SIGNED: If enclosures are not as noted, kindly notify us at once. (Folder\Transmittals\City of Waterloo -Leisure Services -Riverview Recreation Area-3.tjn) omas'J. Noonan Firm 830240wd 04-08 Iowa Department of Transportation Non - Change Order Part Part Non -Substantial: 0 0 No. 1 -Final Accounting Substantial: 0 0 Contract Accounting ID No.: County Black Hawk 331 o5- Concurrence s Concurrence Date Project No: City of Waterloo Contract No. 815 Kind of Work: P.C.C. Pavement-Grade/New Date Prepared: 8/16/2012 Contractor: Peterson Contractor's, Inc. You are hereby authorized to make the following changes to the contract documents. A - Description of change to be made or extra work to be done: Item 7001: Item 2: Silt Fence. Decrease 377 L.F. Item 7002: Item 3: Excavation, Class 10. Decrease 221 C.Y. Item 7003: Item 4: Topsoil, Strip, Stockpile and Spread. Decrease 174 C.Y. Item 7004: Item 5: Seeding and Fertilizing (Urban Mix). Decrease 0.10 Acre Item 7005: Item 8: Sidewalk, Trail, 6 -Inch P.C.C., C-4 Mix. Increase 21.57 S.Y. Item 7006: Item 9: Sidewalk, Fishing Jetty, 6 -Inch P.C.C., C-4 Mix. Increase 13.62 S.Y. Item 7007: Item 10: Curb and Gutter, 6 -Inch x 2' P.C.C.. Increase 31.73 L.F. B — Reason for change or extra work: Item 7001: Item 2: Silt Fence. Quantity not required for construction. Item 7002: Item 3: Excavation, Class 10. Item replaced with Contractor -furnished borrow. Item 7003: Item 4: Topsoil, Strip, Stockpile and Spread. Item replaced with Contractor -furnished topsoil. Item 7004: Item 5: Seeding and Fertilizing (Urban Mix). Item replaced with lump sum item. Item 7005: Item 8: Sidewalk, Trail, 6 -Inch P.C.C., C-4 Mix. Quantity required for construction. Item 7006: Item 9: Sidewalk, Fishing Jetty, 6 -Inch P.C.C., C-4 Mix. Quantity required for construction. Item 7007: Item 10: Curb and Gutter, 6 -Inch x 2' P.C.C. Quantity required for construction. (Continued on rev ' e side) n Approved c .,<. (-72 ? $-0a-/ 3 City of Waterloo Date Receipt is acknowledged of this change or extra work and terms of settlement are her .y agreed to. ect n.ineer Approved contingent upon funds being available under the existing project agreement or upon additional Federal -aid funds being made available by a modified project agreement. Date For the Division Administrator Federal Highway Administration Pef�rcon Coi1-1- /1,c+ars,. G. (<octor � aCo Approved Date Date Assistant Construction Engineer Date DISTRIBUTION: Project Engineer— Forward original to District. District — Nonsubstantial — Forward original and one copy to the Office of Construction and two copies back to the Project Engineer. - Substantial - Forward original and two copies to the Office of Construction. C-1 —Settlement for cost of work to be made as follows: Accounting ID No. II I 111 1 2 3 4 5 6 Change Order No. 1 Item 7001: Item 2: Silt Fence. Contract Unit Price $2.50/L.F. Item 7002: Item 3: Excavation, Class 10. Contract Unit Price $12.00/C.Y. Item 7003: Item 4: Topsoil, Strip, Stockpile and Spread. Contract Unit Price $12.00/C.Y. Item 7004: Item 5: Seeding and Fertilizing (Urban Mix). Contract Unit Price $11,000.00/Acre Item 7005: Item 8: Sidewalk, Trail, 6 -Inch F.C.C., C-4 Mix. Contract Unit Price $34.00/ S.Y. Item 7006: Item 9: Sidewalk, Fishing Jetty, 6 -Inch P.C.C., C-4 Mix. Contract Unit Price $34.00/S.Y. Item 7007: Item 10: Curb and Gutter, 6 -Inch x 2' P.C.C.. Contract Unit Price $14.50/ L.F. C-2 — Justification for cost(s) D - ITEMS INCLUDED IN CONTRACT If Credit Add "CR" Item Number Change No. Line Item Number Unit Price .xxx Quantity .xxx Amount .xx 7 001 Item 2: Silt fence $2.5000 (377.000) CR($942.50) 7 002 Item 3: Excavation, Class 10 $12.000 (221.000) CR($2652.00) 7 003 Item 4: Topsoil, Strip, Stockpile and Spread $12.000 (174.000) CR($2088.00) 7 004 Item 5: Seeding and Fertilizing (Urban Mix) $11,000.000 (0.100) CR($1100.00) 7 005 Item 8: Sidewalk, Trail, 6 -Inch P.C.C., C-4 Mix $34.000 21.570 $733.38 7 006 Item 9: Sidewalk, Fishing Jetty, 6 -inch P.C.C., C-4 Mix $34.000 13.620 $463.08 7 007 Item 10: Curb and Gutter, 6 -inch x 2' P.C.C. $14.5000 31.730 $460.09 TOTAL CR($5125.95) -- ITEMS NOT INCLUDED IN CONTRACT If Credit, Add "CR" Change No.Item Description Item Number Function Code Unit Price .xxx Quantity .xxx Amount .xx 8 8 8 8 8 8 8 TOTAL 1,.. ,830240wd 04-08 77 �® Iowa Department of Transportation Non Change Order Part Part Non -Substantial: ❑ ❑ No. 2 -Final Accounting Substantial: 0 0 Contract Accounting ID No.: County Black Hawk Concurrence Date Project No: City of Waterloo Contract No. 815 Kind of Work: P.C.C. Pavement-Grade/New Date Prepared: 8/16/2012 Contractor: Peterson Contractor's, Inc. You are hereby authorized to make the following changes to the contract documents. A - Description of change to be made or extra work to be done: Item 7008: Item 11: Modified Subbase, Granular, 6 -Inch Compacted Thickness. Increase 18.54 C.Y. Item 7009: Item 12: Macadam Stone. Increase 20.17 Tons Item 7010: Item 13: Erosion Stone. Decrease 279.63 Tons Item 7011: Item 14: Revetment, Class E Riprap. Decrease 1576.38 Tons Item 7012: Item 15: Flowable Mortar. Decrease 24 C.Y. Item 7013: Item 16: Remove and Replace Park Bench. Decrease 1 Each Item 7014: Item 17: Remove and Relocate Bike Rack. Decrease 1 Each B - Reason for change or extra work: Item 7008: Item Item 7009: Item Item 7010: Item Item 7011: Item Item 7012: Item Item 7013: Item Item 7014: Item 11: Modified Subbase, Granular, 6 -Inch Compacted Thickness. Quantity required for construction. 12: Macadam Stone. Quantity required for construction. 13: Erosion Stone. Quantity not required for construction. 14: Revetment, Class E Riprap. Quantity not required for construction. 15: Flowable Mortar. Quantity not required for construction. 16: Remove and Replace Park Bench. Item to be completed by Owner. 17: Remove and Relocate Bike Rack. Item to be completed by Owner. (Continued on rev-; side) Approved City of Waterloo Receipt is acknowledged of this change or extra work and terms of settlement are here Approved contingent upon funds being available under the existing project agreement or upon additional Federal -aid funds being made available by a modified project agreement. /4-is-i_3� J - Z7-1 2-. Date Pct Engi eer Date Date For the Division Administrator Federal Highway Administration agreed to. trsOY Go t- athr4 J G ontr- ctor Approved Assistant Construction Engineer Date Date DISTRIBUTION: Project Engineer— Forward original to District. District — Nonsubstantial — Forward original and one copy to the Office of Construction and Ma copies back to the Project Engineer. - Substantial - Forward original and two copies to the Office of Construction. Accounting ID No. 1 1 1 1 I I 1 2 3 4 5 6 C-1 —Settlement for cost of work to be made as follows: Change Order No. 2 Item 7008: Item 11: Modified Subbase, Granular, 6 -Inch Compacted Thickness. Contract Unit Price $56.00/C.Y. Item 7009: Item 12: Macadam Stone. Contract Unit Price $20.00/Ton Item 7010: Item 13: Erosion Stone. Contract Unit Price $30.00/Ton Item 7011: Item 14: Revetment, Class E Riprap. Contract Unit Price $26.00/Ton Item 7012: Item 15: Flowable Mortar. Contract Unit Price $105.00/C.Y. Item 7013: Item 16: Remove and Replace Park Bench. Contract Unit Price $100.00/Each Item 7014: Item 17: Remove and Relocate Bike Rack. Contract Unit Price $100.00/Each C-2 — Justification for cost(s) D - ITEMS INCLUDED IN CONTRACT If Credit Add "CR" Item Number Change No. Line Item Number Unit Price .xxx Quantity .xxx Amount .xx 7 008 Item 11: Modified Subbase, Granular, 6 -Inch Compacted Thickness $56.000 18.540 $1038.24 7 009 Item 12: Macadam Stone $20.000 20.170 $403.40 7 010 Item 13: Erosion Stone $30.000 (279.630) CR($8388.90) 7 011 Item 14: Revetment, Class E Riprap $26.000 (1576.380) CR($40,985.88 ) 7 012 Item 15: Flowable Mortar $105.000 (24.000) CR($2520.00) 7 013 Item 16: Remove and Replace Park Bench $100.000 (1.000) CR($100.00) 7 014 Item 17: Remove and Relocate Bike Rack $100.000 (1.000) CR($100.00) TOTAL CR($50,653.14 ) E - ITEMS NOT INCLUDED IN CONTRACT If Credit, Add "CR" Change No. Item Description Item Number Function Code Unit Price .xxx Quantity .xxx Amount .xx 8 8 8 8 8 8 8 TOTAL Form 830240wd 04-08 �Iowa Department of Transportation Non- 'war on- Change Order Part Part Non -Substantial: ❑ 0 No. 3 -Final Accounting Substantial: 0 0 Contract Accounting ID No.: County Black Hawk Concurrence Date Project No: City of Waterloo Contract No. 815 Kind of Work: P.C.C. Pavement-Grade/New Date Prepared: 10/08/2012 Contractor: Peterson Contractor's, Inc. You are hereby authorized to make the following changes to the contract documents. A - Description of change to be made or extra work to be done: Item 7015: Item 18: Grout Holes in PCC Trail. Decrease 1 Lump Sum Item 8001: Revetment, Riprap, Contractor -Furnished. 3231.87 Tons Item 8002: Class 10 Borrow, Contractor -Furnished 72 C.Y. Item 8003: Topsoil, Furnish and Place. 120 C.Y. Item 8004: hydro Fertilize, Seed and Mulch. 1 Lump Sum B — Reason for change or extra work: Item 7015: Item 18: Grout Holes in PCC Trail. Quantity not required for construction. Item 8001: Revetment, Riprap, Contractor -Replacement for Item 7011(Item 14). Itein 8002: Class 10 Borrow, Contractor -Replacement for Item 7002 (Item 3). Item 8003: Topsoil, Furnish and Place. Replacement for Item 703 (Item 4). Item 8004: Hydro Fertilize, Seed and Mulch. Replacement for Item 7004 (Item 5). (Continued on re side) Approved City of Waterloo Receipt is acknowledged of this change or extra work and terms of settlement are hereby agreed to. f-/2-/ 3.,'reet2N-- ct n ineer Date j oje g Approved contingent upon funds being available under the existing project agreement or upon additional Federal -aid funds being made available by a modified project agreement. Date For the Division Administrator Federal Highway Administration Pe 7_31-13 Date C on -Era c+ors, Inc, actor % j7 Approved Date Assistant Construction Engineer Date DISTRIBUTION: Project Engineer— Forward original to District. District — Nonsubsfanlal — Forward original and one copy to the Office of Construction and two copies back to the Project Engineer. - Substantial - Forward original and two copies to the Office of Construction. Accounting ID No. 1 2 3 4 5 6 C-1 —Settlement for cost of work to be made as follows: Change Order No. 3 Item 7015: Item 18: Grout Holes in PCC Trail. Contract Unit Price $100.00 Lump Sum Item 8001: Revetment, Riprap, Contractor -Furnished. Agreed Upon Price $18.00/Ton Item 8002: Class 10 Borrow, Contractor -Furnished Agreed Upon Price $12.00/C.Y. Item 8003: Topsoil, Furnish and Place. Agreed Upon Price $21.00/C.Y. Item 8004: Hydro Fertilize, Seed and Mulch. Agreed Upon Price $3872.00 Lump Sum C-2 — Justification for cost(s) D — ITEMS INCLUDED IN CONTRACT If Credit Add"CR" ChangeItem No. Change No. Line Item Number Unit Price .xxx Quantity .xxx Amount .xx 7 015 Item 18: Grout Holes in PCC Trail $100.000 (1.000) CR($100.00) 7 3231.870 $58,173.66 72.000 $864.00 8002 _ 8003 Topsoil, Furnish and Place 7 $21.000 120.000 $2520.00 8004 7 $3872.000 1.000 7 8 7 8 7 TOTAL CR($100.00) If Credit, E — ITEMS NOT INCLUDED IN CONTRACT AM -UK I ChangeItem No. Description Item Number Function Code Unit Price .xxx Quantity .xxx Amount .xx 8001 Revetment, Riprap, Contractor -Furnished Class 10 Borrow, Contractor -Furnished $18.000 $12.000 3231.870 $58,173.66 72.000 $864.00 8002 _ 8003 Topsoil, Furnish and Place $21.000 120.000 $2520.00 8004 Hydro Fertilize, Seed and Mulch $3872.000 1.000 $3872.00 8 8 8 TOTAL $65,429.66