Loading...
HomeMy WebLinkAboutKWS Inc-9/16/2013CITY OF WATERLOO, IOWA Traffic Operations Department FINAL CHANGE ORDER CONTRACT MODIFICATION No. 1 (FINAL) Contract No.: Kind of Work: Traffic Signals Contractor. KWS Traffic Operations Project Number. TRF -191 Project No: CS -TSF -8155(725)- -85-07 Date Prepared: September 6. 2013 The above referenced contract between City of Waterloo and KWS Inc. is hereby modified as described in this Modification document. The final cost of the protect is $64.621.60. A - Description of change to be made or extra work to be done: 1- Adjusting for pavement quantities. B — Reason for change or extra work: 1- Actual pavement marking was more than the contract quantities. C-1 —Settlement for cost of work to be made as follows: 1- Increase from $630.40 to $793.60 C-2 — Justification for cost(s) 1- Quantity adjustment per contract unit price D — ITEMS INCLUDED IN CONTRACT E — ITEM None. Change No. Line Item Number Unit Price Quantity Arnount 1 5 160 1.02 163:20 TOTAL $163.20 Approved: 4-12-2o13 Project Engineer Date Receipt is acknowledged of this modification and terms of settlement are hereby agreed to. For City of Waterloo: Name: Signature: Date: For Contractor: Name: Title: Signature: ✓/��" Title: Date: clif3J/3