HomeMy WebLinkAboutKWS Inc-9/16/2013CITY OF WATERLOO, IOWA
Traffic Operations Department
FINAL CHANGE ORDER CONTRACT MODIFICATION
No. 1 (FINAL)
Contract No.:
Kind of Work: Traffic Signals
Contractor. KWS
Traffic Operations Project Number. TRF -191
Project No: CS -TSF -8155(725)- -85-07
Date Prepared: September 6. 2013
The above referenced contract between City of Waterloo and KWS Inc. is hereby modified as described in this Modification document. The final
cost of the protect is $64.621.60.
A - Description of change to be made or extra work to be done:
1- Adjusting for pavement quantities.
B — Reason for change or extra work:
1- Actual pavement marking was more than the contract quantities.
C-1 —Settlement for cost of work to be made as follows:
1- Increase from $630.40 to $793.60
C-2 — Justification for cost(s)
1- Quantity adjustment per contract unit price
D — ITEMS INCLUDED IN CONTRACT
E — ITEM
None.
Change
No.
Line Item Number
Unit Price
Quantity
Arnount
1
5
160
1.02
163:20
TOTAL
$163.20
Approved:
4-12-2o13
Project Engineer Date
Receipt is acknowledged of this modification and terms of settlement are hereby agreed to.
For City of Waterloo:
Name:
Signature:
Date:
For Contractor:
Name:
Title: Signature: ✓/��" Title:
Date: clif3J/3