HomeMy WebLinkAboutChicago, Central & Pacific Railroad Company-10/14/2013Council Communication City Council Meeting: October 14, 2013 Prepared: October 8, 2013 Dept. Head Signature: Eric Thorson, City Engineer # of Attachments: _ SUBJECT: Submitted by: NEVADA STREET RAILROAD CROSSING - COOPERATIVE SURFACE REPAIR AGREEMENT WITH CC&P RAILROAD Jeff Bales, Associate Engineer Recommended City Council Action: Approve Cooperative Surface Repair Force Account Agreement and authorize Mayor to sign and enter into said agreement. Summary Statement This agreement includes the railroad reconstructing 75 lineal feet of surface crossing under one track using rubber materials. The City agrees to contract out the asphalt work in constructing the approaches and tapers. The roadway traffic control costs are the responsibility of the City. The total estimated cost of the project is $87,927, The City agrees to incur 20% of the project costs. With traffic control costs, this is estimated to be $18,085. This agreement is available in the City Clerk's office if you wish to review it in its entirety. Expenditure Required $18,085 Source of Funds Local Option Sales Tax revenue Policy Issue N/A Alternative N/A Background Information: Recently, the Chicago Central and Pacific Railroad Company discovered that the surface crossing material at one set of tracks at the Nevada Street crossing is failing and is in immediate need of replacing. Traditionally, the City and railroad would jointly apply for funds to reconstruct a crossing under the Iowa Grade Crossing Surface Repair Fund. Under this state program the City incurs 20% of the project costs. Therefore, the CC&P has proposed the City incur 20% of the Nevada Street surface crossing replacement. COOPERATIVE SURFACE REPAIR FORCE ACCOUNT AGREEMENT C&te I I IZg C-8383, 007 This AGREEMENT is between CITY OF WATERLOO, IOWA, hereinafter referred to as the HIGHWAY AUTHORITY, and CHICAGO, CENTRAL & PACIFIC RAILROAD COMPANY, hereinafter referred to as the COMPANY. The HIGHWAY AUTHORITY and the COMPANY agree to repair the at -grade crossing located at West Donald Street, Waterloo, Iowa, and further agree as follows; SECTION I. Work Statement and Performance. The COMPANY and the HIGHWAY AUTHORITY have determined the extent of the repair to be performed at this crossing, including railway, roadway approach modifications, and replacement of any existing sidewalks and/or recreational trails. This repair shall conform to the COMPANY and HIGHWAY AUTHORITY Standards. The agreed work, generally described in the Work Statement identified as Exhibit "A" attached hereto and made part of this Agreement, is to be performed by COMPANY forces, except the COMPANY may subcontract performance of other required incidental work. The HIGHWAY AUTHORITY will be responsible to have any existing sidewalk(s) and/or recreational trail(s) replaced by a contractor or their own forces, in accordance with the Americans with Disabilities Act requirements. In the absence of any specific HIGHWAY AUTHORITY standards that are acceptable to the COMPANY, the Iowa Department of Transportation's Standard Road Plan MI -220 shall be used. As per Standard Road Plan MI -220, the detectable warning is to be installed twelve feet (12') from the edge of the nearest rail, and the sidewalk is a minimum width of five feet (5'). The project will include the cost of an additional two feet of sidewalk and/or recreational trail, or to the nearest sidewalk and/or recreational trail joint, whichever is less, beyond the detectable warning. Any additional new sidewalk and/or recreational trail beyond that point will be paid by the HIGHWAY AUTHORITY and is not part of this project. Truncated domes are the only detectable warnings allowed by ADA Accessibility Guidelines. Grooves, exposed aggregate, and other designs intended for use as detectable warning are too similar to pavement textures, cracks and joints, and are not considered equivalent facilitation, and do not comply with ADA requirements. Future maintenance of the sidewalk(s) and detectable warning device will not be the responsibility of the COMPANY. The HIGHWAY AUTHORITY will coordinate and have the approaches completed. The HIGHWAY AUTHORITY will have the invoice(s) provided by the contractor(s) for costs for the sidewalk, and/or recreational trail, and approach work to the COMPANY for payment and inclusion into total Project costs billable under this Agreement. SECTION II. Cost Estimate. The overall estimated cost of the project work, which shall be provided by the COMPANY, is itemized on Exhibit "B" attached hereto and made a part hereof. Exhibit "B" shall also include an amount equal to the HIGHWAY AUTHORITY's cost estimate for the asphalt and sidewalk and/or recreational trail costs. SECTION III. Work Start and Completion. The COMPANY shall begin the construction of the project as soon as possible after the date the HIGHWAY AUTHORITY signs this Agreement. Costs incurred by either party directly related to the project prior to the HIGHWAY AUTHORITY signing the Agreement may be reimbursable under this Agreement. Cost incurred by the COMPANY more than eighteen (18) months after the HIGHWAY AUTHORITY signs this Agreement will not be reimbursed unless the COMPANY has requested in writing, prior to expiration of the Agreement, and received from the HIGHWAY AUTHORITY a written extension of time for completion. The HIGHWAY AUTHORITY shall have complete discretion, and be the sole authority to grant or deny extensions. Costs incurred for work following the extension time will not be reimbursed. SECTION N. Traffic Control. The roadway will be closed during repair. Exhibit "A" describes specific closure conditions. The HIGHWAY AUTHORITY is responsible for the establishment and payment for traffic control (i.e.: barricades, signing, detours, detour damage, and runarounds). The COMPANY shall advise the HIGHWAY AUTHORITY fourteen (14) days in advance of the actual starting date to allow the HIGHWAY AUTHORITY adequate time to provide and install appropriate signs on the detour. SECTION V. Work Notification. The COMPANY shall notify the HIGHWAY AUTHORITY's Contact Person no later than fourteen (14) days prior to the start of its work at the crossing. The HIGHWAY AUTHORITY shall be given ample opportunity to document the materials, equipment, and labor required to complete the project. The HIGHWAY AUTHORITY shall have the right to inspect the project work at any time on -track protection is provided by the COMPANY. SECTION VI. Project Completion. After the COMPANY has completed the required work, the COMPANY shall notify the HIGHWAY AUTHORITY in writing. The HIGHWAY AUTHORITY shall arrange an inspection with the COMPANY to determine whether the project work has been completed in accordance with the terms of this Agreement or Amendments thereto. Pavement markings and stop lines shall be placed by the HIGHWAY AUTHORITY as required by Part 8 of the Manual on Uniform Traffic Control Devices for Streets and Highways. If the existing traffic control devices at a multiple -track highway -rail grade crossing become improperly placed or inaccurate because of removal of some of the tracks, the existing devices shall be relocated and/or modified at COMPANY expense pursuant to the Manual On Uniform Traffic Control Devices, Part 8. If the roadway is widened or relocated, the existing devices shall be relocated and/or modified at HIGHWAY AUTHORITY expense pursuant to the Manual On Uniform Traffic Control Devices, Part 8. Relocation of the traffic control devices will be completed prior to removal of the detour. When the work has been completed in accordance with the Agreement, the COMPANY and HIGHWAY AUTHORITY shall sign a Certificate of Completion and Acceptance form at the project site following final inspection. SECTION VII. Reimbursable Costs. The COMPANY will keep an accurate and detailed account of actual and necessary reimbursable costs incurred under this Agreement. The cost of labor, material, all associated additives and subcontracted work costs are reimbursable, and shall be billed on a force account basis in accord with Title 23 Code of Federal Regulations, Part 140, Subpart I. The cost of preliminary project engineering, construction inspection, track inspection, relocation of existing signals, signal wires, and switches, or the construction of runarounds will not be eligible project reimbursable costs. SECTION VIII. Cost Sharing. The HIGHWAY AUTHORITY agrees to incur a cost equal to twenty percent (20%) of the reimbursable costs defined in SECTION VII for work described in Exhibit "A". SECTION IX. Progressive Payments. The COMPANY may submit accurate progressive bills prior to project completion to the HIGHWAY AUTHORITY for material, labor, and subcontracted costs included in Exhibit "B". The billing for material shall be for those materials that have been delivered to the project site or specifically purchased and delivered to the COMPANY for use on the project. The HIGHWAY AUTHORITY will make progressive payments to the COMPANY for one hundred percent (100%) of their billed participation. SECTION X. Final Billing. If applicable, the HIGHWAY AUTHORITY will submit a detailed billing to the COMPANY for the actual sidewalk and/or recreational trail replacement, and asphalt approach costs. Upon completion of the project the COMPANY shall submit an accurate final itemized billing. The final bill shall include a summary of all incurred costs. SECTION XI. Final Payment. The HIGHWAY AUTHORITY shall make payment equal to twenty percent (20%) of the COMPANY final billing, less previous payment, within thirty (30) days of its receipt of the COMPANY final billing. In the event of overpayment by the HIGHWAY AUTHORITY as determined by an audit by the HIGHWAY AUTHORITY audit of COMPANY records, the COMPANY shall pay the HIGHWAY AUTHORITY the amount of overpayment within thirty (30) days of its receipt of the HIGHWAY AUTHORITY final audit. The HIGHWAY AUTHORITY shall perform any desired audit within one hundred eighty (180) days of final billing. After the one hundred eighty (180) day period without an audit being made by the HIGHWAY AUTHORITY, the COMPANY's expenses and work as submitted shall be considered reasonable, proper, and final. SECTION XII. Maintenance and Abandonment. Upon completion of the project, the COMPANY shall maintain the crossing surface to provide a safe and sufficient crossing for vehicular travel. If the track is removed from both sides of the crossing, the COMPANY shall remove the surface material, rail and cross ties from the crossing and shall restore the roadway void to the satisfaction of the HIGHWAY AUTHORITY, all at COMPANY expense. If the existing traffic control devices at a multiple -track highway -rail grade crossing become improperly placed or inaccurate because of removal of some of the tracks, the existing devices shall be relocated and/or modified at COMPANY expense pursuant to the Manual on Uniform Traffic Control Devices, Part 8. Future maintenance of the sidewalk(s) and detectable warning device will not be the responsibility of the COMPANY. SECTION XIII. Standard Title VI Assurances. The COMPANY shall comply with all applicable Department and Federal laws, rules (including the administrative rules adopted by the Department for the IPPP Program — 761 Iowa Administrative Code, chapter 201), ordinances, regulations, and orders. The COMPANY, and all agents of the COMPANY that participate in the project, shall also comply with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d-42 U.S.C. 2000d-4, and all requirements imposed by or pursuant to Title 49, Code of Federal Regulation, Department of Transportation, Subtitle A, Office of the Secretary, Part 21 — to the end that no person in the United States shall, on the grounds of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity receiving financial assistance from the HIGHWAY AUTHORITY. SECTION XIV. Successor and Assigns. This Agreement shall be binding upon all successors or assigns. The COMPANY shall provide written notice to the HIGHWAY AUTHORITY of any assignment of this Agreement. SECTION XV. Project Contact Persons. All notices and communications essential to complete the work required by this Agreement shall be made to the Contact Persons specified on the cover page of this Agreement. SECTION XVI. Integration and Amendment. This Agreement and its exhibits constitute the entire Agreement between the COMPANY and the HIGHWAY AUTHORITY concerning this project. If the HIGHWAY AUTHORITY determines a substantial change is to be made in the project work described in Exhibit "A", the HIGHWAY AUTHORITY will furnish the written approval of the change. SECTION XVII. Termination Due to Lack of Funds. Notwithstanding anything in this Agreement to the contrary, and subject to the limitations set forth below, the HIGHWAY AUTHORITY shall have the right to terminate this Agreement without penalty and without any advance notice as a result of any of the following: 1) if funds are de -appropriated, reduced, not allocated, or receipt of funds is delayed, or if any funds or revenues needed by the HIGHWAY AUTHORITY to make any payment hereunder are insufficient or unavailable for any other reason as determined by the HIGHWAY AUTHORITY in its sole discretion; or 2) if the HIGHWAY AUTHORITY's authorization to conduct its business or engage in activities or operations related to the subject matter of this Agreement is withdrawn or materially altered or modified. The HIGHWAY AUTHORITY shall provide the COMPANY with written notice of termination pursuant to this section. The HIGHWAY AUTHORITY will pay the COMPANY for the HIGHWAY AUTHORITY's share of the non -cancelable obligations allowable under the Agreement and properly incurred by the COMPANY prior to termination. SECTION XVIII. Merged Documents. This Agreement may be executed and delivered in two (2) or more counterparts, each of which so executed and delivered shall be deemed to be an original, and all shall constitute but one and the same original. If any section, provision, or part of this Agreement shall be found to be invalid or unconstitutional, such judgment shall not affect the validity of any section, provision, or part thereof not found to be invalid or unconstitutional. IN WITNESS WHEREOF the COMPANY and the HIGHWAY AUTHORITY hereto have caused this Agreement to be executed by their duly authorized officers as of the dates indicated below. Executed by COMPANY this Chicago, Central & Pacific Railroad Company Z day of 0 c /6 , 2013 By Executed by HIGHWAY AUTHORITY this City of Waterloo, Iowa day of , 2013 By Name and Title •1 EXHIBIT "A" — WORK STATEMENT Iowa Grade Crossing Surface Repair Fund and Federal -Aid Rail/Highway Crossing Surface Repair County: Blackhawk FRA No: 307117K State Crossing Na: 12386 Location: Nevada Street Meeting Date: 09/24/2013 Highway Authority: Waterloo RR Company: CCP 1. Crossing(s) Reconstructed A. COMPANY will reconstruct 1 crossing(s) of 75 total feet that include 54 feet of Rubber surface material through the traveled roadway and 21 feet of Rubber surface material through the shoulder, sidewalk, and/or trail area. As a minimum, the crossing must extend beyond the edge of the traveled roadway and through the shoulder if not curbed. B. Existing rail weight through crossing(s) 115# 2. Traffic Controls (mark with an X) ❑ The highway will be closed for 33-55 days during repair. NOTE: The HIGHWAY AUTHORITY is responsible for placement and cost of barricades, signing, detours, detour damage, and runarounds. A. The COMPANY shall advise the HIGHWAY AUTHORITY Contact Person: 1) A minimum f sixty (60) days in advancc f thc appr xim: _ :.: - Y - ----- HIGHWAY :- FIIGHWAY AUTHORITY t implement thc dct ur. 2) Fourteen (14) days in advance of the actual starting date to allow the HIGHWAY AUTHORITY adequate time to provide and install appropriate signs on the detour. The COMPANY shall als advise thc STATE PROJECT INSPECTOR f urtccn (11) days in advancc f the actual starting date. 3. Track Elevation Relative to Existing Road Pavements (mark with an X) Tracks will be c nstructcd t mcct existing r ad grads. ❑ Tracks will be elevated 00=1 inches above the adjacent roadway requiring a taper (complete item 4A and 4B.) In any event, the parties agree to provide a smooth crossing. 4. Roadway Work — Must be sufficient to provide a smooth crossing A. Taper Length (estimated) A 5 foot taper on the North side of the crossing and a 5 foot taper on the South side of the crossing, requires 45 tons of HMA material (estimated). Taper length should not exceed 25 feet for each inch of track raise. Approach shall comply with HIGHWAY AUTHORITY specifications. This work will be completed by (mark with an X) 0 COMPANY forces 0 IIIGIIWAY AUTHORITY f rtes 0 COMPANY's contractor 0 HIGHWAY AUTHORITY's contractor FRA No. 307117K B. Track Opening in the Roadway (mark with an X) Existing track opening will be maintained. T aek-epen-ing-ef 29 fit will be fog:tired itwol*ing the followirtg described roadway modificati ns. Est. I1MA t nnagc This work will be completed by (mark with an X). ❑ COMPANY forces C IIIGIIWAY AUTHORITY f rccs ❑ COMPANY's c ntract r C IIIGIIWAY AUTIIORITY's c ntract r 5. Existing Sidewalk(s) and/or Recreational Trail replacement by HIGHWAY AUTHORITY. The quadrants requiring upgrades to meet ADA requirements (mark with an X). Sidewalk ( 5' width rcquircd) NE _5 _(feet) SE _5_(feet) NW (feet) SW (feet) *Rcc' Trail (10' width ) NE 16(feet) NE (feet) SE (feet) NW (feet) SW (feet) ❑ GomAtoPmefee IIIGIIWAY AUTIIORITY f rccs O COMPANY's contractor 0 HIGHWAY AUTHORITY's contractor= A. COMPANY will rctirc and rcm vc cr ssing(s). B. V ids in pavement will be filled with material requiring (units). This w rk will be c mplctcd by (mark with an X). R COMPANY f rccs IIIGIIWAY AUTIIORITY f rccs COMPANY's c ntract r J IIIGIIWAY AUTHORITY's c ntract r 7. Drainage (mark with an X) A. 0 Present drainage is adequate. B. 0 Drainage w rk rcquircd. Spccify w rk t include materials and utict. _❑ Clean all f ur ('1) quadrants f r g surface drainage. quadrant(s) nccd rcshapcd t all w pr p: = - - - : ' ; . _ - : -- . _ 8. Additional Construction and Traffic Control Conditions; i.e., Road Closure Limitations - Construction at this crossing included with this project, and not described above. Only ACC will be placed five (5) foot from the railroad surface material. 9. Signature Block Signatures indicate agreement on all items on Work Statement. If the Agreement is not reached at the field meeting, Highway Authority should hold the form, and set target resolution date. Railroad Representative Date Highway Authority Representative Date Estimate: Location: Company Name: Subdivision Name: Mile Post: State Network # Operations Special Capital Project Estimate RENEW NEVADA ST MAINLINE XING 307117K Southern Region (1 TRACK) Design & Construction Homewood, IL RENEW NEVADA ST MAINLINE XING 307117K (1 TRACK) WATERLOO CCP WATERLOO Date created: September 24, 2013 274.71 Date revised: IA Status: PRELIM x Description LABOR Unload/Distribute Material Construct Track Surfacing Welding Install Crossings S&C Labor Remove Crossings GANG SIZE 3 5 3 2 7 1 7 UM QTY PRICE TOTAL' Days MD 1 3 2 10 2 6 2 4 1 7 1 1 1 7 $253 $759 $253 $2,529 $267 $1,601 $258 $1,030 $253 $1,770 $312 $312 $253 $1,770 TOTAL DIRECT LABOR $9,771 Description UM QTY PRICE MATERIAL Rail New Field Welding Anchors Tie Plates Minor OTM Switch Ties Ballast Crossing Materials S&C Material 'TOTAL DIRECT MATERIAL TOTAL' $4,532 $578 $1,424 $5,391 $1,721 $4,410 $1,730 $14,659 $536 $34,981 I Description UM QTY PRICE OTHER Per Diem (Mandays) Rental Equipment Approach work/asphalt Contingency (TOTAL OTHER 'ADDITIVES SUM SUM SUM 38 $79.50 $5,304 $8,193 $79, 933 1 1 10% TOTAL' $3,021 $5,304 $8,193 $7,993 $24,5111 UM QTY PRICE Labor Surcharges (IaDOT approved 07-19-2012) Material Surcharges $9,771 $34,981 'TOTAL ADDITIVES 'DONATION Recoverable Donation to CN 173.10% 5.00% Amount (17,585.00) TOTAL' $16,914 $1,749 $18,663 TOTALI (17,585.00) 'TOTAL DONATION (17,685.00)1 TOTAL PROJECT COST $87927 1 of 3 • O Operations Special Capital Project Estimate RENEW NEVADA ST MAINLINE XING 307117K Southern Region (1 TRACK) Design & Construction Homewood, IL MATERIAL FORECAST FOR: Material Description "NEW 115# "THERMITE KIT 115 # RAIL ANCHOR 115 PLATE TIE MSR 7-1/2" X 15-1/2" 100-115# SS5 SCREW TIE HEAT TREATED E -CLIP GAVLANIZED 110-136# SWITCH TIE - 10' HW BALLAST ROAD (80T per car) RUBBER CROSSING MATERIAL (Per Quote) BLACKTOP SIGNAL MATERIALS (Per Signal Dept Estimate) RENEW NEVADA ST MAINLINE XING 307117K (1 TRACK) State Tax UM 5.00% LF ? 240 5.00% EA 1 6 5.00% EA 950 5.00% EA 142 5.00% EA 568 5.00% EA 284 5.00% EA 71 5.00% TON 190 5.00% TF 75 5.00% TON 45.0 5.00% SM 1 WATERLOO 275 QTY Unit Price 2 of 3 91.80 1.43 36.16 1.36 3.06 59.16 8.67 G55 Total $0532 $5781 $1,424' $5,391 $809 $912 $4,410" $1,730` 186.15 $14,659 173.40 $8,193 1,020.00 $536' r e Operations Special Capital Project Estimate RENEW NEVADA ST MAINLINE XING 307117K Southern Region (1 TRACK) Design & Construction Homewood, IL STATE COST SUMMARY Estimate: RENEW NEVADA ST MAINLINE XING 307117K (1 TRACK) Location: WATERLOO Company Name: CCP Subdivision Name: WATERLOO Mile Post: 274.71 September 24, 2013 LABOR $30,413 MATERIAL $40,403 EQUIPMENT $8,098 APPROACH WORK $9,012 OTHER IQ PROJECT TOTAL $87,927 3 of 3