HomeMy WebLinkAboutAecom Technical Services-10/21/2013CITY OF WATERLOO
Council Communication
City Council Meeting: October 28, 2013
Prepared: October 23, 2013
Dept. Head Signature: Eric Thorson
# of Attachments:
SUBJECT:
FY 2012 East Donald Street Improvements
Contract No. 797, STP -U-8155(714)-70-07
Supplemental Agreement No. 2 With AECOM Technical Services
Construction -Related Services
Submitted by: Leff Bales, Associate Engineer
Recommended City Council Action:
Approve Supplemental Agreement No. 2 for above -referenced project and authorize Mayor to sign
and enter into said agreement.
Summary Statement
During project construction, utility conflicts were discovered that required an extension of the
original construction contract timeframe, which required additional field time, construction
review and administration to complete construction -related services. The actual construction time
extended an additional 8 -weeks over the original estimated construction schedule, thus requiring
additional staff hours to complete CRS work. Staff has reviewed this cost plus fixed fee agreement
and recommends Council approval.
This agreement is available in the City Clerk's office if you wish to review it in its entirety.
Expenditure Required $21,500
Source of Funds
80% Federal Funds or $17,200 and 20% Local Funds (Local Option Sales Tax) or $4,300
Policy Issue N/A
Alternative N/A
Background Information:
A=COM
AECOM 319-232-6531 tel
501 Sycamore Street 319-232-0271 fax
Suite 222
Waterloo, Iowa 50703
www.aecom.com
DONALD STREET IMPROVEMENTS
U.S. HIGHWAY 63 TO MILDRED STREET
WATERLOO, IOWA
SUPPLEMENTAL AGREEMENT NO. 2
WHEREAS, a Professional Services Agreement was entered into by the City of Waterloo, Iowa
(City), and AECOM Technical Services, Inc. (Consultant), of Waterloo, Iowa, dated October 6,
2010, for the preliminary design, final design and construction review for improvements on Donald
Street from U.S. Highway 63 to Mildred Street in Waterloo, Iowa; and
WHEREAS, the City and Consultant entered into Supplemental Agreement No. 1 dated May 23,
2012, for the construction -related services for the Donald Street Improvements; and
WHEREAS, the City and Consultant desire to amend the previous agreement to include additional
engineering services during the construction phase of the Donald Street Improvements.
NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement
as follows:
L SCOPE OF SERVICES
Services to be provided under this supplemental agreement include the additional field
review, reporting and contract administration for the construction of the Donald Street
Improvements from U.S. Highway 63 to Mildred Street necessary due to the additional
construction time which is required for the project.
During project construction, utility conflicts were discovered, including Century Link and
Mid -American Gas that required an extension of the original construction contract
timeframe, which will require additional field time and project administration to complete the
construction -related services through the extended timeframe. Additional intersection
coordination was also required for the staging at the U.S. Highway 63 intersection due to
the U.S. Highway 63 concurrent construction. Due to the extended construction timeframe
required, field review time will extend an additional 8 weeks over the original estimated
construction schedule. Therefore, the following tasks from the original agreement will
require additional staff hours to complete:
Task 5. Progress and Quality of Construction. Maintain direct contact with the City's
representative or his authorized representative to the extent necessary to inform the City's
representative of the progress and quality of construction work performed. Provide the
necessary qualified staff at the job site to act under the authority of the City's
representative, and observe and review the work in progress and determine whether the
work is in general conformity with the contract plans and specifications. It is understood
that responsibility for the correctness of every detail of construction is beyond the scope of
this agreement. The Consultant shall not assume management or direction of the
contractor's operations or any utility company's operations.
AXOM
Page 2
Nothing in this agreement shall be construed as giving the Consultant the responsibility or
authority to direct or supervise construction methods, means, techniques, procedures or
safety methods used by the contractor, subcontractors, or utility companies performing the
actual construction work. Neither observations by the Consultant nor inspections, tests or
approvals, shall relieve the contractor, subcontractors or utility companies from their
obligation to perform the work in accordance with the requirements of the contract
documents
The contractor has ultimate responsibility to monitor all his work to ensure proper quality,
safety and completion within the contract time, as do the utility companies involved in this
project.
Task 7. Reports. Prepare and submit daily, weekly and monthly reports as required by
Iowa DOT's Materials Department Instruction Memorandums and Iowa DOT's Construction
Manual. Also includes preparation and submittal of change and extra work orders,
subcontract requests and other forms as are normally utilized by the Iowa DOT on
construction projects. Reports are to be submitted per Iowa DOT Standards for reporting,
and copies of reports are to be submitted to the City.
Task 8. Estimates. Make monthly or bi-monthly reports to the City's representative, or his
authorized representative, of the estimated amount of materials furnished and delivered
and the work performed. Review and approve estimates for progress and final payment.
Task 9. Pay Quantities. Measure and document construction pay quantities and perform
functions necessary to assist with funding reimbursement for the project.
Task 14. Proiect Administration. Attend periodic construction meetings and conduct
intraoffice administration and coordination of the project.
II. COMPENSATION
The Consultant shall be reimbursed for the actual costs incurred in accordance with
Article 3 of the original agreement.
The estimated actual costs, fixed fee, contingency and maximum amount payable for this
supplemental agreement, as stated below and as shown in Attachment A, are to be
integrated with Supplemental Agreement No. 1.
S.A. No. 1 S.A. No. 2 Total
Estimated Actual Costs $171,160.00 $19,100.00 $190,260.00
Fixed Fee 20,980.00 2,400.00 23,380.00
Contingency 0.00 0.00 0.00
Maximum Amount Payable $192,140.00 $21,500.00 $213,640.00
III. In all other respects, the obligations of the City and Consultant shall remain as specified in
the Professional Services Agreement dated October 6, 2010.
A=COM
Page 3
IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 2 as
of the dates shown below:
AECOM TECHNICAL SERVICES, INC.
By / _pC/! N % ' :r Date October 23, 2013
Douglas W. Sch' ' • - , P.E.
Associate Vice President
CITY OF WATERLOO, IOWA
By Date
Ernest G. Clark, Mayor
IOWA DEPARTMENT OF TRANSPORTATION
ACCEPTED FOR AUTHORIZATION
By Date
Robert Welper, P.E.
Local Systems Engineer
District 2
L:\work\ADMI N\AGREE\SUPPLE\SA2WatDonaldStrl m prUs63toMi Idred.docx
Attachment A
Donald Street Improvements
U.S. Highway 63 to Mildred Street
Waterloo, Iowa
Additional Construction Related Services
Cost Analysis
I. Direct Labor Cost (AECOM Technical Services)
Category Hours Rate/Hour Amount
Senior Professional 0 $85.30 $0.00
Project Professional 52 $61.00 $3,172.00
Staff Professional 4 $41.00 $164.00
Professional 0 $30.30 $0.00
CADD Operator 11 0 $30.60 $0.00
CADD Operator I 0 $21.75 $0.00
Senior Technician 104 $33.00 $3,432.00
Technician 0 $26.25 $0.00
Project Support 22 $27.75 $610.50 $7,378.50
182
II. Payroll Burden and Overhead Provisional Costs 153.40% $11,318.62
III. Direct Project Expenses
Category Units Rate/Unit Amount
Mileage 500 0.565 282.50
Per Diem 0 40.00 0.00
Lodging 0 80.00 0.00
B/W Copies 200 0.06 12.00
Color Copies 50 0.12 6.00
EDM Equipment 0 12.50 0.00
GPS Equipment 0 25.00 0.00
Miscellaneous, Other 100.00 $400.50
IV. AECOM Estimated Actual Costs $19,097.62
Rounded $19,100.00
V. Subcontract Expense
$0.00
VI. Estimated Actual Costs
VII. Fixed Fee
VIII. Contingency
$19,100.00
$2,400.00
$0.00
IX. Maximum Amount Payable $21,500.00
Attachment A
Donald Street Improvements
U.S. Highway 63 to Mildred Street
Waterloo, Iowa
Additional Construction Related Services
Staff Hour Estimate
Description of Work
Senior
Prof.
Project
Prof.
Staff
Prof.
CADD
Op. II
Senior
Tech
Tech
Project
Support Total
5 Progress & Quality of Construction
20
4
80
10
114
7 Reports
4
8
4
16
8 Estimates
4
8
12
9 Pay Quantities
4
8
12
14 Project Administration
20
8
28
TOTAL HOURS
0
52
4
0
104
0
22
182