Loading...
HomeMy WebLinkAboutBenton's Sand and Gravel-10/21/2013CITY OF WATERLOO Council Communication City Council Meeting: October 21, 2013 Prepared: October 14, 2013 Dept. Head Signature: Eric Thorson, PE., City Engineer # of Attachments: SUBJECT: CHANGE ORDER NO. 1 - $3,542.77 DECREASE FY 2012 GERALDINE ROAD EXTENSION RM -8155(727)-9D-07 BENTON'S SAND AND GRAVEL, INC. CONTRACT 821 Submitted by: Jeff Bales, Associate Engineer Recommended City Council Action: Staff has reviewed this Change Order and recommends that the Mayor be authorized to sign it on behalf of the City. Please execute all three (3) copies and return two (2) to our office for further processing. Summary Statement Transmitted herewith is a Change Order in the decreased amount of $3,542.77. This is the accumulated amount of adjustments from original to final quantities that were determined necessary during the construction of the project, which results in a decrease to the total project cost. Expenditure Required N/A Source of Funds N/A Policy Issue N/A Alternative N/A Background Information: Cc: Pauline Closson, Engineering Department CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 1 PROJECT: F.Y. 2012 GERALDINE ROAD EXTENSION CONTRACT NO. 821 Date Prepared: October 11, 2013 AMOUNT: ($ 3,542.77) CR TO: Benton's Sand and Gravel, Inc. Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated August 13, 2012. A. Description of change to be made or extra work to be done: Item 4 — TOPSOIL, FURNISH AND SPREAD — Decrease Quantity by 500 CY Item 6 — COMPACTION WITH MOISTURE AND DENSITY CONTROL — Decrease Quantity by 1,683 CY Item 7 — SPECIAL COMPACTION OF SUBGRADE — Decrease Quantity by 9.18 STA Item 11— STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 2 DURABILITY, 7 -INCH — Increase Quantity by 41.33 SY Item 26 —TEMPORARY SEEDING — Increase Quantity by 0.75 AC Item 27 — MULCHING — Increase quantity by 1.79 AC Item 28 — SEEDING AND FERTILIZING (URBAN) — Increase quantity by 1.79 AC Item 29 — SILT FENCE — Decrease quantity by 865 LF Item 31— MOBILIZATIONS, EROSION CONTROL— Decrease quantity by 3 EA Item Summary: ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL AMOUNT 4 TOPSOIL, FURNISH AND SPREAD CY 500 $4.00 ($2,000.00) 6 COMPACTION WITH MOISTURE AND DENSITY CONTROL CY 1,683 $3.90 ($6,563.70) 7 SPECIAL COMPACTION OF SUBGRADE STA 9.18 $180.00 ($1,652.40) 11 STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 2 DURABILITY, 7 -INCH SY 41.33 $26.00 $1,074.58 26 TEMPORARY SEEDING AC 0.75 $685.00 $513.75 27 MULCHING AC 1.79 $700.00 $1,253.00 28 SEEDING AND FERTILIZING (URBAN) AC 1.79 $3,125.00 $5,593.75 29 SILT FENCE LF 865 $1.95 ($1,686.75) 31 MOBILIZATIONS, EROSION CONTROL EA 3 $25.00 ($75.00) ($3,542.77) CR NET INCREASE ($3,542.77) CR B. Reason for ordering change or extra work: Adjust quantities for all items listed above to the final as -built quantities. C. Settlement for cost of work to be made as follows: Compensation already made to contractor through original bid unit prices. Project Summary: Original Contract Amount $272,178.80 Change Order #1 ($3,542.77) CR Final Contract Amount $268,636.03 CITY OF WATERLOO BY: Mayor ATTEST. City Clerk /723//j3 Date Benton's Sand & Gravel, Inc. CONTRACTOR BY: � �1 / u WA/Z‘ /I?i/ -LF Date PRINTED NAME: 4 /' k/e/ 0v42' C L_ I TITLE: C%y1 - Date APPROVED: ,,g/d/C City Engineer /0//6/r.3 Date