Loading...
HomeMy WebLinkAboutAecom Technical Services-11/12/2013Mayor BUCK CLARK COUNCIL MEMBERS DAVID JONES Ward 1 CAROLYN COLE Ward 2 HAROLD GETTY Ward 3 QUENTIN HART Ward 4 RON WELPER Ward 5 BOB GREENWOOD At -Large STEVE SCHMITT At -Large CITY OF WATERLOO, IOWA WASTE MANAGEMENT SERVICES 3505 EASTON AVE. WATERLOO, IA 50702 (319) 291-4553 FAX (319) 291-4523 LARRY N. SMITH SUPERINTENDENT Council Communication City Council Meeting: 11/12/2013 Prepared: 11/6/2013 Dept. Head Signature: # of Attachments: 2 7 r 1 SUBJECT: Supplemental Agreement No. 1- La Porte Road Pump Station and Force Main City Contract No. 847 Submitted by: Larry N. Smith, WMS Superintendent Recommended City Council Action: Approval of supplemental Agreement No. 1 for construction related services for the La Porte Road Pump Station and Force Main project and amend the original Professional Service Agreement dated October 15, 2012. Summary Statement: A Professional Service Agreement was entered into by the City of Waterloo and AECOM Technical Services Inc. dated October 15, 2012 for design and bidding services for a new (replacement) pumping station and new force main to serve the existing Southview Estates and Cedar Hills developments and future development along La Porte Road in South Waterloo. Expenditure Required: Estimated $65,500.00 Source of Funds: Policy Issue: Alternative: Background Information: WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer A=COM October 30, 2013 Mr. Larry Smith Water Pollution Control Superintendent 3505 Easton Avenue Waterloo, Iowa 50702 Subject: La Porte Road Pump Station and Force Main City Contract No. 847 Construction -Related Services Agreement AECOM #60279867 Dear Larry, AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com Enclosed please find two (2) signed Agreements for the construction -related services for the La Porte Road Pump Station and Force Main project which is scheduled to bid on November 4, 2013. Upon Council approval, please return one fully executed copy of the Agreement to our office. If you have any questions or need anything further in this matter, please let us know. Yours sincerely, Robert E. Bamsey, P.E. Enclosures: As Noted c: Ms. Suzy Schares (w/enclosure) L:\work\project\602798671200_Correspondence\10-30-13 IsLaPorte Rd Pump Sta CRS Agrmnts.docx A=COM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CITY OF WATERLOO LAPORTE ROAD PUMPING STATION AND FORCE MAIN CONSTRUCTION -RELATED SERVICES SUPPLEMENTAL AGREEMENT NO. 1 WHEREAS, a Professional Service Agreement was entered into by the City of Waterloo (Client), 715 Mulberry Street, Waterloo, Iowa, and AECOM Technical Services, Inc. (ATS), 501 Sycamore Street, Suite 222, Waterloo, Iowa, dated October 15, 2012, for design and bidding services for a new (replacement) pumping station and new force main to serve the existing Southview Estates and Cedar Hills developments and future development along LaPorte Road in south Waterloo; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 1 for construction -related services for the project. NOW THEREFORE, it is mutually agreed to amend the original Professional Service Agreement as follows: I. PROJECT DESCRIPTION The project includes the construction of a new lift station, approximately 1,880 L.F. of gravity main, approximately 2,960 L.F. of force main, one (1) air release manhole, seven (7) sanitary sewer manholes and incidentals located along LaPorte Road. Work also includes removal of the existing lift station, installation of a manhole once the new station is operational, and grading and surface restoration. II. SCOPE OF SERVICES The Scope of Services is for construction -related services and includes the following: 1. Assign a project manager who will coordinate project activities and will be the principal liaison between the Client, Consultant and regulatory agencies. 2. Assist the Client in assembling the contract documents for execution by the Contractor and the Client. 3. Conduct a preconstruction conference with representatives of the Contractor, Client, Consultant and affected utilities. 4. Provide horizontal and vertical control for the project including: A. Grade Stakes — Alignment and grade for sanitary sewer and manholes. B. Construction Limits - Identify where needed. Property staking or surveys are not included within the scope of this item. 5. Review shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the Project and compliance with the information given in the contract documents. 6. Answer design interpretation questions from the Client, Contractor, review staff and appropriate agencies. A=COM Page 2 7. Process monthly applications for payment submitted by the Contractor and forward to the Client for execution with recommendations for approval and payment. 8. Witness/provide, where applicable, field testing of the facilities furnished under the contract to assist in determining conformance with the contract documents. 9. Visit the construction site by design personnel at appropriate stages of construction to review the quality of the work and to determine, in general, whether the work conforms with the contract documents. 10. Assist the Client and Contractor in preparing and processing contract change orders. 11. Provide periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Staffing requirements may be adjusted during the project in relation to the level of construction activity. 12. Report to the Client any work believed to be unsatisfactory, faulty or defective or does not conform to the contract documents, and advise the Client of any work that should be corrected or rejected. 13. Consider and evaluate Contractor's suggestions for modifications and report them with recommendations to the Client. 14. Maintain files for correspondence, reports of the job conferences, shop drawings and sample submissions, reproductions of original contract documents including addenda, change orders, field modifications, additional drawings issued subsequent to the execution of the contract, Engineer clarifications and interpretations of the contract documents, progress reports and other project -related documents. 15. Keep a diary, log book or report for those times on site, recording hours on the job site; weather conditions; data relative to questions of extras or deductions; list of visiting officials and representatives of manufacturers, fabricators, suppliers and distributors; activities; decisions, observations in general and specific observations in more detail when necessary, as in the case of observing test procedures. 16. Conduct a review of the project near completion and prepare a list of items to be completed or corrected. 17. Perform a field observation of the completed project before a final application for payment is processed for the Contractor. 18. Provide the Client with a copy of revised drawings of the construction plans for the project based on the construction observation records of the review staff and Contractor showing those changes made during construction considered significant. 19. Assist the Client with the final close-out documentation from the Contractor. A=COM III. COMPENSATION Page 3 Compensation for the Services shall be on an hourly basis in accordance with the hourly fees and other direct expenses in effect at the time the services are performed. Total compensation is an estimated fee of Sixty -Five Thousand Five Hundred Dollars ($65,500.00) and shall be segregated from the fees estimated for Part VI of the original agreement. IV. In all other aspects, the obligations of the Client and ATS shall remain as specified in the Professional Services Agreement dated October 15, 2012. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below: AECOM TECHNICAL SERVICES INC. By Date October 28, 2013 ouglas`W. S hi el, P.E. Associate Vice President CITY OF 1NATERLOO Ze/al L:\work\ADMINWGREE\SUPPLE\SA1 LaPorteRd Pump CRS.doc Date DJerr\ber , .7OI3 A=COM October 30, 2013 Mr. Larry Smith Water Pollution Control Superintendent 3505 Easton Avenue Waterloo, Iowa 50702 Subject: La Porte Road Pump Station and Force Main City Contract No. 847 Construction -Related Services Agreement AECOM #60279867 AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com Dear Larry, Enclosed please find two (2) signed Agreements for the construction -related services for the La Porte Road Pump Station and Force Main project which is scheduled to bid on November 4, 2013. Upon Council approval, please return one fully executed copy of the Agreement to our office. If you have any questions or need anything further in this matter, please let us know. Yours sincerely, Robert E. Bamsey, P.E. Enclosures: As Noted c: Ms. Suzy Schares (w/enclosure) L•\work\project\602798671200_Correspondence\10-30-13 IsLaPorte Rd Pump Sta CRS Agrmnts.docx S4- 1 7 pf3