Loading...
HomeMy WebLinkAboutAecom Technical Services-11/25/2013mayor BUCK CL ARK COUNCIL MEMBERS eeeswooeumroseeva coo DAVID) J0NT S Ward I CAROLYN COT:E Ward HAROLD c;I rIY ('s'rrcd 3 QUEN JTN I-LAR1' J+?wcl 4 RON WVF. J PER Wand I30I3 GREENWOOD Ar -Lar v STEVE SC! MITT At -Large CITE OF WATERLOO IOWA WASTE MANAGEMENT SERVICES 3505 EASTON AVE. WATERLOO, iA 50702 {.319) 291-4553 FAX (319) 291-45523 PARR`,' P. SG'Sm T H S°:1PERNTENDENT Council Communication City Council Meeting: 11/25/2013 Prepared: 11/20/2013 2� J� Dept. Head Signature # of Attachments: SUBJECT: Supplemental Agreement No.1 WPCF Belt Press Addition City Contract 697 Submitted by: Larry N. Smith Recommended City Council Action: Approval of Supplemental Agreement No. 1 for the addition of electrical upgrades, heating, ventilating and air conditioning improvements to the Belt Filter Press Building and amend the original Professional Service Agreement dated April 24, 2013, Summary Statement: A Professional Service Agreement was entered into by the City of Waterloo and AECOM Technical Services Inc. dated April 24, 2013 for design and bidding services for the addition of a belt press and related equipment and now wishes to enter into Supplemental Agreement No. 1 for additional engineering services. Expenditure Required: $55,000.00 Source of Funds: Sewer Bonds Policy Issue: Alternative: Background Information: WE'RE WORKING FOR YOU! An Equat Opportunity/Affirmative Action Employer A®COM November 20, 2013 Mr. Larry Smith Water Pollution Control Facilities 3505 Easton Avenue Waterloo, Iowa 50703 Subject: Additional Design Services for the Belt Press Addition at the Waterloo WPCF AECOM #60300979 Dear Larry, AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com Enclosed please find two (2) originals of Supplemental Agreement No. 1 to the above -referenced project. This Supplemental Agreement adds the electrical upgrade and heating, ventilating and air conditioning improvements to the Belt Filter Press Building that we have discussed with you and your staff. Please return one (1) signed copy (original signature) to our office upon approval. If you have any questions or need anything further in this matter, please let us know. Yours sincerely, Robert E. Bamsey, Enclosures: As Noted c: Ms.. Suzy Schares (w/enclosure) P:\60300979\300-Communications\11-20-13 Is SA1-BeltFlter Press.docx A COM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CITY OF WATERLOO WATERLOO EASTON WPCF BELT PRESS ADDITION SUPPLEMENTAL AGREEMENT NO. 1 WHEREAS, a Professional Service Agreement was entered into by the City of Waterloo (Client), 715 Mulberry Street, Waterloo, Iowa, and AECOM Technical Services, Inc. (ATS), 501 Sycamore Street, Suite 222, Waterloo, Iowa, dated April 24, 2013, for design and bidding services for the addition of a belt press and related equipment at the Easton Water Pollution Control Facility (WPCF); and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 1 to include additional engineering services. NOW THEREFORE, it is mutually agreed to amend the original Professional Service Agreement as follows: I. PROJECT DESCRIPTION This supplemental agreement will include engineering services associated with heating, ventilating and air conditioning (HVAC), and electrical improvements at the sludge filter (dewatering) building (Structure 330) at the WPCF. 11. SCOPE OF SERVICES The Scope of Services for the additional engineering services will include the following: Heating and Ventilation Upgrade for Belt Filter Press Room in Dewatering Building No. 330: a. Proposed ventilation design improvements will be based on NFPA 820 for dewatering buildings containing gravity belt thickeners and areas containing the storage of dewatered sludge. b. The NEC Area Electrical Classification will remain "Unclassified." c. Design improvements will provide continuous ventilation rate of 6 Air Changes per Hour (ACH) as required in accordance with NFPA 820 Chapter 9 for both the Belt Press Room and Truck Loading Station. Chapter 9.3.3 allows recirculation up to 75 percent of the exhaust air -flow for unclassifted areas, provided that the following criteria are met: 1) The recirculated air and outside airflow rate total is not less than 6 ACH. 2) Recirculation does not occur during occupancy. 3) Recirculation does not occur whenever a combustible gas detector senses a lower explosive limit of 10 percent or greater. d. Air -flow Requirements: 1) - Belt Press Room will be designed with ventilation rate of 9,100 CFM outside air. AZ.COM ) Page 2 Truck Loading Station will be designed with ventilation rate of 1,900 CFM outside air. e. HVAC Design Improvements will consist of: 1) Demolition plan for removing existing make-up air unit, supply ductwork, outside air louver and gas-fired heaters. 2) Plans and specifications for new 11,000 CFM direct -fired make-up air unit to serve both the Belt Press Room and Truck Loading Station mounted outside at grade (possibly two separate units). 3) Plans and specifications for new supply and retum air ductwork distribution layout and supply air grilles. 4) Evaluation of existing exhaust fan capacities and rebalance of air flows, if necessary. 5) Plans and specifications for roof exhaust fan and exhaust hood over new 3rd belt press. 6) Plans and specifications for roof exhaust fan over Truck Loading Station. 7) Plans and specifications for exhaust ductwork layout. 8) Plans and specifications for lesser capacity gas-fired unit heater for supplemental heat. 9) Specifications for HV controls, including ventilation recirculation during unoccupied hours Secondary Electrical Service Upgrade - Belt Filter Press Room Dewatering Building 330 a. Revise two incoming underground services (main/tie/main) from a 480V, 3-phase, 3 - wire distribution system to a 277/480V, 3-phase, 4 -wire solidly grounded distribution system. b. Revise main service disconnects and MCC power distribution equipment inside building. 1) Electrical Engineer to coordinate design and scope of supply with utility. 2) Electrical Engineer to conduct site visit to meet with Client staff and collect data. Client to provide electrical staff to meet with ATS engineer for one day during investigation. 3} Electrical Engineer to design plan revisions to power distribution system inside and outside building. 4) Prepare specifications for bid documents. III. COMPENSATION Compensation for the Services shall be on an hourly basis in accordance with the hourly fees and other direct expenses in effect at the time the services are performed. Total compensation is an estimated fee of Fifty -Five Thousand Five Hundred Dollars ($55,500.00) and shall be integrated with the fees estimated for Part VI of the original agreement. IV. In all other aspects, the obligations of the Client and ATS shall remain as specified in the Professional Services Agreement dated April 24, 2013. Page 3 IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below. AECOM TECHNICAL SERVICES INC. By I !/,,►/ Douglas W. S hin. I, P.E. Associate Vice Frresident CITY OF WATERLOO By 1 e"7,, Date November 19, 2013 Date L:\workWDMIMAGREE\SUPPLE\SA1 Wat Easton WPCF Belt Press.doc ///,/, G //3