HomeMy WebLinkAboutJ & K Contracting-12/9/2013 (2)Mayor
BUCK
CLARK
COUNCIL
MEMBERS
.n....
DAVID
JONES
Ward I
CAROLYN
COLE
Ward 2
HAROLD
GETTY
Ward 3
QUENTIN
HART
Ward 4
RON
WELPER
Ward 5
BOB
GREENWOOD
At -Large
STEVE
SCHMITT
At -Large
CITY OF WATERLOO, IOWA
WASTE MANAGEMENT SERVICES
3505 EASTON AVE. WATERLOO, IA 50702 (319) 291-4553 FAX (319) 291-4523
LARRY N. SMITH SUPERINTENDENT
Council Communication
City Council Meeting: 12/9/2! 13
Prepared: 12/4/2013
Dept. Head Signature:
# of Attachments: 1
1
SUBJECT: No Name Creek Interceptor Sewer City Contract No. 849
Submitted by: Larry N. Smith, WMS Superintendent
Recommended City Council Action: Resolution approving award of bid and contract
based on discussion and qualification to J & K Contracting LLC of Ames, Iowa in the
amount of $869,679.00 for No Name Creek Interceptor Sewer, City Contract No. 849.
Summary Statement: J&K Contracting completed the Statement of Bidder's
Qualification Form, which is attached. It appears that they are capable of completing the
work and have had significant experience in constructing sanitary sewer work in Iowa.
Expenditure Required: $869,679.00
Source of Funds: Sewer Bonds
Policy Issue:
Alternative:
Background Information:
WE'RE WORKING FOR YOU!
An Equal Opportunity/Affirmative Action Employer
A=COM
December 3, 2013
Mr. Larry Smith
Water Pollution Control Facilities
3505 Easton Avenue
Waterloo, Iowa 50702
Subject: No Name Creek Interceptor Sewer
City Contract No. 849
AECOM #60283855
Dear Larry,
AECOM 319-232-6531 tel
501 Sycamore Street 319-232-0271 fax
Suite 222
Waterloo, Iowa 50703
www.aecom.com
As you know, bids for the above -referenced project were received and opened on November 12, 2013. A copy
of the Bid Tabulation is attached.
The low bidder was J & K Contracting LLC of Ames, Iowa.
To follow-up the bidding, we requested that J & K Contracting complete the Statement of Bidder's Qualifications
Form from the specifications, which we have also attached. It appears that they are capable of completing the
work and have had significant experience in constructing sanitary sewer work in Iowa.
In addition to the above, we had discussions with several other Contractors who had looked at the project. We
wanted to see if we could determine why there was such a range in the bids. Some of the Contractors were
concerned with the directional drilling portions of the work, some were concerned with the dewatering, and there
were some concerns about encountering rock. We discussed the project with Mr. Matt Runge of J & K
Contracting and believe they will be able to complete the work in accordance with the Plans & Specifications. If
we encounter unforeseen conditions, we will deal with them in accordance with the Contract Documents; and
they are in agreement with that approach.
Based on our discussions and the qualifications of J & K Contracting, we recommend that the No Name Creek
Interceptor Sewer be awarded to J & K Contracting LLC of Ames, Iowa, in the amount of $869,679.00.
We recommend this action be taken by the Council at their meeting on December 9, 2013.
If you have any questions or need additional information in this matter, please let us know.
Yours sincerely,
Robert E. Bamsey, P
Attachments: As Noted
c: Mr. Eric Thorson (w/enclosures)
Ms. Suzy Schares (w/enclosures)
Ms. Michelle Weidner (w/enclosures)
Mr. Doug Schindel (w/enclosures)
P:\60283855\200_Correspondence\12-3-13 IsNo Name Creek Recommendation Ltr.docx
Bid Tabulation
No Name Creek Interceptor Sewer
City of Waterloo, Iowa
City Contract No. 849
AECOM Project No. 60283855
Opening : 4:00 p.m.
November 12, 2013
L:\work\project\60283855\400 Technical\421_Quant&Cost-Est\Waterloo - No Name Creek Sewer - Bib Tab.xlsx
Bidder
Amount
Engineers
Estimate
$ 750,000.00
1
J & K
Contracting. LLC
$ 869, 679.00
2
Ricklefs
Excavating, Ltd.
$ 1,375,776.50
3
Peterson
Contractors Inc.
$ 1,378,335.00
4
Minger
Construction, Inc.
$ 1,480,920.90
5
Holland
Contracting
$ 2,704,675.00
6
Tschiggfrie
Excavating
$ 2,870,022.85
7
$ -
8
$ -
9
$ -
10
$ -
11
$ -
L:\work\project\60283855\400 Technical\421_Quant&Cost-Est\Waterloo - No Name Creek Sewer - Bib Tab.xlsx
r
r
1.
c
I'
STATEMENT OF BIDDER'S OUALIFICA ONS
(To be submitted by the Bidder only upon the specific request of the City of Waterloo, Iowa.)
All questions must be answered and the date given must be cleat: and comprehensive. This statement must be
notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any
additional information he desires.
1. Name of bidder. J&K CONTRACTING, LLC.
2. Permanent mein office address.
1 When organized. 11-24-06
4. ifa corporation, when i . 11-24-06
1307 EAST LINCOLN WAY
AMES, IOWA 50010
5. How many years have you been engaged in the contraeting business under your present firm or trade
name? 7 YEARS
6. Contracts on hand: (Schedule these, showing ataoimt of each Contract and the appropriate anticipated
datea of completion.) SEE ATTACHED
7. General ammeter ofwork p edbyyouroompw* SEWER & WATER CONSTRUCTION
8. Have you ever hailed to complete any work awarded to you? If eo, where and why? NO
9. Have you ever dehutted on a contract? If so, where and why? NO
10. List the more important projects recently completed by your company, stating the approximate cost for
each, and month and year completed. SEE ATTACHED
11. List your major equipment avaihabie for this contract SEE ATTACHED
12. Experience in Construction work similar In importance to this project. SEE ATTACHED
13. Background and experience of the principal members of your organization, inahrding the offiicer&
14. Credit available: $ 400,000.00 SEE ATTACHED
15. Give bank reference_ SEE ATTACHED
16. Will you, upon request, frli out a detailed financial statement and furnish any other information that may
be required by the City of Watedoo, 'owe? IF REQUIRED
STATEMENT OP BIDDERS QUAURCATONS CONTRACT NO- 249 SQ -1 of 2
69223855
LP L'b5
•
;MEM
611 ON IZVIU.NO3 Smouoramvnt, SMSCIREI 40J10IAG1VJS
•• *a•NOLL3aSJOQN7•*�
r
7023200 pt@ sew
--1 4i
Att.. ax atl
saes pue s>aada-
;o Ksp
30NnU WASH.LLIMI
Alwariary-- Jo imp
wit eau augeg oa moms pap smegazeupts
p® Poe suocaw tb 2alockuoj a a4 =mom sevetp pun
(uallazParOP am'N)
Jo
Tnp2uwqL"•�'j 'i'1
/9/04.0 J0 Aunt0
MI L
—411(Hdo
9 D7 t.r
"mgnEWE ` 3?�jw perm
•suopwg►runb s1rapprg jo auame7elS
sign gaistcdarm ape;roatz atp 3o aoelagtrrae m ludo' `001 M. 3aAimat8 ft parAmIsu oouetaro}tu
AuR gsnrrn,} of trogesodmo so scusg 'aos>,d etre numb= pun nefrupas Awn pefliszapmi au,
'LI
Job #
J&K Current Work On Hand
(Updated 11/1
Contract Value
5/13)
Value Remaining
Approx. Completion Date
Job Name
1103CF
Cedar Falls Wastewater Treatment Plant Modifications
$ 1,526,955.00
$ 81,500.00
12/31/2013
1205PB
Parkersburg CDBG Storm Sewer Improvements
$ 1,242,000.00
$ 35,000.00
12/1/2013
1208AM
Ames Mary Greeley Medical Center Addition & Renovation
$ 675,000.00
$ 633,000.00
11/15/2014
12135C
State Center CDBG Sanitary Sewer Rehabilitation
$ 495,000.00
$ 45,000.00
6/15/2014
12251N
Indianola Wastewater Collection System Rehabilitation Phase 4
$ 960,000.00
$ 55,000.00
12/31/2013
1229SL
Storm Lake Sanitary Sewer Improvements
$ 1,381,625.00
$ 65,000.00
12/31/2013
1313GR
Grimes Jordan Well
79,945.00
$ 56,000.00
6/1/2014
1322NB
Iowa DOT Northbound 1-35 Rest Area (Elkhart Location)
_$
$ 2,259,000.00
$ 2,111,000.00
10/1/2014
1323SB
Iowa DOT Southbound 1-35 Rest Area (Elkhart Location)
$ 675,000.00
$ 294,000.00
10/1/2014
1326NV
Nevada Sanitary Sewer Rehabilitation
$ 85,000.00
$ 15,000.00
12/1/2013
1328WK
Waukee SE LA Grant Parkway
$ 892,890.00
$ 495,000.00
10/1/2014
13290M
DSM Waterworks Wilchinski Standpipe Control Valve
$ 144,420.00
$ 36,000.00
12/15/2013
1332AL
Altoona Ambrose Water Improvements
$ 275,000.00
$ 10,000.00
12/1/2013
1333CL
Clive North Walnut Creek Sewer
$ 331,445.00
$ 45,000.00
12/31/2013
1335AL
Altoona Ambrose Pump Station
$ 1,245,000.00
$ 937,000.00
5/30/2014
1338NV
Nevada 2013 Street Improvements
$ 1,992,692.00
$ 1,992,692.00
9/30/2014
Job Summary:
Des Moines Rlverpoint West Street Improvements: Completed in 2010 as subcontractor to Sternquist Construction (contact
information on reference sheet). Our project scope totaled approximately $1.5 million. The design engineering firm was Snyder &
Associates. Matt Becker (contact information on reference sheet) was the managing engineer for the City of Des Moines. This work
consisted of up to 32 foot deep 8" and 12"sanitary trunk line Installation along with tie-ins and service work. This work also included
major site dewatering systems. Water main and storm piping for new Improvements were included as well.
Alden Wastewater Collection & Rehab: This project was completed fall of 2011 and our scope totaled $1.1 million. The project
engineer was Tim Moreau with V&K Engineers and the general contractor was Visu-Sewer. The project consisted of both deep and
shallow sanitary point repairs including by-pass pumping and street restoration. This work was coordinated with Visu-Sewer's
sanitary sewer relining.
Des Moines Court Avenue Pump Station: This project was completed November of 2012 and the project scale totaled
approximately $550,000.00. The project engineer was Veenstra & Kimm and the general contractor was Larson & Larson
Construction. The project consisted of a pump station construction with associated piping, auger bores and surface restoration. This
project was in downtown Des Moines in a highly trafficked and public area.
Woodbury County IDOT Sioux City 1-29 Interstate Widening: This project was completed in 2011 and our project portion was
approximately $1.5 million. The project design was completed by the Iowa DOT. J&K worked under subcontract to Knife River
Construction (paving contractor). Our work consisted of removal and replacement of storm sewer ranging from 15" to 48" in size.
Work also includes multiple auger borings & storm sewer jacking, as well as construction of over 100 intakes. Job consists of very
tight working area with intricate traffic staging along this busy stretch of 1-29 Interstate.
Clive DOT University Boulevard Improvements: This project was completed in fall of 2011 and the project scale totaled
approximately $1 million. The project engineer is Jim Hagelie with the City of Clive and the general contractor is Sternquist
Construction (contact attached). This project consisted of large diameter 84° storm sewer down to 12" storm sewer through a busy
commercial area. Project also included sewer and sewer services, water main and water services and shoring of existing
infrastructure.
Ankeny Rock Creak Division 3 Lateral Sewer: This project was completed in fall of 2012 and the project scale totaled approximately
$2.4 million. The project engineer was Chris Pedersen with Snyder Engineering (contact information on reference sheet). This project
consisted of up to 36 foot deep sanitary lateral piping as well as very deep service tie ins and septic abandonments. The general
nature of the work was to service an entire community with gravity sewer to replace their existing septic systems. This project was
very extensive including major restoration of properties.
Council Bluffs South 32nd Street Sanitary Sewer Improvements: This project was completed in fall of 2008. The project size was
approximately $500,000.00. Snyder & Associates was the design firm and Jeff Kopocis was the project engineer. The project
consisted of by-pass sewer pumping and deep 42" sanitary trunk line installation. Service line installations and tie-ins were also
required. Sanitary structures were large rectangular structures with epoxy lining. Work also Included removals of pavement, service
line Installations, tie-ins and site restoration.
Leon WW Treatment System Improvements: This project was completed In the spring of 2012 and the project scale totaled
approximately $1 million. The project engineer was Nathan Casey at MSA and the general contractor was Woodruff Construction.
Dave Warren (contact information attached) was the project manager on this project. The project consisted of various sizes of deep
sanitary and storm including creek crossings and pump stations. Work also included water main and service work through residential
areas.
1307 E. Lincoinway, PO Box 1790, Ames, IA 50010 515-233-5500 phone 515-233-4049 fax
Des Moines Sewer Repair Contract 1: This project was completed in the fall of 2012 and the project scale totaled approximately $1
million. The project engineer was Zach Erickson (contact information on reference sheet) with the City of Des Moines. The general
nature of the work consisted of multiple sewer locations around the City of Des Moines, most of which were extensive and within
tight constraints.
Pella Fountain Hills Development Plat 3 & 4: This project was completed in the fall of 2012 and the project scale totaled
approximately $1.25 million. The project engineer was Garden & Associates and the general contractor was Manatt's out of
Brooklyn, lowa. The general nature of the work consisted of deep sanitary, storm sewer and water main with related services. This
development was one of the largest residential developments in the State of Iowa that took place in 2012.
Urbandale Windsor Heights Sanitary District Sanitary Point Repairs: This project was completed in the spring of 2012 and the
project scale totaled approximately $800,000.00. The project engineer was Becky Ford with V&K Engineers (contact information on
reference sheet). The general nature of the work consisted of sanitary point repairs throughout the City of Urbandale and Windsor
Heights which was the first phase of an overall project to reline the existing sanitary sewer system.
Des Moines Water Works Water System Improvements: This project was completed in the summer of 2013 and the project scale
totaled approximately $500,000.00. The project engineer was Dan Klopfer with Des Moines Water Works. The general nature of the
work was to replace the entire water main and service system within three communities in the city of Des Moines.
Altoona Prairie Vista Sewer: This protect was completed fall of 2013 and the project scale totaled approximately $500,000.00. The
project engineer was Wes Farrand with Snyder & Associates (contact information on reference sheet). The general nature of the
work consisted of the installation of a deep sewer trunk line to provide gravity sewer to a development that was on a lift station. The
work also consisted of demolition and abandonment of the existing lift station.
**PLEASE CALL IF ADDITIONAL PORTFOLIO INFORMATION IS NEEDED.
1307 E. Lincolnway, PO Box 1790, Ames, IA 50010 515-233-5500 phone 515-233-4049 fax
EQUIPMENT ALLOCATED FOR WATERLOO NO
NAME CREEK (AS NEEDED)
EXCAVATORS
HITACHI 600 CLC
JOHN DEERE 450D LC
JOHN DEERE 225C RTS
TRACK LOADERS
CAT 963
CAT 299
CRAW ER DOZERS
JOHN DEERE 650J
COMPACTORS
CAT433 SINGLE DRUM ROLLER
KHP 210 HOE PACK
WHEEL LOADER
JOHN DEERE 624J
Job References:
Snyder & Associates Engineering
Chris Peterson, PE
2727 SW Snyder Boulevard
PO Box 1159
Ankeny, IA 50023
(515) 964-2020
Wesley C. Farrand, PE
2727 SW Snyder Boulevard
PO Box 1159
Ankeny, IA 50023
(515) 964-2020
Veentra & Klmm Engineering
Tony Bellizzi, PE
3000 Westown Pkwy
W. Des Moines, IA 50266-1320
(800) 241-8000
Todd Peniston, PE
3000 Westown Pkwy
W. Des Moines, IA 50266-1320
(800) 241-8000
Rebecca Ford, PE
3000 Westown Pkwy
W. Des Moines, IA 50266-1320
Larson & Larson Construction
Jim Trees
10703 Justin Drive
Des Moines, IA 50322
(515) 371-6347
Steve Pigneri
10703 Justin Drive
Des Moines, IA 50322
(515) 727-5000
City of Carroll
Randall Krauel, PE City Engineer
112 E 5th Street
Carroll, IA 51401-2799
(712) 792-1000
City Des Moines
Zachary L. Erickson, PE
Civil Engineer 1
400 East First Street
Des Moines, IA
(515) 283-4023
Matt Becker, PE
400 East First Street
Des Moines, IA
(515) 283-4026
Marty McKinnie
400 East First Street
Des Moines, IA
(515) 283-4177
Jeff Hansen, PE
400 East First Street
Des Moines, IA
(515) 283-4014
Woodruff Construction
Jason Rechkemmer
1890 Kountry Lane
Fort Dodge, IA
(515) 576-1118
Dave Warren
1920 Philadelphia Suite 102
Ames, IA
(515) 232-4535
Sternquist Construction
Brad Freeman
1110 N. 14th Street
Indianola, IA
(515) 961-8127
Company Owner Short Biography:
Jeremy Feldmann ofJ&K Contracting has been involved with underground municipal utilities in and around the Des
Moines area for nearly 20 years. Jeremy started in the construction business as an operator/laborer for Horsefield
Construction in Epworth, Iowa. He then went to work for Dave Schmidt Construction in Cedar Falls, Iowa while
attending Upper Iowa University. In 1995, Jeremy went to work for ACI Mechanical in Ames as a plumber and foreman.
After attending Iowa State University, Jeremy joined KRI Company in 1998 where he was trained in project management
and performed as the company superintendent. In 2007, he established J&K Contracting. Jeremy is currently a board
member for National Utility Contractors of Iowa and is also a standing member of National Federation of Independent
Business Owners.
J&K Short Information Summary:
Established in 2007 in Ames, Iowa, J&K Contracting is a full service sewer, water and excavating contractor. J&K
performs work across the state of Iowa including interstate, highway and municipal street construction as well as
building sitework and development. The company has also grown to specialize in water and wastewater treatment
underground process piping. J&K has the capability to perform deep sewer projects that exceed 30 to 40 feet in depth.
Ranging from hard bid projects and negotiated work to emergency sewer or water repair the company is recognized as a
competitive and diversified Central Iowa Organization. J&K field employees are the heart of its business and are trained
annually in trench safety, OSHA rules and regulations & CPR. Currently J&K employs over 40 employees. The office
management has been brought from the ground up with the ability to perform operations in the field and behind the
desk which is a powerful tool in day to day problem solving and risk management. J&K is proud to have established good
relationships with Targe general contractors and paving contractors and is a contractor of choice for these organizations.
Please contact us at 515-233-5500 if you have any questions.
Sincerely,
Jeremeldmann
President
J & K Contracting LLC
515-450-6815
1307 E. Lincolnway, PO Box 1790, Ames, IA 50010 515-233-5500 phone 515-233-4049 fax
Bid Tabulation
No Name Creek Interceptor Sewer
City of Waterloo, Iowa
City Contract No. 849
AECOM Project No. 60283855
Opening : 4:00 p.m.
November 12, 2013
L•\work\project\60283855\400_Technical\421_Quant&Cost-Est\Waterloo - No Name Creek Sewer - Bib Tab.xlsx
Engineers
Estimate
J & K
Contracting. LLC
Ricklefs
Excavating, Ltd.
Peterson
Contractors Inc.
Manger I
Construction, lnc.
Holland
Contracting
Tschiggfrie
Excavating
Item
Description
Unit
Estimated Quantity
Unit Price
Total Price
Unit Price
Total Price
Unit Price
Total Price
Unit Price
Total Price
Toial Price
!!1
Unit Price
Total Price
Unit Price
Total Price
1
MOBILIZATION
LS
1.0
35,010.00
$ 35,010.00
$ 80,000.00
$ 80,000.00
$ 200,000.00
$ 200,000.00
$ 225,000.00
225,000.00
$ 75,750.00
$ 75,750.00
$ 85,000.00
$ 85,000.00
$ 75,338.85
$ 75,338.85
2
RAILROAD FLAGGERS
DAY
12.0
1,300.00
$ 15,600.00
$ 600.00
$ 7,200.00
$ 1,000.00
$ 12,000.00
$ 1,600.00
_$
$ 19,200.00
$ 1,500.00
$ 18,000.00
$ 1,375.00
$ 16,500.00
$ 1,495.00
$ 17,940.00
3
CLEARING AND GRUBBING
AC
1.0
8,000.00
$ 8,000.00
$ 11,600.00
$ 11,600.00
$ 5,000.00
$ 5,000.00
$ 8,500.00
$ 8,500.00
$ 13,350.00
$ ' 13,350.00
$ 16,000.00
$ 16,000.00
$ 6,487.50
$ 6,487.50
4
SANITARY SEWER PIPE, TRENCHED (DIP), 18"
LF
80.0
250.00
$ 20,000.00
$ 206.00
$ 16,480.00
$ 200.00
$ 16,000.00
$ 200.00
$ 16,000.00
$ 209.25
$ 16,740.00
$ 350.00
$ 28,000.00
$ 382.80
$ 30,624.00
5
SANITARY SEWER PIPE, TRENCHED (PVC), 18"
LF
4,092.0
75.00
$ 306,900.00
$ 101.00
$ 413,292.00
$ 180.00
$ 736,560.00
$ 64.00
$ 261,888.00
$ 153.30
$ 1627,303.60
$ 270.00
$ 1,104,840.00
$ 244.25
$ 999,471.00
6
SANITARY SEWER PIPE, TRENCHED (PVC), 10"
LF
91.0
55.00
$ 5,005.00
$ 72.00
$ 6,552.00
$ 170.00
$ 15,470.00
$ 67.00
$ 6,097.00
$ 53.30
$ 4,850.30
$ 110.00
$ 10,010.00
$ 51.80
5 4,713.80
7
SANITARY SEWER PIPE, TRENCHED (PVC), 8"
LF
90.0
45.00
$ 4,050.00
$ 71.00
$ 6,390.00
$ 165.00
$ 14,850.00
$ 66.00
$ 5,940.00
$ 51.85
$ 4,666.50
$ 109.00
$ 9,810.00
$ 49.25
$ 4,432.50
8
SANITARY SEWER PIPE, TRENCHLESS (PVC), 18"
LF
665.0
200.00
$ 133,000.00
$ 187.00
$ 124,355.00
$ 320.00
$ 212,800.00
$ 875.00
$ 581,875.00
$ 611.70
$ 406,780.50
$ 1,650.00
$ 1,097,250.00
$ 1,826.20
$ 1,214,423.00
9
REMOVAL OF SANITARY SEWER PIPE, 12"
LF
70.0
25.00
$ 1,750.00
$ 31.00
$ 2,170.00
$ 30.00
$ 2,100.00
$ 21.00
$ 1,470.00
$ 3.90
$ 273.00
$ 25.00
$ 1,750.00
$ 16.75
$ 1,172.50
10
FILL AND PLUG SANITARY SEWER PIPE, 12"
LF
2,320.0
12.00
$ 27,840.00
$ 6.50
$ 15,080.00
$ 1.20
$ 2,784.00
$ 20.00
$ 46,400.00
$ 5.25
$ 12,180.00
$ 10.00
$ 23,200.00
$ 13.10
$ 30,392.00
11
MANHOLE, SANITARY SEWER, SW -301, 48 IN.
EA
15.0
5,000.00
$ 75,000.00
$ 4,600.00
$ 69,000.00
$ 4,500.00
$ 67,500.00
$ 5,500.00
$ 82,500.00
$ 6,500.00
$ 97,500.00
$ 7,000.00
$ 105,000.00
$ 17,241.05
$ 258,615.75
12
MANHOLE, SANITARY SEWER, SPECIAL INCLUDES SLUICE GATE
EA
1.0
15,000.00
$ 15,000.00
$ 26,250.00
$ 26,250.00
$ 23,000.00
$ 23,000.00
$ 32,000.00
$ 32,000.00
$ 33,785.00
$ 133,785.00
$ 32,840.00
$ 32,840.00
$ 53,566.75
$ 53,566.75
13
SANITARY MANHOLE ADJUSTMENT, MAJOR
EA
1.0
3,900.00
$ 3,900.00
$ 3,400.00
$ 3,400.00
$ 400.00
$ 400.00
$ 4,500.00
$ 4,500.00
$ 4,875.00
$ 4,875.00
$ 7,000.00
$ 7,000.00
$ 6,237.25
$ 6,237.25
14
CONNECTION TO EXISTING MANHOLE
EA
5.0
750.00
$ 3,750.00
$ 2,500.00
$ 12,500.00
$ 550.00
$ 2,750.00
$ 2,000.00
$ 10,000.00
$ 11,810.00
$ 59,050.00
$ 4,000.00
$ 20,000.00
$ 4,735.80
$ 23,679.00
15
SANITARY MANHOLE REMOVAL
EA
14.0
750.00
$ 10,500.00
$ 400.00
$ 5,600.00
$ 300.00
$ 4,200.00
$ 600.00
$ 8,400.00
$ 2,125.00
$ 29,750.00
$ 1,700.00
$ 23,800.00
$ 1,837.80
$ 25,729.20
16
ON-SITE TOPSOIL
CY
7,460.0
5.00
$ 37,300.00
$ 2.00
$ 14,920.00
$ 2.50
$ 18,650.00
$ 3.75
$ 27,975.00
$ 3.00
$ 22,380.00
$ 8.00
$ 59,680.00
$ 7.10
$ 52,966.00
17
GRANULAR SURFACING FOR DRIVEWAYS
SY
1,400.0
7.00
$ 9,800.00
$ 7.00
$ 9,800.00
$ 6.00
$ 8,400.00
$ 10.00
$ 14,000.00
$ 9.00
$ 12,600.00
$ 10.00
$ 14,000.00
$ 15.40
$ 21,560.00
18
SEEDING, FERTIUZING AND MULCHING FOR HYDRAULIC SEEDING
AC
9.3
3,000.00
$ 27,900.00
$ 3,300.00
$ 30,690.00
$ 2,900.00
$ 26,970.00
$ 1,800.00
$ 16,740.00
$ 3,290.00
$ 30,597.00
$ 3,000.00
$ 27,900.00
$ 3,392.50
$ 31,550.25
19
SILT FENCE INSTALLATION
LF
2,000.0
2.00
$ 4,000.00
$ 2.50
$ 5,000.00
$ 1.75
$ 3,500.00
$ 1.75
$ 3,500.00
$ 2.65
$ 5,300.00
$ 5.00
$ 10,000.00
$ 2.75
$ 5,500.00
20
SILT FENCE, REMOVAL OF SEDIMENT
LF
2,000.0
1.00
$ 2,000.00
$ 0.50
$ 1,000.00
$ 0.20
$ 400.00
$ 1.00
$ 2,000.00
$ 0.50
$ 1,000.00
$ 1.50
$ 3,000.00
$ 0.40
$ 800.00
21
SILT FENCE REMOVAL
LF
2,000.0
0.50
$ 1,000.00
$ 0.50
$ 1,000.00
$ 0.20
$ 400.00
$ 1.00
$ 2,000.00
$ 0.45
$ 900.00
$ 1.50
5 3,000.00
$ 0.30
$ 600.00
22
INLET PROTECTION
EA
1.0
100.00
$ 100.00
$ 255.00
$ 255.00
$ 200.00
$ 200.00
$ 300.00
$ 300.00
$ 155.00
$ 155.00
$ 500.00
$ 500.00
$ 575.00
$ 575.00
23
INLET PROTECTION, MAINTENANCE
EA
1.0
25.00
$ 25.00
$ 155.00
$ 155.00
$ 100.00
$ 100.00
$ 100.00
$ 100.00
$ 55.00
$ 55.00
$ 150.00
$ 150.00
$ 272.50
$ 272.50
24
ROCK CHECK DAM INSTALLATION
EA
2.0
450.00
$ 900.00
$ 200.00
$ 400.00
$ 50.00
$ 100.00
$ 250.00
$ 500.00
$ 130.00
$ 260.00
$ 360.00
$ 720.00
$ 87.55
$ 175.10
25
ROCK CHECK DAM REMOVAL
EA
2.0
210.00
$ 420.00
$ 170.00
$ 340.00
$ 40.00
$ 80.00
$ 100.00
$ 200.00
$ 35.00
$ 70.00
$ 800.00
$ 1,600.00
$ 162.95
$ 325.90
26
TEMPORARY ROLLED EROSION CONTROL PRODUCTS, TYPE 2.D
SY
625.0
2.00
$ 1,250.00
$ 10.00
$ 6,250.00
$ 2.50
$ 1,562.50
$ 2.00
$ 1,250.00
$ 4.40
$ 2,750.00
$ 5.00
$ 3,125.00
$ 4.60
$ 2,875.00
Total
$ 750,000.00
$ 869,679.00
$ 1,375,776.50
$ 1,378,335.00
$ 1,480,920.90
$ 2,704,675.00
$ 2,870,022.85
L•\work\project\60283855\400_Technical\421_Quant&Cost-Est\Waterloo - No Name Creek Sewer - Bib Tab.xlsx