Loading...
HomeMy WebLinkAboutJ & K Contracting-12/9/2013 (2)Mayor BUCK CLARK COUNCIL MEMBERS .n.... DAVID JONES Ward I CAROLYN COLE Ward 2 HAROLD GETTY Ward 3 QUENTIN HART Ward 4 RON WELPER Ward 5 BOB GREENWOOD At -Large STEVE SCHMITT At -Large CITY OF WATERLOO, IOWA WASTE MANAGEMENT SERVICES 3505 EASTON AVE. WATERLOO, IA 50702 (319) 291-4553 FAX (319) 291-4523 LARRY N. SMITH SUPERINTENDENT Council Communication City Council Meeting: 12/9/2! 13 Prepared: 12/4/2013 Dept. Head Signature: # of Attachments: 1 1 SUBJECT: No Name Creek Interceptor Sewer City Contract No. 849 Submitted by: Larry N. Smith, WMS Superintendent Recommended City Council Action: Resolution approving award of bid and contract based on discussion and qualification to J & K Contracting LLC of Ames, Iowa in the amount of $869,679.00 for No Name Creek Interceptor Sewer, City Contract No. 849. Summary Statement: J&K Contracting completed the Statement of Bidder's Qualification Form, which is attached. It appears that they are capable of completing the work and have had significant experience in constructing sanitary sewer work in Iowa. Expenditure Required: $869,679.00 Source of Funds: Sewer Bonds Policy Issue: Alternative: Background Information: WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer A=COM December 3, 2013 Mr. Larry Smith Water Pollution Control Facilities 3505 Easton Avenue Waterloo, Iowa 50702 Subject: No Name Creek Interceptor Sewer City Contract No. 849 AECOM #60283855 Dear Larry, AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com As you know, bids for the above -referenced project were received and opened on November 12, 2013. A copy of the Bid Tabulation is attached. The low bidder was J & K Contracting LLC of Ames, Iowa. To follow-up the bidding, we requested that J & K Contracting complete the Statement of Bidder's Qualifications Form from the specifications, which we have also attached. It appears that they are capable of completing the work and have had significant experience in constructing sanitary sewer work in Iowa. In addition to the above, we had discussions with several other Contractors who had looked at the project. We wanted to see if we could determine why there was such a range in the bids. Some of the Contractors were concerned with the directional drilling portions of the work, some were concerned with the dewatering, and there were some concerns about encountering rock. We discussed the project with Mr. Matt Runge of J & K Contracting and believe they will be able to complete the work in accordance with the Plans & Specifications. If we encounter unforeseen conditions, we will deal with them in accordance with the Contract Documents; and they are in agreement with that approach. Based on our discussions and the qualifications of J & K Contracting, we recommend that the No Name Creek Interceptor Sewer be awarded to J & K Contracting LLC of Ames, Iowa, in the amount of $869,679.00. We recommend this action be taken by the Council at their meeting on December 9, 2013. If you have any questions or need additional information in this matter, please let us know. Yours sincerely, Robert E. Bamsey, P Attachments: As Noted c: Mr. Eric Thorson (w/enclosures) Ms. Suzy Schares (w/enclosures) Ms. Michelle Weidner (w/enclosures) Mr. Doug Schindel (w/enclosures) P:\60283855\200_Correspondence\12-3-13 IsNo Name Creek Recommendation Ltr.docx Bid Tabulation No Name Creek Interceptor Sewer City of Waterloo, Iowa City Contract No. 849 AECOM Project No. 60283855 Opening : 4:00 p.m. November 12, 2013 L:\work\project\60283855\400 Technical\421_Quant&Cost-Est\Waterloo - No Name Creek Sewer - Bib Tab.xlsx Bidder Amount Engineers Estimate $ 750,000.00 1 J & K Contracting. LLC $ 869, 679.00 2 Ricklefs Excavating, Ltd. $ 1,375,776.50 3 Peterson Contractors Inc. $ 1,378,335.00 4 Minger Construction, Inc. $ 1,480,920.90 5 Holland Contracting $ 2,704,675.00 6 Tschiggfrie Excavating $ 2,870,022.85 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - L:\work\project\60283855\400 Technical\421_Quant&Cost-Est\Waterloo - No Name Creek Sewer - Bib Tab.xlsx r r 1. c I' STATEMENT OF BIDDER'S OUALIFICA ONS (To be submitted by the Bidder only upon the specific request of the City of Waterloo, Iowa.) All questions must be answered and the date given must be cleat: and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of bidder. J&K CONTRACTING, LLC. 2. Permanent mein office address. 1 When organized. 11-24-06 4. ifa corporation, when i . 11-24-06 1307 EAST LINCOLN WAY AMES, IOWA 50010 5. How many years have you been engaged in the contraeting business under your present firm or trade name? 7 YEARS 6. Contracts on hand: (Schedule these, showing ataoimt of each Contract and the appropriate anticipated datea of completion.) SEE ATTACHED 7. General ammeter ofwork p edbyyouroompw* SEWER & WATER CONSTRUCTION 8. Have you ever hailed to complete any work awarded to you? If eo, where and why? NO 9. Have you ever dehutted on a contract? If so, where and why? NO 10. List the more important projects recently completed by your company, stating the approximate cost for each, and month and year completed. SEE ATTACHED 11. List your major equipment avaihabie for this contract SEE ATTACHED 12. Experience in Construction work similar In importance to this project. SEE ATTACHED 13. Background and experience of the principal members of your organization, inahrding the offiicer& 14. Credit available: $ 400,000.00 SEE ATTACHED 15. Give bank reference_ SEE ATTACHED 16. Will you, upon request, frli out a detailed financial statement and furnish any other information that may be required by the City of Watedoo, 'owe? IF REQUIRED STATEMENT OP BIDDERS QUAURCATONS CONTRACT NO- 249 SQ -1 of 2 69223855 LP L'b5 • ;MEM 611 ON IZVIU.NO3 Smouoramvnt, SMSCIREI 40J10IAG1VJS •• *a•NOLL3aSJOQN7•*� r 7023200 pt@ sew --1 4i Att.. ax atl saes pue s>aada- ;o Ksp 30NnU WASH.LLIMI Alwariary-- Jo imp wit eau augeg oa moms pap smegazeupts p® Poe suocaw tb 2alockuoj a a4 =mom sevetp pun (uallazParOP am'N) Jo Tnp2uwqL"•�'j 'i'1 /9/04.0 J0 Aunt0 MI L —411(Hdo 9 D7 t.r "mgnEWE ` 3?�jw perm •suopwg►runb s1rapprg jo auame7elS sign gaistcdarm ape;roatz atp 3o aoelagtrrae m ludo' `001 M. 3aAimat8 ft parAmIsu oouetaro}tu AuR gsnrrn,} of trogesodmo so scusg 'aos>,d etre numb= pun nefrupas Awn pefliszapmi au, 'LI Job # J&K Current Work On Hand (Updated 11/1 Contract Value 5/13) Value Remaining Approx. Completion Date Job Name 1103CF Cedar Falls Wastewater Treatment Plant Modifications $ 1,526,955.00 $ 81,500.00 12/31/2013 1205PB Parkersburg CDBG Storm Sewer Improvements $ 1,242,000.00 $ 35,000.00 12/1/2013 1208AM Ames Mary Greeley Medical Center Addition & Renovation $ 675,000.00 $ 633,000.00 11/15/2014 12135C State Center CDBG Sanitary Sewer Rehabilitation $ 495,000.00 $ 45,000.00 6/15/2014 12251N Indianola Wastewater Collection System Rehabilitation Phase 4 $ 960,000.00 $ 55,000.00 12/31/2013 1229SL Storm Lake Sanitary Sewer Improvements $ 1,381,625.00 $ 65,000.00 12/31/2013 1313GR Grimes Jordan Well 79,945.00 $ 56,000.00 6/1/2014 1322NB Iowa DOT Northbound 1-35 Rest Area (Elkhart Location) _$ $ 2,259,000.00 $ 2,111,000.00 10/1/2014 1323SB Iowa DOT Southbound 1-35 Rest Area (Elkhart Location) $ 675,000.00 $ 294,000.00 10/1/2014 1326NV Nevada Sanitary Sewer Rehabilitation $ 85,000.00 $ 15,000.00 12/1/2013 1328WK Waukee SE LA Grant Parkway $ 892,890.00 $ 495,000.00 10/1/2014 13290M DSM Waterworks Wilchinski Standpipe Control Valve $ 144,420.00 $ 36,000.00 12/15/2013 1332AL Altoona Ambrose Water Improvements $ 275,000.00 $ 10,000.00 12/1/2013 1333CL Clive North Walnut Creek Sewer $ 331,445.00 $ 45,000.00 12/31/2013 1335AL Altoona Ambrose Pump Station $ 1,245,000.00 $ 937,000.00 5/30/2014 1338NV Nevada 2013 Street Improvements $ 1,992,692.00 $ 1,992,692.00 9/30/2014 Job Summary: Des Moines Rlverpoint West Street Improvements: Completed in 2010 as subcontractor to Sternquist Construction (contact information on reference sheet). Our project scope totaled approximately $1.5 million. The design engineering firm was Snyder & Associates. Matt Becker (contact information on reference sheet) was the managing engineer for the City of Des Moines. This work consisted of up to 32 foot deep 8" and 12"sanitary trunk line Installation along with tie-ins and service work. This work also included major site dewatering systems. Water main and storm piping for new Improvements were included as well. Alden Wastewater Collection & Rehab: This project was completed fall of 2011 and our scope totaled $1.1 million. The project engineer was Tim Moreau with V&K Engineers and the general contractor was Visu-Sewer. The project consisted of both deep and shallow sanitary point repairs including by-pass pumping and street restoration. This work was coordinated with Visu-Sewer's sanitary sewer relining. Des Moines Court Avenue Pump Station: This project was completed November of 2012 and the project scale totaled approximately $550,000.00. The project engineer was Veenstra & Kimm and the general contractor was Larson & Larson Construction. The project consisted of a pump station construction with associated piping, auger bores and surface restoration. This project was in downtown Des Moines in a highly trafficked and public area. Woodbury County IDOT Sioux City 1-29 Interstate Widening: This project was completed in 2011 and our project portion was approximately $1.5 million. The project design was completed by the Iowa DOT. J&K worked under subcontract to Knife River Construction (paving contractor). Our work consisted of removal and replacement of storm sewer ranging from 15" to 48" in size. Work also includes multiple auger borings & storm sewer jacking, as well as construction of over 100 intakes. Job consists of very tight working area with intricate traffic staging along this busy stretch of 1-29 Interstate. Clive DOT University Boulevard Improvements: This project was completed in fall of 2011 and the project scale totaled approximately $1 million. The project engineer is Jim Hagelie with the City of Clive and the general contractor is Sternquist Construction (contact attached). This project consisted of large diameter 84° storm sewer down to 12" storm sewer through a busy commercial area. Project also included sewer and sewer services, water main and water services and shoring of existing infrastructure. Ankeny Rock Creak Division 3 Lateral Sewer: This project was completed in fall of 2012 and the project scale totaled approximately $2.4 million. The project engineer was Chris Pedersen with Snyder Engineering (contact information on reference sheet). This project consisted of up to 36 foot deep sanitary lateral piping as well as very deep service tie ins and septic abandonments. The general nature of the work was to service an entire community with gravity sewer to replace their existing septic systems. This project was very extensive including major restoration of properties. Council Bluffs South 32nd Street Sanitary Sewer Improvements: This project was completed in fall of 2008. The project size was approximately $500,000.00. Snyder & Associates was the design firm and Jeff Kopocis was the project engineer. The project consisted of by-pass sewer pumping and deep 42" sanitary trunk line installation. Service line installations and tie-ins were also required. Sanitary structures were large rectangular structures with epoxy lining. Work also Included removals of pavement, service line Installations, tie-ins and site restoration. Leon WW Treatment System Improvements: This project was completed In the spring of 2012 and the project scale totaled approximately $1 million. The project engineer was Nathan Casey at MSA and the general contractor was Woodruff Construction. Dave Warren (contact information attached) was the project manager on this project. The project consisted of various sizes of deep sanitary and storm including creek crossings and pump stations. Work also included water main and service work through residential areas. 1307 E. Lincoinway, PO Box 1790, Ames, IA 50010 515-233-5500 phone 515-233-4049 fax Des Moines Sewer Repair Contract 1: This project was completed in the fall of 2012 and the project scale totaled approximately $1 million. The project engineer was Zach Erickson (contact information on reference sheet) with the City of Des Moines. The general nature of the work consisted of multiple sewer locations around the City of Des Moines, most of which were extensive and within tight constraints. Pella Fountain Hills Development Plat 3 & 4: This project was completed in the fall of 2012 and the project scale totaled approximately $1.25 million. The project engineer was Garden & Associates and the general contractor was Manatt's out of Brooklyn, lowa. The general nature of the work consisted of deep sanitary, storm sewer and water main with related services. This development was one of the largest residential developments in the State of Iowa that took place in 2012. Urbandale Windsor Heights Sanitary District Sanitary Point Repairs: This project was completed in the spring of 2012 and the project scale totaled approximately $800,000.00. The project engineer was Becky Ford with V&K Engineers (contact information on reference sheet). The general nature of the work consisted of sanitary point repairs throughout the City of Urbandale and Windsor Heights which was the first phase of an overall project to reline the existing sanitary sewer system. Des Moines Water Works Water System Improvements: This project was completed in the summer of 2013 and the project scale totaled approximately $500,000.00. The project engineer was Dan Klopfer with Des Moines Water Works. The general nature of the work was to replace the entire water main and service system within three communities in the city of Des Moines. Altoona Prairie Vista Sewer: This protect was completed fall of 2013 and the project scale totaled approximately $500,000.00. The project engineer was Wes Farrand with Snyder & Associates (contact information on reference sheet). The general nature of the work consisted of the installation of a deep sewer trunk line to provide gravity sewer to a development that was on a lift station. The work also consisted of demolition and abandonment of the existing lift station. **PLEASE CALL IF ADDITIONAL PORTFOLIO INFORMATION IS NEEDED. 1307 E. Lincolnway, PO Box 1790, Ames, IA 50010 515-233-5500 phone 515-233-4049 fax EQUIPMENT ALLOCATED FOR WATERLOO NO NAME CREEK (AS NEEDED) EXCAVATORS HITACHI 600 CLC JOHN DEERE 450D LC JOHN DEERE 225C RTS TRACK LOADERS CAT 963 CAT 299 CRAW ER DOZERS JOHN DEERE 650J COMPACTORS CAT433 SINGLE DRUM ROLLER KHP 210 HOE PACK WHEEL LOADER JOHN DEERE 624J Job References: Snyder & Associates Engineering Chris Peterson, PE 2727 SW Snyder Boulevard PO Box 1159 Ankeny, IA 50023 (515) 964-2020 Wesley C. Farrand, PE 2727 SW Snyder Boulevard PO Box 1159 Ankeny, IA 50023 (515) 964-2020 Veentra & Klmm Engineering Tony Bellizzi, PE 3000 Westown Pkwy W. Des Moines, IA 50266-1320 (800) 241-8000 Todd Peniston, PE 3000 Westown Pkwy W. Des Moines, IA 50266-1320 (800) 241-8000 Rebecca Ford, PE 3000 Westown Pkwy W. Des Moines, IA 50266-1320 Larson & Larson Construction Jim Trees 10703 Justin Drive Des Moines, IA 50322 (515) 371-6347 Steve Pigneri 10703 Justin Drive Des Moines, IA 50322 (515) 727-5000 City of Carroll Randall Krauel, PE City Engineer 112 E 5th Street Carroll, IA 51401-2799 (712) 792-1000 City Des Moines Zachary L. Erickson, PE Civil Engineer 1 400 East First Street Des Moines, IA (515) 283-4023 Matt Becker, PE 400 East First Street Des Moines, IA (515) 283-4026 Marty McKinnie 400 East First Street Des Moines, IA (515) 283-4177 Jeff Hansen, PE 400 East First Street Des Moines, IA (515) 283-4014 Woodruff Construction Jason Rechkemmer 1890 Kountry Lane Fort Dodge, IA (515) 576-1118 Dave Warren 1920 Philadelphia Suite 102 Ames, IA (515) 232-4535 Sternquist Construction Brad Freeman 1110 N. 14th Street Indianola, IA (515) 961-8127 Company Owner Short Biography: Jeremy Feldmann ofJ&K Contracting has been involved with underground municipal utilities in and around the Des Moines area for nearly 20 years. Jeremy started in the construction business as an operator/laborer for Horsefield Construction in Epworth, Iowa. He then went to work for Dave Schmidt Construction in Cedar Falls, Iowa while attending Upper Iowa University. In 1995, Jeremy went to work for ACI Mechanical in Ames as a plumber and foreman. After attending Iowa State University, Jeremy joined KRI Company in 1998 where he was trained in project management and performed as the company superintendent. In 2007, he established J&K Contracting. Jeremy is currently a board member for National Utility Contractors of Iowa and is also a standing member of National Federation of Independent Business Owners. J&K Short Information Summary: Established in 2007 in Ames, Iowa, J&K Contracting is a full service sewer, water and excavating contractor. J&K performs work across the state of Iowa including interstate, highway and municipal street construction as well as building sitework and development. The company has also grown to specialize in water and wastewater treatment underground process piping. J&K has the capability to perform deep sewer projects that exceed 30 to 40 feet in depth. Ranging from hard bid projects and negotiated work to emergency sewer or water repair the company is recognized as a competitive and diversified Central Iowa Organization. J&K field employees are the heart of its business and are trained annually in trench safety, OSHA rules and regulations & CPR. Currently J&K employs over 40 employees. The office management has been brought from the ground up with the ability to perform operations in the field and behind the desk which is a powerful tool in day to day problem solving and risk management. J&K is proud to have established good relationships with Targe general contractors and paving contractors and is a contractor of choice for these organizations. Please contact us at 515-233-5500 if you have any questions. Sincerely, Jeremeldmann President J & K Contracting LLC 515-450-6815 1307 E. Lincolnway, PO Box 1790, Ames, IA 50010 515-233-5500 phone 515-233-4049 fax Bid Tabulation No Name Creek Interceptor Sewer City of Waterloo, Iowa City Contract No. 849 AECOM Project No. 60283855 Opening : 4:00 p.m. November 12, 2013 L•\work\project\60283855\400_Technical\421_Quant&Cost-Est\Waterloo - No Name Creek Sewer - Bib Tab.xlsx Engineers Estimate J & K Contracting. LLC Ricklefs Excavating, Ltd. Peterson Contractors Inc. Manger I Construction, lnc. Holland Contracting Tschiggfrie Excavating Item Description Unit Estimated Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Toial Price !!1 Unit Price Total Price Unit Price Total Price 1 MOBILIZATION LS 1.0 35,010.00 $ 35,010.00 $ 80,000.00 $ 80,000.00 $ 200,000.00 $ 200,000.00 $ 225,000.00 225,000.00 $ 75,750.00 $ 75,750.00 $ 85,000.00 $ 85,000.00 $ 75,338.85 $ 75,338.85 2 RAILROAD FLAGGERS DAY 12.0 1,300.00 $ 15,600.00 $ 600.00 $ 7,200.00 $ 1,000.00 $ 12,000.00 $ 1,600.00 _$ $ 19,200.00 $ 1,500.00 $ 18,000.00 $ 1,375.00 $ 16,500.00 $ 1,495.00 $ 17,940.00 3 CLEARING AND GRUBBING AC 1.0 8,000.00 $ 8,000.00 $ 11,600.00 $ 11,600.00 $ 5,000.00 $ 5,000.00 $ 8,500.00 $ 8,500.00 $ 13,350.00 $ ' 13,350.00 $ 16,000.00 $ 16,000.00 $ 6,487.50 $ 6,487.50 4 SANITARY SEWER PIPE, TRENCHED (DIP), 18" LF 80.0 250.00 $ 20,000.00 $ 206.00 $ 16,480.00 $ 200.00 $ 16,000.00 $ 200.00 $ 16,000.00 $ 209.25 $ 16,740.00 $ 350.00 $ 28,000.00 $ 382.80 $ 30,624.00 5 SANITARY SEWER PIPE, TRENCHED (PVC), 18" LF 4,092.0 75.00 $ 306,900.00 $ 101.00 $ 413,292.00 $ 180.00 $ 736,560.00 $ 64.00 $ 261,888.00 $ 153.30 $ 1627,303.60 $ 270.00 $ 1,104,840.00 $ 244.25 $ 999,471.00 6 SANITARY SEWER PIPE, TRENCHED (PVC), 10" LF 91.0 55.00 $ 5,005.00 $ 72.00 $ 6,552.00 $ 170.00 $ 15,470.00 $ 67.00 $ 6,097.00 $ 53.30 $ 4,850.30 $ 110.00 $ 10,010.00 $ 51.80 5 4,713.80 7 SANITARY SEWER PIPE, TRENCHED (PVC), 8" LF 90.0 45.00 $ 4,050.00 $ 71.00 $ 6,390.00 $ 165.00 $ 14,850.00 $ 66.00 $ 5,940.00 $ 51.85 $ 4,666.50 $ 109.00 $ 9,810.00 $ 49.25 $ 4,432.50 8 SANITARY SEWER PIPE, TRENCHLESS (PVC), 18" LF 665.0 200.00 $ 133,000.00 $ 187.00 $ 124,355.00 $ 320.00 $ 212,800.00 $ 875.00 $ 581,875.00 $ 611.70 $ 406,780.50 $ 1,650.00 $ 1,097,250.00 $ 1,826.20 $ 1,214,423.00 9 REMOVAL OF SANITARY SEWER PIPE, 12" LF 70.0 25.00 $ 1,750.00 $ 31.00 $ 2,170.00 $ 30.00 $ 2,100.00 $ 21.00 $ 1,470.00 $ 3.90 $ 273.00 $ 25.00 $ 1,750.00 $ 16.75 $ 1,172.50 10 FILL AND PLUG SANITARY SEWER PIPE, 12" LF 2,320.0 12.00 $ 27,840.00 $ 6.50 $ 15,080.00 $ 1.20 $ 2,784.00 $ 20.00 $ 46,400.00 $ 5.25 $ 12,180.00 $ 10.00 $ 23,200.00 $ 13.10 $ 30,392.00 11 MANHOLE, SANITARY SEWER, SW -301, 48 IN. EA 15.0 5,000.00 $ 75,000.00 $ 4,600.00 $ 69,000.00 $ 4,500.00 $ 67,500.00 $ 5,500.00 $ 82,500.00 $ 6,500.00 $ 97,500.00 $ 7,000.00 $ 105,000.00 $ 17,241.05 $ 258,615.75 12 MANHOLE, SANITARY SEWER, SPECIAL INCLUDES SLUICE GATE EA 1.0 15,000.00 $ 15,000.00 $ 26,250.00 $ 26,250.00 $ 23,000.00 $ 23,000.00 $ 32,000.00 $ 32,000.00 $ 33,785.00 $ 133,785.00 $ 32,840.00 $ 32,840.00 $ 53,566.75 $ 53,566.75 13 SANITARY MANHOLE ADJUSTMENT, MAJOR EA 1.0 3,900.00 $ 3,900.00 $ 3,400.00 $ 3,400.00 $ 400.00 $ 400.00 $ 4,500.00 $ 4,500.00 $ 4,875.00 $ 4,875.00 $ 7,000.00 $ 7,000.00 $ 6,237.25 $ 6,237.25 14 CONNECTION TO EXISTING MANHOLE EA 5.0 750.00 $ 3,750.00 $ 2,500.00 $ 12,500.00 $ 550.00 $ 2,750.00 $ 2,000.00 $ 10,000.00 $ 11,810.00 $ 59,050.00 $ 4,000.00 $ 20,000.00 $ 4,735.80 $ 23,679.00 15 SANITARY MANHOLE REMOVAL EA 14.0 750.00 $ 10,500.00 $ 400.00 $ 5,600.00 $ 300.00 $ 4,200.00 $ 600.00 $ 8,400.00 $ 2,125.00 $ 29,750.00 $ 1,700.00 $ 23,800.00 $ 1,837.80 $ 25,729.20 16 ON-SITE TOPSOIL CY 7,460.0 5.00 $ 37,300.00 $ 2.00 $ 14,920.00 $ 2.50 $ 18,650.00 $ 3.75 $ 27,975.00 $ 3.00 $ 22,380.00 $ 8.00 $ 59,680.00 $ 7.10 $ 52,966.00 17 GRANULAR SURFACING FOR DRIVEWAYS SY 1,400.0 7.00 $ 9,800.00 $ 7.00 $ 9,800.00 $ 6.00 $ 8,400.00 $ 10.00 $ 14,000.00 $ 9.00 $ 12,600.00 $ 10.00 $ 14,000.00 $ 15.40 $ 21,560.00 18 SEEDING, FERTIUZING AND MULCHING FOR HYDRAULIC SEEDING AC 9.3 3,000.00 $ 27,900.00 $ 3,300.00 $ 30,690.00 $ 2,900.00 $ 26,970.00 $ 1,800.00 $ 16,740.00 $ 3,290.00 $ 30,597.00 $ 3,000.00 $ 27,900.00 $ 3,392.50 $ 31,550.25 19 SILT FENCE INSTALLATION LF 2,000.0 2.00 $ 4,000.00 $ 2.50 $ 5,000.00 $ 1.75 $ 3,500.00 $ 1.75 $ 3,500.00 $ 2.65 $ 5,300.00 $ 5.00 $ 10,000.00 $ 2.75 $ 5,500.00 20 SILT FENCE, REMOVAL OF SEDIMENT LF 2,000.0 1.00 $ 2,000.00 $ 0.50 $ 1,000.00 $ 0.20 $ 400.00 $ 1.00 $ 2,000.00 $ 0.50 $ 1,000.00 $ 1.50 $ 3,000.00 $ 0.40 $ 800.00 21 SILT FENCE REMOVAL LF 2,000.0 0.50 $ 1,000.00 $ 0.50 $ 1,000.00 $ 0.20 $ 400.00 $ 1.00 $ 2,000.00 $ 0.45 $ 900.00 $ 1.50 5 3,000.00 $ 0.30 $ 600.00 22 INLET PROTECTION EA 1.0 100.00 $ 100.00 $ 255.00 $ 255.00 $ 200.00 $ 200.00 $ 300.00 $ 300.00 $ 155.00 $ 155.00 $ 500.00 $ 500.00 $ 575.00 $ 575.00 23 INLET PROTECTION, MAINTENANCE EA 1.0 25.00 $ 25.00 $ 155.00 $ 155.00 $ 100.00 $ 100.00 $ 100.00 $ 100.00 $ 55.00 $ 55.00 $ 150.00 $ 150.00 $ 272.50 $ 272.50 24 ROCK CHECK DAM INSTALLATION EA 2.0 450.00 $ 900.00 $ 200.00 $ 400.00 $ 50.00 $ 100.00 $ 250.00 $ 500.00 $ 130.00 $ 260.00 $ 360.00 $ 720.00 $ 87.55 $ 175.10 25 ROCK CHECK DAM REMOVAL EA 2.0 210.00 $ 420.00 $ 170.00 $ 340.00 $ 40.00 $ 80.00 $ 100.00 $ 200.00 $ 35.00 $ 70.00 $ 800.00 $ 1,600.00 $ 162.95 $ 325.90 26 TEMPORARY ROLLED EROSION CONTROL PRODUCTS, TYPE 2.D SY 625.0 2.00 $ 1,250.00 $ 10.00 $ 6,250.00 $ 2.50 $ 1,562.50 $ 2.00 $ 1,250.00 $ 4.40 $ 2,750.00 $ 5.00 $ 3,125.00 $ 4.60 $ 2,875.00 Total $ 750,000.00 $ 869,679.00 $ 1,375,776.50 $ 1,378,335.00 $ 1,480,920.90 $ 2,704,675.00 $ 2,870,022.85 L•\work\project\60283855\400_Technical\421_Quant&Cost-Est\Waterloo - No Name Creek Sewer - Bib Tab.xlsx