Loading...
HomeMy WebLinkAboutAecom Technical Services-8/13/2012A=COM AECOM 319 232 6531 tel 501 Sycamore Street 319 232 0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com FY 2012 AND FY 2013 VERTICAL INFRASTRUCTURE PROJECTS IDOT PROJECT NOS. 91120AL0200 AND 91130AL0200 WATERLOO REGIONAL AIRPORT WATERLOO, IOWA Project Description - See Attachment Scope of Services - See Attachment Compensation A. Compensation for services will be on an hourly basis in accordance with the hourly fees and other direct expenses in effect at the time the services are performed for a not -to - exceed fee of Twenty Four Thousand Eight Hundred Dollars ($24,800.00) without authorization of the Client. General Conditions Except as specifically amended by this agreement, services shall be provided in accordance with the Consultant Services Agreement for the Waterloo Regional Airport between AECOM Technical Services, Inc., formerly known as Earth Tech, Inc., and the Waterloo Airport Board dated December 5, 2008. APPROVED: APPROVED: CITY OF WA RLOO, IOWA AECOM TECHNICAL SERVICES, INC. By Date ffa Ernest G. Clark, Mayor rst- (20 (<2._ By ,,/}e"Douglas W. Schi•l, P.E. Sub -District Manager Date August 3, 2012 SCOPE OF SERVICES FY 2012 AND FY 2013 VERTICAL INFRASTRUCTURE PROJECTS IDOT PROJECT NOS. 91120ALO200 AND 91130ALO200 WATERLOO REGIONAL AIRPORT WATERLOO, IOWA 1. Project Description The project is described as the projects associated with the Iowa Department of Transportation FY 2012 and FY 2013 Vertical Infrastructure Projects. Projects identified in the grant include the following: 1. Completion of Rehabilitation of T -Hangar A — Siding and Roofing — based on assumption that funding for this work will come from FY11 and FY12 Vertical Infrastructure Grants. 2. Rehabilitation of T -Hangar B — Siding and Roofing — based on assumption that funding for this work will come from FY12 and FY13 Vertical Infrastructure Grants. 3. Rehabilitation of SRE Building — Waterproof Roof — approximately 12,000 SF funded by FY13 Vertical Infrastructure Grant. 4. Rehabilitation of T -Hangar Floors — based on portion of floor in one t -hangar if funds are available from FY13 Vertical Infrastructure Grant. II. Scope of Services The work to be performed by the Consultant includes the following tasks: 1. Data Collection and Review - This task consists of the collection of existing data applicable to this project and related to the proposed work site. The record drawings of completed projects and utility information will be compiled as background information for the project. As part of this task, a field survey will be performed to collect dimensional sketches as necessary. The Client shall coordinate with lease holders of each of the hangar units so that the Consultant can gain access to these in a timely manner for the purpose of survey and photographic documentation of the hangar space. 2. Final Design - This task consists of the preparation of the final bid documents for this project, including specifications, drawings (if required) and cost estimates. The final plans and/or specifications will set forth the requirements of the design phase. 3. Final Project Specifications - This task consists of the preparation of specifications for the project. The specifications will be in compliance with current City of Waterloo and Iowa Department of Transportation requirements in effect at the time the specifications are prepared. 4. Estimate of Probable Construction Cost - This task consists of the preparation of an estimate of construction costs based upon the plans and specifications. This statement of probable construction cost prepared by the Consultant represents the Consultant's best judgment as a design professional at the time the estimate is drawn. It is recognized, however, that neither the Consultant nor the Client has any control over the cost of labor, materials or equipment; over the contractor's method of determining bid prices; or over competitive bidding or market conditions. Accordingly, the Consultant cannot and does not guarantee that bids will not vary from any Statement of Probable Construction Cost or other cost estimates prepared by the Consultant. 5. Quality Review - This task consists of the quality review of work elements on the project. During the course of this project, quality reviews will be conducted by senior technical personnel not directly involved in the project. 6. Bid Assistance - This task consists of assisting the Client in advertising for and receiving bids or quotes, analyzing the bids or quotes received and preparing a recommendation to the Client for award of contract. 7. Bid Document Interpretation - This task consists of answering bid document interpretation questions from bidders, preparing and issuing any required addenda. 8. Resident Review - This task consists of limited on-site construction review at key critical construction operations to observe construction operations to determine compliance with contract documents. Site reviews will be documented in a construction journal. Coordination with airport tenants related to this project will be the responsibility of the Client. 9. Project Administration - This task consists of office administration and coordination of the project. Interoffice meetings, general day-to-day administrative responsibilities, and typing of interoffice memoranda and minutes of meetings are included in this task. L:\work.ADMI N\AGREE\PROF\WatAirFY12FY13I DOTVertI nfra. doc