HomeMy WebLinkAboutAecom Technical Services-8/13/2012 (4)ACOM
July 31, 2012
Mr. Bradley Hagen, A.A.E.
Director of Aviation
Waterloo Regional Airport
2790 Livingston Lane
Waterloo, IA 50703
SUBJECT: Rehabilitate Airfield Vault
Waterloo Regional Airport
Waterloo, Iowa
FAA AIP Project No. 3-19-0094-40
AECOM ID No. 60180158
Dear Mr. Hagen:
AECOM 515 323 7910 tel
500 SW 7th Street 515 244 4803 fax
Suite 301
Des Moines, Iowa 50309
www.aecom.com
Transmitted herewith for City Council consideration are five (5) copies of the Mid American Energy
Company Electric Distribution Extension Agreement to extend the electric distribution system to make
electric service to the Snow Removal Equipment Building and a Maintenance Building at the Waterloo
Regional Airport. These building are currently being serviced from the existing electrical vault. The
Snow Removal Equipment Building is currently being served by a 2400 -volt system that needs to be
eliminated. Providing new distribution system services to these buildings is more economical than
continuing to serve these buildings from the electrical vault. The cost of this agreement is included in
the grant for this project.
Please return three (3) fully executed copies of this agreement to our office for distribution to Mid
American Energy and FAA.
If you have any questions or require additional information, please feel free to contact our office at your
convenience.
Yours sincerely,
tri:4
Steven J. aton, P.E.
Enclosure: As noted
L:\work\project\60180158 WLO Apt Rwy Light Vault\200_Correspondence\201-202_Incoming-Outgoing\BH073112.MdAmerican.ltr.doc
2-2e
12-6-05
MidAmerican Energy Company
ELECTRIC DISTRIBUTION EXTENSION AGREEMENT
NON-REFUNDABLE CONTRIBUTION IN AID OF CONSTRUCTION
MidAmerican Energy Company, an Iowa Corporation, its successors and assigns, (Company), and
Waterloo Airport
its successors and assigns, (Applicant) agree as follows:
1. Company will extend its electric distribution system as required to make electric service available to the following platted and
described area:
2835 & 2837 Betsworth Dr., Waterloo, IA
2. The Company shall:
a. Install, own, operate and maintain the electric distribution system and reserves the right to extend or alter the system
in the future if necessary.
b. Furnish all necessary labor and materials required for the construction of such distribution system.
c. Schedule such installation with Applicant so as to provide timely service.
3. The Applicant shall:
a. Provide, without cost to the Company, such easements as are necessary for the construction, operation and
maintenance of the electric distribution system.
b. Provide easement areas: 1) cleared of all obstructions; 2) within 4" of final grade over the route of the distribution
system; 3) with streets finished to local specifications; and 4) with sewer and water installed.
c. Place visible stakes, including lot numbers, on all lot corners and easement lines.
d. Provide drawings showing the location of all present and future underground facilities.
e. Provide the concrete transformer pads, conduit systems, and other facitlities where required by the Company's tariffs
and electric service manual (includes an inspection by a Company representative prior to pouring the pads or
covering the conduit system).
f. Locate all underground facilities such as storm sewers, sanitary sewers, septic lines and water lines that are not
located by members of a one -call locating system.
g. Indemnify, protect and hold harmless the Company from and against all liability, damage, loss, claims and actions
any nature whatsoever which arise out of damage to underground facilities resulting from the customer's failure
to correctly locate such facilities as required under this agreement.
h. Hold Company harmless for any loss, cost or damage caused by delays in construction of the distribution system and
services.
4. Applicant agrees to pay $6,761.51
as a contribution in aid of construction in accordance with Company's tariff. The cash
contribution in aid of construction shall be due when this Agreement is signed by Applicant. If Applicant requires that the
installation be completed during the winter construction season, or when adverse working conditions impede construction,
Applicant shall pay an additional non-refundable sum of $ 4'97 per foot. The Company reserves the right to
determine when such winter construction season conditions exist.
—S—Within-the area described above; Company-will-provide-eledric-service-to-custorners-in-accordance with Company's -tariffs -and
regulatory requirements.
MIDAMERICAN ENERGY COMPANY APPLI
ByClay Youngblut
By / F
Title Distribution Design Technician Title
WMIs # 2300230 Date Wanted
District Waterloo Date Signed
�IS� �� ,