Loading...
HomeMy WebLinkAboutPrairie Construction Services-9/10/2012 (2)atimA Change Order Document G701' - 2001 PROJECT (Name and address): 12032 City of Waterloo Clerk's Office Renovation TO CONTRACTOR (Name and address): Prairie Construction Services, Inc. 321 West 18th Street Waterloo, Iowa 50702 CHANGE ORDER NUMBER: 001 DATE: July 11, 2012 ARCHITECT'S PROJECT NUMBER: 12032 CONTRACT DATE: June 19,2012 CONTRACT FOR: General Construction OWNER: 0 ARCHITECT: 0 CONTRACTOR: 0 FIELD: ❑ OTHER: 0 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) 1. Cost associated with omitting the asbestos abatement work frorn the project. Per PR#01 dated 07.03.2012. DEDUCT: $21,390.00 The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be decreased by this Change Order in the amount of The new Contract Sum including this Change Order will be $ 97,800.00 $ 0.00 $ 97,800.00 $ 21,390.00 $ 76,410.00 The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. INVISION Architecture, LTD ARCHITECT (Firm name) 501 Sycamore #101, PO Box 1800, Waterloo, IA 50704-1800 Prairie Construction Services, Inc. CONTRACTOR (Firm name) 321 West 18th Street, Waterloo, Iowa 5070 AD City of Waterloo OWNER (Firm name) City H. 1, 715 Mulberry Street, Waterloo, Iow 703 BY (ignature) Michael Broshar, FAIA (Typed name) 11 12— DATE BY (Signature) Chuck Seastrand (Typed name) DATE 77/ (Signature (Typed name,) (: l DATE AIA Document G701 Ty - 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:39:19 on 07/11/2012 under Order No.8204059657_1 which expires on 07/19/2013, and is not for resale. User Notes: (1835414594) Project: Project Number: Owner: Owner Contact: Contractor: Contractor Contact: Contract Date: PROPOSAL REQUEST City Hall Clerk's Office Renovation PR #: 01 12032 Date: 07/03/2012 City of Waterloo Description: Craig Clark Prairie Construction Services Bill Smart Omit Asbestos Abatement Please submit an itemized quotation for changes in the contract sum and/or time incidental to proposed modifications to the contract documents described herein. THIS IS NOT A CHANGE ORDER OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Description: Submit amount to omit the asbestos abatement work from the project. Net amount of this Proposed Change k ; _'.t (Deduct) (NZ)Ix) Net Change in Working Days Due . . Proposed ChangeP�l(�eli(No Change) d CONTRRAIRT � �� • ,1 BY: tdillfam L. RUC ION SERVICES, INC. DATE: July 6, 2012 Senior Estima tor ARCHITECT: 1nvisiVly RAf l.6 E f Recommend Acceptance ❑ Do Not Recommend Acceptance ❑ Other BY: 41AMA DATE: 1/9 / 20 2- 21,390.00 0.00 OWNER: [Recommend Acceptance D Do Not Recommend Acceptance ❑ Other, BY: DATE: /G; - l-2 fx: 15I5j 633 2042