HomeMy WebLinkAboutPeterson Contractors, Inc.-10/1/2012CHANGE ORDER NO. 2 Owner. City of Waterloo, Iowa Date: August 22, 2012 Project: FY 2011 Anaerobic Lagoon Influent Pump Station Owner's Contract No.: 807 Contractor Peterson Contactors, Inc. Please return this copy to: City Clerk & Finance Department 715 Mulberry Street Waterloo, IA 50703 Date of Contract Start: August 17, 2011 $ 1,145,000.00 You are directed to make the following changes in the Contract Documents. Description: 8002: Substitute Electric Hoist for Manual Pump Hoist, Including Electrical Work - ADD $7,26234 8003: Coat Valve Vault Interior Piping With Epoxy - ADD 4.145.75 TOTAL ADD $11,408.09 Reason for Change Order: 8002: Manual hoist included in original work. 8003: Epoxy coating not included in original work. CONTRACT PRICE CONTRACT TIMES (Calendar Days) To Completion Original: $ 1,145,000.00 Original: December 30, 2011 Previous C.O.s (ADDS: $ 4,275.00 Previous C.O.s (ADD/DEDUCT): This C.O. (ADD/BEC): $ 11,408.09 This C.O. (ADD/DEDUCT): Contract Price With All Approved Change Orders: $ 1,160,683.09 REVISED: December 30, 2011 Revised Completion Date: December 30, 2011 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting fi uui the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO APPROVED: By: „61,k, Owner (Authorized Signature) ACCEPTED: By: Date: Contractor (Authorized Signature) Date: L:\work\project\1 13632\adnm\60184424.41-Anaerobic Lagoon Specs\CO 2.doc AECOM 113632.41 2 Project No. Change Order No.