Loading...
HomeMy WebLinkAboutPeterson Contractors, Inc-10/1/2012CHANGE ORDER NO. 2 Owner: City of Waterloo, Iowa Date: August 22, 2012 Project: F Y 2011 Anaerobic Lagoon Influent Pump Station Please return this copy to: City Clerk & Finance Department 715 Mulberry Street Waterloo, IA 50703 Owner's Contract No.: 807 Contractor: Peterson Contractors, Inc. Date of Contract Start: August 17, 2011 $ 1,145,000.00 You are directed to make the following changes in the Contract Documents. Description: 8002: Substitute Electric Hoist for Manual Pump Hoist, Including Electrical Work - ADD $7,262.34 8003: Coat Valve Vault Interior Piping With Epoxy - ADD 4.145.75 TOTAL ADD $11,408.09 Reason for Change Order: 8002: Manual hoist included in original work. 8003: Epoxy coating not included in original work. CONTRACT PRICE Original: $ 1,145,000.00 Original: Previous C.O.s (ADDIDEEDUCT): $ 4,275.00 Previous C.O.s (ADD/DEDUCT): This C.O. (ADD/DEBUG-T.): $ 11,408.09 This C.O. (ADD/DEDUCT): Contract Price With All Approved Change Orders: $ 1,160,683.09 REVISED: CONTRACT TIMES (Calendar Days) To Completion December 30, 2011 December 30, 2011 Revised Completion Date: December 30, 2011 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and thne allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO APPROVED: By: 0 ACCEPTED: By: ntractor (Authriied Signature) Date: Date: L:\work\projectl113632\admn\60184424.41-Anaerobic Lagoon Specs\CO 2.doc AECOM 113632.41 2 Project No. Change Order No. COM October 16, 2012 Mr. Larry Smith Water Pollution Control Facilities 3505 Easton Avenue Waterloo, Iowa 50702 Subject: Anaerobic Lagoon Pumping Station City Contract No. 807 AECOM #113632.41 AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com Dear Larry, Enclosed please find a signed copy of Change Order No. 2 to the above -referenced project for your files. If you have any questions or need anything further in this matter, please let us know. Yours sincerely, Robert E. Bamsey, P.E. Enclosure: As Noted c: Ms. Suzy Schares (w/enclosure) T/UIsAnLagoonPumpStation-CO2.docx