Loading...
HomeMy WebLinkAboutAecom Technical Services-11/5/2012 (2)A=COM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CEDAR RIVER ENHANCEMENTS CITY OF WATERLOO, IOWA SUPPLEMENTAL AGREEMENT NO. 1 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo, Iowa (Client), and AECOM Technical Services, Inc. (ATS) of Waterloo, Iowa, dated November 4, 2011, for preliminary design and study of four Cedar River Enhancements Projects, including: 1) developing a navigable connection between the East Lake and the Cedar River, 2) developing construction estimates for repairs to the existing San Souci Wing Dam, 3) incorporating boat docks between Park Avenue and MuIlan Avenue, and 4) creating pedestrian connections from U.S. Highway 63 to the Center for the Arts and the adjacent River Walk Loop; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 1 for final design and construction plan preparation for the repairs to the San Souci Wing Dam. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: I. Project Description The project consists of construction of repairs to the San Souci Wing Dam on the Cedar River in Waterloo, Iowa. I I. Scope of Services The Scope of Services will encompass and include all detailed work, services, materials, equipment, personnel and supplies necessary to provide design survey, final design and construction plan preparation, and construction -related services for the project. The project will be divided into two phases. The first phase will include design services, including the preparation of plans and specifications in a format suitable for a City of Waterloo letting. The second phase will include construction -related services, which will be determined at the time the services are needed. Phase I - Design Services The Scope of Services for the Design Phase is further defined as follows: Design Survey (Tasks 1-2) The following identifies tasks leading to the completion of the design survey required for the project: Task 1 - Data Collection Task 2 - Survey and Base Mapping A=COM Construction Plans (Tasks 3-13) Page 2 These tasks include developing final construction plans for the San Souci Wing Dam Repairs. Included in these tasks will be the typical cross-sections, tabulations and quantities, final plan and profile sheets, tabulations, design cross sections, construction cost estimate and technical specifications. The following specific tasks lead to the completion of the construction plans. Task 3 - Title and Legend Sheets Task 4 - Typical Sections and Details Task 5 - Bid Items and General Notes a. Bid Item and Quantity Listing b. Estimate Reference Information c. General Notes Task 6 - Tabulations and Quantities Task 7 - Plan and Profile Sheets Task 8 — Staging and Access Plan Task 9 - Quality Control Review and Final Revisions Task 10 - Construction Cost Estimate Task 11 - Specifications Task 12 - Printing and Submittals Task 13 - Field Review Project Administration, Coordination and Meetings (Tasks 14-16) These tasks include project administration, agency coordination and two meetings throughout the project development. These tasks also include pre -letting activities and general project administration. The following identifies tasks leading to the completion of project administration, meetings and coordination during the design phase of the project. Task 14 - Proiect Meetings/Agency Coordination (No New Permits Anticipated) Task 15 - Pre -Letting Activities Task 16 - Project Administration Phase 11— Construction -Related Services The scope of construction -related services will be determined at the time the services are needed and defined under a future amendment to this agreement. Construction -related services include construction staking, on-site field review, materials testing, contract administration during construction and right-of-way staking. III. Compensation Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement. Total compensation is an estimated fee of Twenty -Three Thousand Three Hundred Dollars ($23,300.00) and shall be segregated with the fees estimated for Part VI of the original agreement. A=COM Page 3 IV. In all other respects, the obligations of the Client and ATS shall remain as specified in the Professional Services Agreement dated November 4, 2011. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below: AECOM TECHNICAL SERVICES, INC. By2 Douglas WSohindel, P.E. Sub -District Manager CITY OF WATERLOO, IOWA By: Ernest G. Clark Mayor ATTEST: L:\work\ADMIN\AGREE UPPLE\SA1WatCedarRiverEnhance.doc Date October 31, 2012 Date NON-k4urr51It9—