Loading...
HomeMy WebLinkAboutDon Gardner Construction Co-5/29/20120174 Vat If Ie Document G701'" - 2001 t Change Order PROJECT (Name and address): 11014 Waterloo Center for the Arts Window Replacement TO CONTRACTOR (Name and address): Don Gardner Construction Co. Inc 315 LaPorte Road Waterloo, IA 50702 CHANGE ORDER NUMBER: 006 DATE: May 17, 2012 ARCHITECT'S PROJECT NUMBER: 11014 CONTRACT DATE: August 12, 2011 CONTRACT FOR: General Construction OWNER: ❑ ARCHITECT: ❑ CONTRACTOR: ❑ FIELD: ❑ OTHER: El THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) 1. Cost associated with installing an aluminum storefront glass enclosure as shown. Per PR #3R dated 05.08.2012 ADD: $7,475 The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be $ $ $ 178,974.00 -1,134.53 177,839.47 7,475.00 185,314.47 The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. INVISION Architecture ARCHITECT (Firm name) PO Box 1800 Waterloo, IA 50704-1800 ADDRES Don Gardner Construction Co. Inc CONTRACTOR (Firm name) 315 LaPorte Road, Waterloo, IA 50702 City of Waterloo OWNER (Firm name) City Hall, 715 Mulberry Street, Waterloo, Iowa 5113 BY (Signi'ure) Joshua ► emmer, AIA (Typed name DATE BY (Signature) Mark Gardner (Typedjiame) DATE (Signature) s'1- A , ck�y-L (Typed name) PCN[ �-- DATE AIA Document G701 TM - 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. AU rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:44:55 on 05/17/2012 under Order No.5896542442_1 which expires on 07/19/2012, and is not for resale. User Notes: (930699642) *MA Document G701TM - 2001 Change Order PROJECT (Name and address): 11014 Waterloo Center for the Arts Window Replacement TO CONTRACTOR (Name and address): Don Gardner Construction Co. Inc 315 LaPorte Road Waterloo, IA 50702 CHANGE ORDER NUMBER: 007 DATE: May 17, 2012 ARCHITECT'S PROJECT NUMBER: 11014 CONTRACT DATE: August 12, 2011 CONTRACT FOR: General Construction OWNER: ❑ ARCHITECT: 0 CONTRACTOR: 0 FIELD: 0 OTHER: 0 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) 1. Cost associated with replacing existing door 212C with a medium stile hollow metal door. Per PR #3R dated 05.08.2012 ADD: $6,472 The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is $ 178,974.00 $ 6,340.47 $ 185,314.47 $ 6,472.00 $ 191,786.47 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. INVISION Architecture ARCHITECT (Firm name) PO Box 1800, Waterloo, IA 50704-1800 ADD Don Gardner Construction Co. Inc CONTRACTOR (Firm name) 315 LaPorte Road, Waterloo, IA 50702 City of Waterloo OWNER (Firm name) City Hall, 715 Mulberry Street, Waterloo, Iowa 50703 SS s BY (Siature, Jos . Demmer, AIA (Tyed name, 17/AI- DATE BY (Signature) Mark Gardner (Typedd� ame) DATE Y (Signature) (Typed name) �2— DATE AIA Document G701'"1 — 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:48:52 on 05/17/2012 under Order No.5896542442_1 which expires on 07/19/2012, and is not for resale. User Notes: (927414084) PROPOSAL REQUEST Project: WCA Window Replacement Project Number: 11014 Owner: City of Waterloo Owner Contact: Craig Clark Contractor: Don Gardner Construction Contractor Contact: Mack Gardner Contract Date: 08/12/11 PR #: 03 (Revised) Date: Description: Revised 05/08/12 Install glass enclosure at east stair Please submit an itemized quotation for changes in the contract sum and/or time incidental to proposed modifications to the contract documents described herein. THIS IS NOT A CHANGE ORDER OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Description: Provide pricing to install an aluminum storefront glass enclosure as shown on the attached drawing dated 5/8/12. Storefront glazing shall be 1/4" tempered. The aluminum door shall be as follows: • 3'-6" x 7'-0" Aluminum o Side rails: 4 inch o Top Rail: 6 inch o Bottom Rail: 12 inch • Door Glazing: 1/4" Tempered Stair enclosure door hardware shall be as per the following table: it Enclosure, Door Raidwa I minaacturer Description Hinges 4 Hagen Exit Device Cylinder Closer 1 Von Duprin BB -1191 (or approved equal) 9847Lx 992L (or approved equal) CHAMPAGNE CHAMPAGNE 1 Falcon 951 626 1 LCN 4011(H) (or approved equal) CHAMPAGNE Kick Plate Wall Stop 1 Ives 840010° x 40° US32D 1 Ives WS407 US32D 0 0 0 li • I .••^ L... 11101 111 0771 1 NI VISI C) NI Please also provide with the cost proposal a price to replace the existing door 212C shown below. Efforts should be made to salvage existing door hardware for reuse. The new doors shall be as follows: • 3'-0" x 7'-0" Hollow Metal o Side rails: 4 inch o Top Rail: 6 inch o Bottom Rail: 12 inch o Paint white color to match existing adjacent door frame • Door Glazing: 1/4' Tempered Per the door hardware shop drawings from the Youth Pavilion project, the existing door hardware for door 212C is as shown in the following table. The contractor should visit the site to verify that the existing door hardware can be salvaged for reuse. If existing door hardware cannot be reused, the contractor shall submit a price to install new door hardware. r Inc`Hardware per the shop draw ngs submittal suitsnittaiirOMt o Youtt Pavilion Proje Manufacturer :-.Description t rcan_ LL US26D Hinges i;(/an 6 Ives 5BB1 4.5x4.5 Exit Device 2 Von Duprin 9847L -F x 992L Cylinder Closers 2 Falcon 951 Kick Plates 2 2 LCN Ives 4011(H) 840010° x 34" US26D 626 ALUM US32D 9—a' I T7A 1-4 111111111_1 -_.' N11111111,3... DN 205 STRUCT. STAIN FL }ia C 4 44. — O n 0 try tra yo$ ni Q C 2 sawmamma ! 2 5 2 Q 'ME 40" 4 (.6" 14' 1 IfI Jj , rnimamm ;