Loading...
HomeMy WebLinkAboutAecom Technical Services-5/7/2012Please return this copy to: City Clerk & Finance Department 715 Mulberry Street Waterloo, IA 50703 AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CEDAR VALLEY RIVERFRONT RENAISSANCE WATERLOO VISION IOWA PROJECTS ADDITIONAL CONSTRUCTION REVIEW SERVICES FOR RIVER WALK LOOP PROJECTS AND THE LOWER PLAZA SUPPLEMENTAL AGREEMENT NO. 16 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo, Iowa (Client), and AECOM Technical Services, Inc., formerly Earth Tech, Inc. (Consultant), of Waterloo, Iowa, dated September 22, 2003, for the preliminary design, final design and construction -related services for the Cedar Valley Riverfront Renaissance, Waterloo Vision Iowa Projects, including the three major projects known as the Riverwalk Loop, Cedar River Dam Improvements and the Cedar River Plaza and Amphitheatre in Waterloo, Iowa; and WHEREAS, Supplemental Agreement No. 1 was entered into between the Client and the Consultant dated January 24, 2005, for Phase II - Final Design Services of selected alternatives; and WHEREAS, Supplemental Agreement No. 2 was entered into between the Client and the Consultant dated October 10, 2005, for Phase III - Construction -Review Services for that portion of the project including floodwall modifications at the Lower Plaza and Waterloo Center for the Arts Youth Pavilion; and WHEREAS, Supplemental Agreement No. 3 was entered into between the Client and the Consultant dated September 18, 2006, for Phase III — Construction -Review Services for that portion of the project including the Riverwalk Loop Trail from East 6th Street to 18th Street; and WHEREAS, Supplemental Agreement No. 4 was entered into between the Client and the Consultant dated May 21, 2007, for Phase III — Construction Review Services for that portion of the project including the Waterloo Dam Rehabilitation and River Wall Reconstruction; and WHEREAS, Supplemental Agreement No. 5 was entered into between the Client and Consultant dated June 15, 2007, for Phase III - Construction Review Services for that portion of the project including the Riverwalk Loop Trail from Cedar Bend Park to Mullan Avenue; and WHEREAS, Supplemental Agreement No. 6 was entered into between the Client and the Consultant dated September 2, 2008, for Phase III - Construction Review Services for that portion of the project including the Riverwalk Loop Trail Enhancements (Overlooks) along the north side of the Cedar River, from 6th Street to the Cedar River Dam; and WHEREAS, Supplemental Agreement No. 7 was entered into between the Client and the Consultant dated October 20, 2008, for Phase III - Construction Review Services for repairs of damage to portions of the project along the Cedar River caused by the flood of 2008; and WHEREAS, Supplemental Agreement No. 8 was entered into between the Client and the Consultant, dated August 17, 2009, for final design services for Mark's Park and additional design services for a Performance Structure for the amphitheatre area of the Lower Plaza; and WHEREAS, Supplemental Agreement No. 9 was entered into between the Client and the Consultant, dated March 26, 2010, for Phase III - Construction Review Services for that portion of the project including the Riverwalk Loop Trail from West 6th Street to 18th Street on the south side of the Cedar River; and 'COM Page 2 WHEREAS, Supplemental Agreement No. 10 was entered into between the Client and the Consultant, dated April 26, 2010, for Phase III - Constructed Review Services for that portion of the project including the Lower Plaza, additional construction review services for the Waterloo Dam Rehabilitation and River Wall Construction, and for additional design services for the Cedar Valley Riverfront Renaissance Waterloo Vision Iowa Projects; and WHEREAS, Supplemental Agreement No. 11 was entered into between the Client and the Consultant, dated December 13, 2010, for that portion of the project including electrical service modifications for the Cattle Congress Sanitary Pump Station; and WHEREAS, Supplemental Agreement No. 12 was entered into between Client and the Consultant dated March 14, 2011, for Phase III - Construction -Review Services for that portion of the project including both the Riverwalk Loop Trail on the north side of the river from Mullan Avenue to Park Avenue and the Mark's Park and the Performance Structure; and WHEREAS, Supplemental Agreement No. 13 was entered into between the Client and the Consultant dated March 14, 2011, for Phase III, Construction -Review Services for that portion of the project including the Cattle Congress Storm Water Pump Station; and WHEREAS, Supplemental Agreement No. 14 was entered into between the Client and the Consultant dated May 16, 2011, for Phase III, Construction -Review Services for that portion of the project including the FY 2011 River Renaissance Upper Plaza; and WHEREAS, Supplemental Agreement No. 15 was entered into between the Client and the Consultant dated November 21, 2011, for that portion of the project including additional features near Mark's Park and the Performance Structure; and WHEREAS, the Client and the Consultant now desire to enter into Supplemental Agreement No. 16 for additional construction review services for the Lower Plaza and the Riverwalk Loop projects. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: Project Description The project consists of providing additional construction -review services for the Lower Plaza Project and the Riverwalk Loop Projects, which include funding from the State of Iowa. The Riverwalk Loop Projects, which have state funding, include the 6th -18th Street Recreational Trail on the south side of the river, the Overlooks Enhancement Project, the North Downtown Trail and the Cedar River Water Trail. II. Scope of Services The Scope of Services will include all work, services, materials, equipment, personnel and supplies necessary to provide the additional construction services required by the funding agencies for the Riverwalk Loop Projects identified in addition to additional services required for the Lower Plaza Project. The project consists of the following three elements: / COM Page 3 1. Additional construction -review services required by the Iowa Department of Transportation to complete a full materials audit on the Riverwalk Loop Projects which have state funding. This is a new requirement as previous recreational trail projects completed did not require a materials audit for the project. 2. Additional reporting requirements for the projects involving unique funding, including economic stimulus, I -Jobs, Vision Iowa, and Great Places Funding. Reporting was completed throughout the duration of the projects with the above - referenced funding sources and was not included in the original construction -review services. 3. Additional construction -review services required for the Lower Plaza Project. These services included the following project elements: • Property Owner Coordination. Substantial coordination was required during construction of the project with adjacent property owners and stakeholders. This included coordinating construction schedules with adjacent parking and business usage, utility service coordination and responding to stakeholder concerns. • Project Administration. Due to the complexity of the project, in addition to three construction contracts being completed in the same general area — Lower Plaza, Upper Plaza and Mark's Park — additional coordination time was required for the Lower Plaza Project. With the three projects being completed simultaneously,16 subcontractors and three prime contractors were completing work within the same area. • Project Duration. As the project did require additional time due to the coordination and construction of the three projects involved in the Plaza area, additional construction review time has been required for project oversight, contract administration and construction meetings. Additional Construction -Review Services for Iowa DOT Materials Audit (Tasks 1-3) These tasks include work necessary to prepare and complete a materials audit for the Iowa Department of Transportation for the following projects: • 6 -18th Street Recreational Trail (ESL -8155(709)-7S-07, City Contract No. 761) • Overlooks Enhancement Project (STP -ES -8155(694)-81-07, City Contract No. 743) • North Downtown Trail (STP -E -8155(721)-8U-07), City Contract No. 786 • Cedar River Water Trail (NRT-NT08(1)-96-07, City Contract No. 734 Task 1. Prepare materials submittal in accordance with the Iowa DOT requirements for each of the four referenced projects listed above. Task 2. Conduct a meeting with the Iowa DOT to review the materials submittal. Task 3. Respond to comments received from the Iowa DOT and finalize materials audit for each of the four projects. ACOM Page 4 Additional Construction -Review Services for Project Reporting Requirements (Tasks 4-7) These tasks include additional reporting requirements needed for the Riverwalk Loop Projects which included economic stimulus, I -Jobs, Vision Iowa and Great Places funding. Task 4. This task includes preparing and submitting quarterly economic stimulus reports for the 6 -18th Street Recreational Trail Project. Task 5. This task includes preparing and submitting quarterly I -Jobs reports for the Mark's Park and Performance Structure Project. Task 6. This task includes preparing reports for the Vision Iowa Board to update the Board on project status. Task 7. This task includes preparing and submitting quarterly reports to Great Places for the North Downtown Trail Project. Additional Construction -Review Services for Lower Plaza Project (Tasks 8-10) These tasks include additional construction -review services necessary for the Lower Plaza Project, including property owner coordination, project administration and additional construction oversight throughout the duration of the project. Task 8. This task includes coordination with the adjacent property owners and stakeholders during project construction. This task includes on-site and office coordination with adjacent business owners for parking concerns, utility service coordination and responding to stakeholder concerns. Task 9. This task includes additional coordination time required for the project due to the number of contractors working in this area during the duration of the project. This task includes additional staff hours required to coordinate the work on the three projects being constructed in this area along with the multiple contractors completing work in the area. Task 10. This task includes additional construction staking required for the project.to verify and lay out the intricate colored portions of the Lower Plaza. Task 11. This task includes additional construction -review services required during the extended duration of the project, including on-site construction review, contract administration (contractor payroll reporting requirements, pay applications) and project meetings. InVision Architecture and Craig Ritland Landscape Architects (CRLA) will assist in this task. III. Compensation Compensation for the above services will be on an hourly basis in accordance with Part III of the original agreement. The fee for the services is estimated for the individual projects as follows and shall not be exceeded without the authorization of the Client: A. Additional Construction -Review Services for Materials Audit B. Additional Construction -Review Services for Project Reporting Requirements C. Additional Construction -Review Services for Lower Plaza Project $33,500.00 $11,500.00 $84,500.00 A=COM Page 5 The fee for Items A and B will be integrated with the fee authorized in Supplemental Agreement No. 12. The fee for Item C will be integrated with the fee authorized in Supplemental Agreement No. 10. IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated September 22, 2003; and subsequent amendments. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 16 as of the dates shown below: CITY OF W RLOO, IOWA By: Ernest G. Clark Mayor ATTEST: By: AECOM TECHNICAL SERVICES, INC. By Douglas W. - - indel, P.E. Sub -District Manager L:\work\ADMIN\AGREE\SUPPLE\SA16CV RiverRen AddtICRSServices.doc Date A/61 1 Date May 1, 2012