Loading...
HomeMy WebLinkAboutIowa Department of Transportation-5/7/2012 (3)Form 830240wd 04-08 Contract �1Iowa Department of Transportation Change Order s No. 1 Non -Substantial: Please return this copy to: City Clerk & Finance Department 715 Mulberry Street Waterloo, IA 50703 Non - Part 0 Part Substantial: 0 0 Accounting ID No.: 29528 County Black Hawk Concurrence Date Project No: STP -U-8155(711)-70-07 Kind of Work: PCC Paving Date Prepared: April 23, 2010 Contractor: Croell and Subsidiaries, Inc. You are hereby authorized to make the following changes to the contract documents. A - Description of change to be made or extra work to be done: 8001 - Removal of Field Tile - Remove field tile and recompact trench. 8002 -_8" Subdrain Plastic Pipe. 8 IN. - Place tile collection line to connect field tiles to RCP subdrain that will cross the Right of Way. The effect on Working Days is unknown at this time and will be addressed by a future Change Order. B — Reason for change or extra work: 8001 - Field tile lateral lines were found existing within the Right of Way. Work is to remove tile lines that were found to not have sub -standard pipe existing under the road. 8002 - Tile collection line to be put along the Right of Way and collect all tile lines were removed within the Right of Way and carry them to a concrete subdrain that will connect across the Right of Way. Approved (Continued Approved '� `-. 5/?18- District 1Z District Construction Engineer Date City of Waterloo Fa ' Project Engineer Receipt is acknowledged of this change or extra work and terms of settlement are hereby agreed to. Approved contingent upon funds being available under the existing project agreement or upon additional Federal -aid funds being made available by a modified project agreement. Date For the Division Administrator Federal Highway Administration 56 td.02— Date Date By Date Approved Assistant Construction Engineer Date DISTRIBUTION: Project Engineer — Forward original to District. District — Nonsubstantial — Forward original and ane Dopy to the Office of Construction and two copies bads to the Project Engineer. - Substantial - Forward original and two copies to the Office of Construction. C-1 —Settlement for cost of work to be made as follows: 8001 - 2900 LF x 5.00/LF = $14,500.00 8002 - 900 LF x 16.00/LF = $14,400.00 $14,500.00 + $14,400.00 + 10% = $31,790.00 Accounting ID No. 12 19 15 12 18 I I 1 2 3 4 5 6 Change Order No. 1 C-2 — Justification for cost(s) 8001 - Individual costs have been agreed to based on certified payroll expenses, and equipment rates justifiable by Rental Rate Blue Book values. A copy of the contractor invoice is filed with the project. 8002 & 8003 - Agreed price is comparable to other Awarded Contract Prices on DOT let projects for similar items. A copy of the contractor invoice is filed with the project. D - ITEMS INCLUDED IN CONTRACT If Credit Add "CR" Item Number Change No. Line Item Number Unit Price .xxx Quantity .xxx Amount .xx 7 2599- 9999009 $5.50 2900.00 7 8002 Subdrain Plastic Pipe, 8 IN. 2502- 8212108 7 900.00 $15,840.00 8 7 7 7 8 IOWA DEPARTMENT 7 8 TOTAL - ITEMS NOT INCLUDED IN CONTRACT If Credit, Add "CR" Change No. Item Description Item Number Function Code Unit Price .xxx Quantity .xxx Amount .xx 8001 Remove Field Tile 2599- 9999009 $5.50 2900.00 $15,950.00 8002 Subdrain Plastic Pipe, 8 IN. 2502- 8212108 $17.60 900.00 $15,840.00 8 8 8 IOWA DEPARTMENT 8 OF TRANSPOR I A t „ DISTRICT2 8 14AY 2 5 2012 MASON CITY, IH TOTAL $31,790.00