HomeMy WebLinkAboutIowa Department of Transportation-4/2/2012 (2)F; Ie : doF- Zoe
Iowa Department of Transportation
District 2, 1420 4th Street SE, Mason City, IA 50401-4438
June 12, 2012
641-423-7584 or 800-477-4368, Fax 641-423-0246
Ref: Project No.: UST -8155(730)--4A-07
Agreement No.: 02-12-USTEP-013
Susan Schares, City Clerk
City of Waterloo
715 Mulberry Street
Waterloo, IA 50703-5783
\
PECEIVED
CIN ENGINEERS
Dear Ms. Schares:
Enclosed please find the executed agreement for the above referenced project.
If I can be of further assistance, please feel free to call me at 641-423-7584.
Sincerely,
Willie Clyde Moh ne, Jr.
Engineering Tec Sr.
WCM:ac
Enclosure
Cc: Kevin Galloway, Finance Agreement
Doc Services, Records Management
File
IOWA DEPARTMENT OF TRANSPORTATION
AGREEMENT FOR
URBAN -STATE TRAFFIC ENGINEERING PROGRAM
(U -STEP) PROJECT
City: Waterloo TOP ®/
Project No.: UST -8155(730)--4A-07
Iowa Department of Transportation
Agreement No.: 02-12-USTEP-013
Staff Action No.: 12-0722
This is an agreement between the city of Waterloo, (hereinafter called Recipient) and the Iowa
Department of Transportation (hereinafter called Department) to enter into an agreement for joint or
cooperative action after appropriate action by ordinance, resolution, or otherwise pursuant to the laws of
the governing bodies involved.
The Department provides funds through the Urban -State Traffic Engineering Program (U -STEP), a
cooperative program for safety or operational improvements on primary road extensions. The
Department has made these funds available for reimbursement and will share eligible construction and
right-of-way costs in the ratio of 55% Department funds to 45% local funds, up to a maximum amount in
Department funds of $200,000 for a "spot improvement" or $400,000 for a linear improvement".
A "spot improvement" shall mean a limited improvement project such as intersection reconstruction or
signalization; and a "linear improvement" shall mean an improvement project such as street or highway
widening or reconstruction which spans two or more intersections.
The Recipient proposes to develop and complete the following described spot improvement project:
Advanced Waming Flashers (AWF) will be installed with "Prepare To Stop When Flashing" sign on
southbound US 63 in advance of this intersection. These amber flashing beacons will be interconnected
with the traffic signals and will be programmed to provide a leading flash period, along with flashing
through the signal's yellow change interval and red clearance interval.
Pursuant to the terms of this agreement, applicable statutes, and Administrative Rules, the Department
agrees to provide U -STEP funding to the Recipient for the authorized and approved costs for eligible
items associated with project improvements as described above.
In consideration of the foregoing and the mutual promises contained in this agreement, the parties agree
as follows:
1 The Recipient shall be the lead local governmental agency for carrying out the provisions of this
agreement and shall be responsible for the development and completion of the U -STEP project.
2. All notices required under this agreement shall be made in writing to the Department and the
Recipient's contact person. The Department's contact person shall be the District 2 Local
Systems Engineer. The Recipients contact person shall be the City Traffic Engineer.
The estimated total of eligible construction and right-of-way cost for this project is $29,315.58. If,
upon completion of final plans, the Recipient's cost estimate exceeds the preliminary total
estimate contained herein by 20% or more, the increased cost must be approved by the
Department prior to advertisement for bids. Extra work, requested subsequent to the contract
letting, must also be approved by the Department prior to commencement of the extra work.
U -STEP Agreement
Page 2
4. If any part of this agreement is found to be void and unenforceable, then the remaining provisions
of this agreement shall remain in effect.
5. This agreement is not assignable without the prior written consent of the Department.
6. This agreement, and the attached Exhibit A and Exhibit B, constitutes the entire agreement
between the Department and the Recipient. No representations, promises, or warranties have
been made by either party that is not fully expressed in this agreement. Any change or alteration
to the terms of this agreement must be made in the form of an addendum to this agreement
which shall be effective only upon written approval of the Department and the Recipient.
IN WITNESS WHEREOF, each of the parties hereto has executed this Agreement as of the date shown
opposite its signature below:
Titlear#7
I, grZ gtiktkii•-e S , certify that I am the Clerk of the city of
Waterloo, and that 6. Uk, who signed said
Date
e-4 ,®20/z
Agreement for and on behalf of the Recipient was duly authorized to execute the same by
virtue of a formal resolution duly passed and adopted by the Recipient, on the _day
of
1(g
Signed:
City Clerk of Waterloo, Iowa
IOWA DEPARTMENT OF TRANSPORTATION
Highway Division
By:
Robert A. Welper, • .E.
Local Systems Engineer
District 2
Date ALA v
Date Nh,v46 8
6f7/2___
March 2012
EXHIBIT A
Standard Provisions for U -STEP or C -STEP Project Agreements
1. In accordance with Iowa Code Chapter 216, the Recipient shall not discriminate against any
person on the basis of race, color, creed, age, sex, sexual orientation, gender identity, national
origin, religion, pregnancy, or disability.
2. The project plans, specifications, and engineer's cost estimate for the project shall be prepared
and certified by a registered Professional Engineer licensed in the State of Iowa. The Recipient
shall submit the plans, specifications, and other contract documents to the Department for review
and approval. If the project will be let by the Department, the most recent edition of the Iowa DOT
Standard Specifications for Highway and Bridge Construction shall be used. The Recipient shall
also follow the Department's letting procedures. If the project will be let by the Recipient, the
project may utilize the Iowa DOT Standard Specifications for Highway and Bridge Construction,
the Urban Standard Specifications for Public Improvements, or specifications developed by the
Recipient.
3. The Recipient shall use positive efforts to solicit bids from and to utilize Targeted Small Business
(TSB) enterprises as contractors and ensure that the contractors make positive efforts to utilize
these enterprises as subcontractors, suppliers, or participants in the work covered by this
agreement. Efforts shall be made and documented in accordance with Exhibit B.
4. The Recipient shall obtain agreements, as needed, from railroad and utility companies and shall
obtain project permits and approvals, when necessary, from the Iowa Department of Cultural
Affairs (State Historical Society of Iowa; State Historic Preservation Officer), Iowa Department of
Natural Resources, U.S. Coast Guard, U.S. Army Corps of Engineers, etc.
5. If right-of-way must be acquired for the project, the Recipient shall negotiate and secure the
necessary right-of-way using the most appropriate of the following methods:
A. When right-of-way is to be acquired, before acquisition procedures are begun, the
Recipient shall meet staff from the Departments Office of Right of Way (ROW) to assure
compliance with the U.S. Code, the Iowa Code, and 761 Iowa Administrative Code (IAC)
Chapter 111; and determine what parcels, if any, are to be acquired in the name of the
Department and what parcels, if any, in the name of the Recipient.
B. Should eminent domain proceedings be required, the Recipient will condemn or appeal in
the name of the Recipient or the Department, whichever applies. The project letting may
not be held until the Recipient has certified that the right-of-way has been acquired.
Upon completion of the acquisition for each parcel, all original documents for the
acquisition shall be delivered to and become the property of the Department.
C. The Recipient will meet with the Department's Office of Right of Way staff to determine
who shall be responsible for demolition and/or property management functions.
D. In accordance with 761 IAC Section 150.3(1)(b), the Recipient will be responsible for
providing, without cost to the Department or the project, all right-of-way which involves
dedicated streets or alleys, and other Recipient -owned lands, easements, and rights in
land except park lands, subject to the condition that the Department will reimburse the
Recipient for the value of improvements situated on said Recipient -owned lands if any.
The Recipient has apprised itself of the value of these lands and, as a portion of its
participation in the project, voluntarily agrees to make such lands available without further
compensation.
6. The Recipient as well as its contractors, if any, agree to maintain all books, documents, papers,
accounting records, and other evidence pertaining to all costs incurred under this Agreement and
to make such materials available at their respective offices at reasonable times during the
Agreement period and for 3 years from the date of the final payment under the Agreement, for
inspection by the Department.
Exhibit A
Page 2
7. The Recipient shall be responsible for obtaining all applicable permits from the Department, such
as the Right to Occupy and/or Perform Work Within the Department's Right -of -Way, Permit of
Access , Utility Accommodation, Right to Install and Maintain Traffic Control Devices, and/or other
construction permits required for the project prior to advertisement for bids.
8 For projects let by the Department, the Recipient shall submit to the District an acceptable Project
Development Certificate (Form 730002), plans, specifications, and cost estimate by the dates
specified in the most current edition of Instructional Memorandum (I.M.) 3.005, Project
Development Submittal Dates and Information. The Recipient shall also follow the Department's
letting procedures. For projects let by the Recipient, the Project Development Certificate, plans,
specifications, and cost estimate shall be submitted to the District at least 4 weeks prior to
advertisement for bids.
9. Upon Department acceptance of the Project Development Certificate, final plans, proposal forms,
specifications, and cost estimate, the Department will give the Recipient a written notice to
proceed with the project. If the project will be let by the Recipient, advertisement for bids shall not
be made until a written notice to proceed is received from the Department. After receiving the
Department's approval, the Recipient shall advertise for bidders, hold a public letting, and provide
adequate supervision for the construction work performed under the contract. The Recipient shall
submit 2 copies of the bid tabulations and the letting documents to the Department for
concurrence prior to formal action in the award of the contract.
10 If the Recipient lets the project, as described herein, the Recipient shall include in their Notice to
Bidders that Sales Tax Exemption Certificates will be issued, as provided for by Iowa Code
section 423.3, subsection 80. The Recipient shall be responsible for obtaining the sales tax
exemption certificates through the Iowa Department of Revenue and Finance. The Recipient
shall issue these certificates to the successful bidder and any subcontractors to enable them to
purchase qualifying materials for the project free of sales tax.
11. The project must be let to contract within 2 years of the date this agreement is approved by the
Department. If not, the Recipient may be in default, for which the Department may revoke funding
commitments. This agreement may be extended for a period of 6 months upon receipt of a
written request from the Recipient at least 30 days prior to the 2 year deadline.
12. The Recipient will be responsible for the initial costs of the construction. The Recipient shall
prepare and submit to the Department a detailed billing statement of materials, installation, and
construction costs incurred by the Recipient. Billing statements may be submitted periodically
during progress of the work. Design, inspection, and administration costs will be the
responsibility of the Recipient. If said statement and documentation are in proper form, the
Department will promptly reimburse the Recipient for eligible project costs, less a withholding
equal to 5% of the State share of construction costs, taking into account the limitations as stated
in the agreement. If, upon final audit or review, the Department determines the Recipient has
been overpaid, the Recipient shall reimburse the overpaid amount to the Department. After the
final audit or review is complete and after the Recipient has provided all required paperwork, the
Department will release the State funds withheld.
13. Signs and other traffic control devices necessary for construction of the project shall be in
accordance with the Manual on Uniform Traffic Control Devices for Streets and Highways
(MUTCD) per 761 IAC Chapter 130. The safety of the general public shall be assured through
the use of proper protective measures and devices such as fences, barricades, signs, flood
lighting, and warning lights as necessary.
14. If a detour is necessary, the Recipient will designate and sign the route at no cost to the project.
The Department will cooperate if primary highways are involved.
15. Parking shall be prohibited on the minor street approaches for a distance of 35 feet in advance of
the stop signs and/or crosswalks and on the exit sides of the minor streets for a distance of 35
feet beyond the stop signs and/or crosswalks. These parking restrictions shall go into effect at
such time as the project is completed and opened to through traffic.
April 2010
EXHIBIT B
UTILIZATION OF TARGETED SMALL BUSINESS (TSB) ENTERPRISES
ON NON-FEDERAL AID PROJECTS
(THIRD -PARTY STATE -ASSISTED PROJECTS)
In accordance with Iowa Code Section 19B.7 and 541 Iowa Administrative Code (IAC) Chapter 4, it is the policy of the
Iowa Department of Transportation (Iowa DOT) that Targeted Small Business (TSB) enterprises shall have the maximum
practicable opportunity to participate in the performance of contracts financed in whole or part with State funds.
Under this policy the Recipient shall be responsible to make a positive effort to solicit bids or proposals from TSB firms
and to utilize TSB firms as contractors or consultants. The Recipient shall also ensure that the contractors or consultants
make positive efforts to utilize TSB firms as subcontractors, subconsultants, suppliers, or participants in the work covered
by this agreement.
The Recipient's "positive efforts" shall include, but not be limited to:
Obtaining the names of qualified TSB firms from the Iowa Department of Inspections and Appeals (515-281-7102)
or from its website at: http.//dia.iowa.gov/paoe7.html.
2. Notifying qualified TSB firms of proposed projects involving State funding. Notification should be made in
sufficient time to allow the TSB firms to participate effectively in the bidding or request for proposal (RFP)
process.
Soliciting bids or proposals from qualified TSB firms on each project, and identifying for TSB firms the availability
of subcontract work.
4. Considering establishment of a percentage goal for TSB participation in each contract that is a part of this project
and for which State funds will be used. Contract goals may vary depending on the type of project, the
subcontracting opportunities available, the type of service or supplies needed for the project, and the availability
of qualified TSB firms in the area.
5. For construction contracts:
a. Including in the bid proposals a contract provision titled "TSB Affirmative Action Responsibilities on Non -
Federal Aid Projects (Third -Party State -Assisted Projects)" or a similar document developed by the Recipient.
This contract provision is available on-line at:
http://www.dot.state.ia. us/local_systems/publications/tsb_contract provision.pdf
b. Ensuring that the awarded contractor has and shall follow the contract provisions.
6. For consultant contracts:
a. Identifying the TSB goal in the Request for Proposal (RFP), if one has been set.
b. Ensuring that the selected consultant made a positive effort to meet the established TSB goal, if any. This
should include obtaining documentation from the consultant that includes a list of TSB firms contacted; a list
of TSB firms that responded with a subcontract proposal; and, if the consultant does not propose to use a
TSB firm that submitted a subcontract proposal, an explanation why such a TSB firm will not be used.
The Recipient shall provide the Iowa DOT the following documentation:
1. Copies of correspondence and replies, and written notes of personal and/or telephone contacts with any TSB
firms. Such documentation can be used to demonstrate the Recipient's positive efforts and it should be placed in
the general project file.
2. Bidding proposals or RFPs noting established TSB goals, if any.
3. The attached "Checklist and Certification." This form shall be filled out upon completion of each project and
forwarded to: Iowa Department of Transportation, EEO Administrator, Office of Contracts, 800 Lincoln Way,
Ames, IA 50010.
Exhibit A
Page 3
16. Upon completion -of the project, the Recipient's engineer will certify that the project was
completed in substantial compliance with the plans and specifications set out in this agreement
before receiving final reimbursement of Department funds.
17. The Recipient shall provide to the Department 3 copies of the "as -built' project plans, within 6
months after the project is built.
18. The Recipient shall have ownership of traffic signals constructed with this project and shall
operate them at its expense so long as signal protection is considered by either party as
necessary at said location. If considered by both parties as no longer necessary at said location,
the signals are to be removed by the Recipient at the Recipients expense, and may be installed
at another location acceptable to both parties and shall be owned and operated at the expense of
the Recipient.
19 The Recipient shall submit a final detailed billing statement to the Department no later than 1 year
after the date the Department concurs in the acceptance of the completed construction. If a final
detailed billing statement is not submitted to the Department by the Recipient in the 1 year period,
the Department will close the project's financial records without making additional reimbursement
to the Recipient unless a time extension is requested. The time extension should be requested in
writing by the Recipient and approved by the Department, at least 30 days prior to the 1 year
deadline.
20 The Recipient agrees to indemnify, defend, and to hold the Department harmless from any action
or liability arising out of the design, construction, maintenance, placement of traffic control
devices, inspection, or use of this project. This agreement to indemnify, defend, and hold
harmless applies to all aspects of the Department's application review and approval process, plan
and construction reviews, and funding participation.
21. In case of dispute concerning the terms of this agreement, the parties shall submit the matter to
arbitration pursuant to Iowa Code Chapter 679A. Either party has the right to submit the matter to
arbitration after 10 days notice to the other party of their intent to seek arbitration. The written
notice must include a precise statement of the dispute. The Department and the Recipient agree
to be bound by the decision of the appointed arbitrator. Neither party may seek any remedy with
the State or Federal courts absent exhaustion of the provisions of this paragraph for arbitration.