HomeMy WebLinkAboutAdvanced Enviromental-4/9/2012Proposal
Proposal Submitted To:
City of Waterloo
Attn: Chris Western
715 Mulberry Street
Waterloo, IA 50703
Project & Address:
Asbestos Removal
Old Happy Chef Restaurant
218 West MuIlan
Waterloo, IA
Phone: 319-291-4366 Date: 03/29/2012
Fax: 319-291-4262
jfiqb-oa-
(E
NIAINffAO '..14&..N IN A LJ
803 Ricker St.
Waterloo, IA 50703
Phone: 319-287-4447
Fax: 319-287-4449 (FAX)
We hereby propose to furnish all the materials, equipment and perform all labor for the completion of:
removal & disposal of all the acm listed in the asbestos inspection report from ATC. It
includes the flashing over the trash room, tar on roof penetrations, and HVAC
dampener material on the HVAC connections.
Proposal Includes: (1) daily OSHA required personal & excursion air monitoring.
State of Iowa requires a ten (10) working day notification by the contractor prior to
commencement of work.
WE PROPOSE to furnish material and labor, complete in accordance with the above specifications for the
sum of: Eight Hundred Eighty Dollars ($ 880.00*)
Terms: Net 30 Daysl All accounts subject to 1.5% monthly charge after 30 dans.
All work is guaranteed to be as specified. All work to be completed in a workmanlike manner
according to specified practices. Any alteration or deviation from the above specifications
Involving extra costs will be executed only upon written orders and wit become an extra charge
above the estimate. All agreements contingent upon strikes, accidents or delays beyond our
control. Owner to carry fire, tornado, and other necessary insurance. We carry general liability
insurance and our workers are fully covered by workers compensation insurance.
NOTE: This proposal may be withdrawn by us if not
accepted within 30 days.
Respectfully Submitted,
ADVANCED ENVIRONMENTAL
T STING AND ABATEMENT, INC.
ACCEPTANCE O,' ROPOSAL The pri es, specifications and condi
You are authd to do the work
Signature:
Name & Title (PRINT): `1A.15f U -
y Llewellyn
ons -ire satis a' tory and are hereby accepted.
ec4ed. Payment(s) will be m
Date:
y
e as outlined above.
It ho IN 1 3--