Loading...
HomeMy WebLinkAboutAdvanced Enviromental-4/9/2012Proposal Proposal Submitted To: City of Waterloo Attn: Chris Western 715 Mulberry Street Waterloo, IA 50703 Project & Address: Asbestos Removal Old Happy Chef Restaurant 218 West MuIlan Waterloo, IA Phone: 319-291-4366 Date: 03/29/2012 Fax: 319-291-4262 jfiqb-oa- (E NIAINffAO '..14&..N IN A LJ 803 Ricker St. Waterloo, IA 50703 Phone: 319-287-4447 Fax: 319-287-4449 (FAX) We hereby propose to furnish all the materials, equipment and perform all labor for the completion of: removal & disposal of all the acm listed in the asbestos inspection report from ATC. It includes the flashing over the trash room, tar on roof penetrations, and HVAC dampener material on the HVAC connections. Proposal Includes: (1) daily OSHA required personal & excursion air monitoring. State of Iowa requires a ten (10) working day notification by the contractor prior to commencement of work. WE PROPOSE to furnish material and labor, complete in accordance with the above specifications for the sum of: Eight Hundred Eighty Dollars ($ 880.00*) Terms: Net 30 Daysl All accounts subject to 1.5% monthly charge after 30 dans. All work is guaranteed to be as specified. All work to be completed in a workmanlike manner according to specified practices. Any alteration or deviation from the above specifications Involving extra costs will be executed only upon written orders and wit become an extra charge above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado, and other necessary insurance. We carry general liability insurance and our workers are fully covered by workers compensation insurance. NOTE: This proposal may be withdrawn by us if not accepted within 30 days. Respectfully Submitted, ADVANCED ENVIRONMENTAL T STING AND ABATEMENT, INC. ACCEPTANCE O,' ROPOSAL The pri es, specifications and condi You are authd to do the work Signature: Name & Title (PRINT): `1A.15f U - y Llewellyn ons -ire satis a' tory and are hereby accepted. ec4ed. Payment(s) will be m Date: y e as outlined above. It ho IN 1 3--