HomeMy WebLinkAboutRadio Communications Co./RCSystems-2/27/2012IV- FORM OF CONTRACT
SAN MARNAN TRAFFIC VIDEO MONITORING SYSTEM
FORM OF CONTRACT
CITY OF WATERLOO, IOWA
This contract made and entered into this
1 C `.day of C , 2012, by and
between the City of Waterloo, Iowa, a Municipal Corporation, (hereinafter referred to
as City), and Radio Communications Co./RCSvstems , of
Waterloo , Iowa hereinafter referred to as Contractor),
WITNESSETH:
PAR. 1
PAR. 2
PAR. 3
Contractor agrees to design and build SAN MARNAN TRAFFIC VIDEO
MONITORING SYSTEM, and furnish all necessary tools, equipment,
materials., and labor necessary to do all the work to deliver a fully
functional video monitoring system consisting of pan tilt zoom cameras,
radio communications, and all the necessary connections to Traffic
Operation center as per contract specifications and performing
everything necessary in a workmanshiplike manner and for the prices
set forth in Contractor's proposal, which was accepted by the City, and
which is understood and agreed to be a part of this contract.
It is understood and agreed that the resolution adopted by the City
Council ordering approving the contract, the Notice to Bidders as
published, the Form of Proposal, the Construction Bonds, the Council
Proceedings relating to this matter, and the Specifications shall all be
considered as forming a part of the contract the same as though they
were each set out in said contract.
The Contractor agrees to furnish at its own cost and expense, all
necessary materials and labor for said work and to construct said
improvements in a thorough, substantial, and workmanlike manner, and
in strict accordance with the requirements of this contract, and of the
plans and specifications made a part hereof by reference, and to the
satisfaction and approval of the City and its Traffic Operations
Department.
PAR. 4 The Contractor agrees to perform said work and install said
improvements on the terms set out in bid or proposal to the City which
FORM OF CONTRACT PAGE 1
PAR. 5
PAR. 6
PAR. 7
PAR. 8
PAR. 9
PAR. 10
has been accepted by the City and which is by reference made a part of
this contract.
The Contractor agrees to commence said work within ten (10) working
days after receipt of "Notice to Proceed" and complete it on or before
sixty working days from the date of Notice to Proceed and any
extension of time that is granted by the City.
Should the Contractor fail to complete said improvements in strict
accordance with the terms and conditions of this contract, or the plans
and specifications therefor promptly by the date herein specified, the
City may pay such additional sums as it may be required to pay by
reason of the failure of said contractor and deduct any and all such
sums from any amount then due the Contractor.
The Contractor agrees to comply with and obey all ordinances of the
City of Waterloo, Iowa, relating to the obstruction of streets and alleys,
keeping open passage ways for water, traffic, and protecting any
excavations in any street or alley, and maintaining proper and sufficient
barricades with lights and signals during all hours of darkness, to see
that the backfilling is properly done, and agrees to keep the City whole
and defend any and all suits that may be brought against the City by
reason of any injuries that may be sustained by any person or property
allegedly caused by the Contractor, or his agents, while work is done
pursuant to this agreement.
The Contractor agrees that in the event a law suit is brought against the
City for damages allegedly sustained by reason of any act, omission or
negligence of the Contractor or its agents, or on account of any injuries
allegedly sustained by reason of any obstruction, hole, depression or
barrier placed or dug by the defendant or its agents, in the doing of the
work herein contracted for, that it will defend said suit and save the City
harmless therein, and in case judgment is rendered against the City, the
Contractor agrees to pay the same promptly. The Contractor agrees to
carry public liability insurance in a solvent company in a sufficient
amount to protect the City and those who use the streets of the City.
The Contractor shall maintain no cause of action against the City on
account of delays and prosecution of work, but if said work is delayed by
the City, the Contractor shall have such extra time for completion of the
job as was lost by reason of the delay caused by the City.
The Contractor agrees to pay punctually all just claims of labor, material,
men, or subcontractors who shall perform labor or furnish materials
entering into this improvement. It is agreed that the City need not pay
the Contractor until all such claims are paid by the Contractor. It is
FORM OF CONTRACT PAGE 2
PAR. 11
PAR. 12
PAR. 13
PAR. 14
PAR. 15
PAR. 16
agreed that the City shall not be liable for said labor, material, or men
under this contract.
The Contractor agrees to furnish the City, simultaneously with this
contract, a bond on a form to be provided by the City in the amount
provided by law as stated in the Notice to Bidders, which shall be for the
benefit of the City, and any and all persons injured by the breach of any
of the terms of this contract. Said bond shall be filed with the City Clerk
and shall be subject to the approval of the City Council, and is by
reference made a part of this contract.
The Contractor agrees that should it abandon work under this contract
or cease the prosecution thereof for a period of thirty (30) consecutive
days without reasonable cause, and should it fail to proceed with said
work within ten (10) days after a notice to continue or carry it on has
been mailed to it at the address given herein by the City, or after such
notice has been served on it, then the City may proceed to complete
said work, using any material, tools, or machinery found along said line
of work, doing the work either by contract or as it may elect, and the
Contractor and the sureties on its bond shall be liable to the City for the
costs and expenses so paid out. Said costs shall be retained by the City
from any compensation due, or to become due the Contractor, and may
be recovered by the City in an action upon Contractor's bond.
In consideration of the full compliance on the part of the Contractor with
all the provisions, stipulations, and conditions hereof, or contained in the
various instruments made a part of this contract by reference, and upon
completion and acceptance of said work, the City agrees to pay to the
Contractor, in the manner set out in the Notice to Contractors, the
amount of money due the Contractor for work performed and accepted,
at the unit prices set out in the Contractor's proposal, which has been
accepted by the City.
The total amount of the contract, based on the Contractor bid price and
for which 100% bond to assure faithful performance of the contract is
required, is $ 37,709.00 .
After the completion of said work, the Contractor agrees to remove all
debris and clean up said streets, and to save the City harmless from any
damage allegedly resulting from a failure to clean up and remove the
debris or put the street back in a proper condition for travel.
This contract is not divisible, but in the event of a conflict between this
contract and the various instruments incorporated by reference, this
contract shall govern.
FORM OF CONTRACT PAGE 3
PAR. 17
Should the system fail within the warranty period the Contractor shall
correct the failure and deliver a working system. In the event of the
failure or default of the Contractor to remedy any or all system failures
due to defects in said work within the warranty period and starting from
the date of its acceptance by said Council, and after having been given
ten (10) days notice so to do by registered letter deposited in the United
States Post Office in said town, addressed to said contractor at the
address herein given, then the City may proceed to remedy such
defects. The costs and expenses thereof to shall be the Contractor
responsibility.
CITY P T WATERLOO, IOWA
Mayor
City C el@Trc
RadioCommunicationsCo./RCSystems
Contractor
David F. Burger
BY:
Title:
General Manager
Approved by the City Council of the City of Waterloo, Iowa, this A
day of \—,0�9+rok , 20 a
ATTEST`
, City Clerk
FORM OF CONTRACT
, City Clerk
Waterloo, Iowa
PAGE 4