Loading...
HomeMy WebLinkAboutFailor Hurley Construction-1/30/2012$AIA��e°o Tin Document G704 — 2000 Certificate of Substantial Completion PROJECT: PROJECT NUMBER: 11050/ (Name and address) CONTRACT FOR: General Construction 11050 Public Market Interior CONTRACT DATE: July 22, 2011 Developmen - General Construction BP2 TO OWNER: (Name and address) City of Waterloo City Hall 715 Mulberry Street Waterloo, Iowa 50703 TO CONTRACTOR: (Name and address) Failor Hurley Construction PO Box 446 Hudson, IA 50643 OWNER: El ARCHITECT: ❑ CONTRACTOR: ❑ FIELD: D OTHER: ❑ PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: Warranty INVISION Architecture ARCHITECT BY Date of Commencement • 10/6/1411 DATE OF ISSUANCE A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective: $0.00 The Contractor will complete or correct the Work on the list of items attached hereto within Zero (0) days from the above date of Substantial Completion. Failor Hurley Construction CONTRACTOR BY The Owner accepts the Work or designated portion ; substantially complete and September 26, 2011 (date). City of Waterloo OWNER BYysi-. DATE /oAbf 1 assume full possession at 5:00 pm (time) on DATE a�?�o�2ora— The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: (Note: Owner 's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) AIA Document G7041' — 2000. Copyright ® 1963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:45:46 on 10/05/2011 under Order No.5896542442_1 which expires on 07/19/2012, and is not for resale. User Notes: (1834625865)