Loading...
HomeMy WebLinkAboutFrickson Backhoe and Trucking-1/30/2012AGREEMENT FOR DEMOLITION AND SITE CLEARANCE GROUP 174-D-NSP3-01-09-12 THIS AGREEMENT made this 23rd day of January, 2012, by and between R COMPANY dba FRICKSON BACKHOE AND TRUCKING, a corporation organized and existing under the laws of the State of Iowa, hereinafter called the "CONTRACTOR", and the CITY OF WA i'ERLOO, IOWA, hereinafter called the "CITY". WITNESSETH, that the Contractor and the City for the consideration stated herein mutually agree as follows: ARTICLE 1. STATEMENT OF WORK. The Contractor shall furnish all supervision, technical personnel, labor, materials, machinery, services, and perform and substantially complete all work within 45 days after receipt of Notice to Proceed, all work required for the Demolition and Site Clearance in an efficient and workmanlike manner as follows: DEMOLITION OF BUILDINGS ON, AND CLEARANCE OF SITES of all parcels as enumerated in Bid Schedule attached to and forming a part of this Contract, within the City of Waterloo Demolition Project 174-D- NSP3-01-09-12 all in strict accordance with the Contract Documents for Demolition and Site Clearance including all Addenda thereto, Numbered and Dated Numbered and Dated ARTICLE 2. THE CONTRACT PRICE. The Local Public Agency will pay the Contractor for the performance of the Contract in current funds, subject to additions and deductions as provided in the Section "Changes in the Work" under General Conditions, Part I, and subject to all other conditions set forth in the Contract Documents, the sum of TWENTY-EIGHT THOUSAND, SEVEN HUNDRED AND NO/100 Dollars ($28,700.00), in addition to and above the value of such salvaged materials specified to become the property of the Contractor, and in accordance with the contractor's bid. ARTICLE 3. CONTRACT. The executed Contract Documents shall consist of the following: a. This Agreement b. Addenda c. Invitation to Bid d. Instructions to Bidders e. Signed copy of Bid f. General Conditions Part I, II, and III g. Special Conditions h. Technical Specifications i. Drawings as listed in the Schedule of Drawings AGR -1 THIS AGREEMENT, together with the other documents enumerated in this Article 3, which said other documents are as fully a part of the Contract as if hereto attached or herein repeated, forms the Contract between the parties hereto. In the event that any provision in any component part of this Contract conflicts with any provisions of any other component part, the provision of the component part first enumerated in this Article 3 shall govern, except as otherwise specifically stated. NOTICE TO PROCEED. After execution of the Agreement, a Notice to Proceed will be issued to the contractor, whereupon the contractor shall proceed with his/her work in accordance with the Contract time established in the Pre -Construction Meeting. ARTICLE 4. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed in three (3) original copies on the day and year first above written. Contractor Name R Company dba Frickson Backhoe & Trucking 911 Central Avenue Evansdale, Iowa 50707 ATTEST: (for individual or partnership) By: By: Rodney Frickson, President CITY OF WATERLOO By: (nest G. Clark, Mayor ATTEST: By; Suzy Sc ares, City Clerk AGR -2 CITY OF WATERLOO DEMOLITION PROGRAM BASE BID STREET ADDRESS ITEMIZED UNIT PRICE SCHEDULE GROUP NO. 174-D-NSP3-01-09-12 MAIN BUILDING STORY HGT. & TYPE BASEMENT OTHER NET BUILDINGS BID PRICE 915 Lafayette Street 2 Story Townhouse (772 SF) Full "0" Finished Area None $4,500.00 Include Tree Removal 917 Lafayette Street 2 Story Townhouse (772 SF) Full "0" Finished Area None $4,500.00 Include Tree Removal 919 Lafayette Street 2 Story Frame (772 SF) Two Family Conversion Include Tree Removal Full "0" Finished Area None $4,500.00 927 Lafayette Street 2 Story (672 SF) Single Family Include Tree Removal Full "0" Finished Area None $6,000.00 1021 Lafayette Street 2 Story Frame (728 SF) Single Family Include Tree Removal Full "0" Finished Area None $9,200.00 BASE BID TOTAL $ 28,700.00 BF -4 (1)