Loading...
HomeMy WebLinkAboutIowa Department of Transportation-1/30/2012Form 33U240wd TOO �` , Iowa Department of Transporta non �T Non - Change Order Part Part Non -Substantial: ❑ 0 No. 5 Substantial: ® 0 01 / 24111 Contract Accounting ID No.: N/A (Project Locally Let) County Black Hawk Concurrence Date Project No: NRT-NT08(1)-9G-07 Kind of Work: P.C.C. Trail Date Prepared: 01-23-12 Contractor. Vieth Construction Corporation You are hereby authorized to make the following changes to the contract documents. A - Description of change to be made or extra work to be done: 8013 - Wall Removal and Replacement 8 - Reason for change or extra work: The existing wall and trail adjacent to the 7th Street Pump Station which was shown in the plans to leave in place was determined to be unsafe, and in need of removal and replacement. This change order includes the removal of the existing wall, construction of new wall, and construction of new trail on this section of the portage. (Continued on reverse side) Approved Director, Office of Systems Planning ty of Waterloo, IA Date Project Engineer Receipt is acknowledged of this change or extra work and terms of settlement are hereby agreed to. Approved contingent upon funds being available under the existing I.%/G %if f'o Date project agreement or upon additional Federal -aid funds being Contractor made available by a modified project agreement. ,/ / By /2 /e./ -4:s, Date For the Division Administrator Federal Highway Administration Approved / 72-0 C Date Assistant Construction Engineer Date DISTRIBUTION: Project Engineer- Forward original to District. District - Nonsubstantiit- Ford original and one copy to the Office of Constndon and two copies bads to the Project Engineer. - Substantial - Forward original and two copies to the Office of Construction. CA —Settlement for cost of work to be made as follows: 8013 — Contractor will be paid a lump sum price of $34.595 C-2 — Justification for cost(s) 8013 — Cost breakdown provided by contractor as follows: Accounting ID No. I I I I I (Project Locally Let) Change Order No. 5 55 additional working days will be added to contract for this work. This change order significantly changes the scope of the work. In addition, the site conditions (building in the Cedar River), have not allowed a typical construction sequencing for the original scope of work, and have necessitated the addition of additional working days. D — ITEMS INCLUDED IN CONTRACT If Credit Add "CR" Change No. Line Item Number Unit Price .xxx Quantity .xxx Amount .xx 7 E — ITEMS NOT INCLUDED IN CO TOTAL If Credit, Change No. Item Description Item Number Function Code Semi -Tractor and Lowboy 15 hrs $125 $1,875 Sawcut Existing wall 50 If $48 $2,400 Break Existing Wall CAT 315 and CAT H115 6 hrs ($185 + $85) $1,620 Cleanup Concrete CAT 315 2 hrs $185 $370 Dump Truck for Concrete 2 hrs $95 $180 Class 20 Exc. Cat 315 5 hrs $185 $925 Dump Truck for Class 20 3 hrs $95 $285 Supervisor/Pickup 12 hrs $65 $750 Sandbags at Pump Station 25 ea $10 $250 6" Thompson Water Pump 8 hrs $110 $880 General Laborer 16 hrs $45 $780 Re -Bar 1500 Ibs $2.50 $3,750 3/4" Dowels 50 EA $11 $550 Structural Concrete 16 CY $1250 $20,000 TOTAL $34,615 Accounting ID No. I I I I I (Project Locally Let) Change Order No. 5 55 additional working days will be added to contract for this work. This change order significantly changes the scope of the work. In addition, the site conditions (building in the Cedar River), have not allowed a typical construction sequencing for the original scope of work, and have necessitated the addition of additional working days. D — ITEMS INCLUDED IN CONTRACT If Credit Add "CR" Change No. Line Item Number Unit Price .xxx Quantity .xxx Amount .xx 7 E — ITEMS NOT INCLUDED IN CO TOTAL If Credit, Change No. Item Description Item Number Function Code Unit Price .xxx Quantity .xxx Amount .xx 8013 Wall Removal and Replacement 41 , 410 1.00 34,615.00 34,615.00 TOTAL 34,615.00