Loading...
HomeMy WebLinkAboutInVision Architecture-1/9/2012Project: Project Number: Owner. Owner Contact: Contractor: Contractor Contact: Contract Date: PROPOSAL REQUEST WCA Window Replacement 11014 City of Waterloo Craig Clark Don Gardner Construction Mark Gardner 08/12/11 PR #: Date: Description: 01 12/14/11 Replace (2) sets of double doors & hardware on south end of Longfellow Concourse Please submit an itemized quotation for changes in the contract sum and/or time incidental to proposed modifications to the contract documents described herein. THIS IS NOT A CHANGE ORDER OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Description: Provide pricing to replace the (2) sets of double doors (4 total door leaves) located on the south end of Longfellow Concourse Gallery. The existing doors are a narrow style 3'-0° x 7'-0° hollow metal w/ glass infill. The new doors shall be as follows: • 3'-0' x 7'-0° Hollow Metal o Side rails: 4 inch o Top Rail: 6 inch o Bottom Rail: 12 Inch o Paint to match existing adjacent doors & frames • Door Glazing: 1/4° Tempered • Door Hardware: Item Quantity (per pair of double doors) Manufacturer Description Finish Hinges 6 Ives 5BB1 4.5x4.5 US32D Exit Device 1 Von Duprin 9847L x 992L (No bottom rod) US32D Exit Device 1 Von Duprin 9847L x 992L -DT (No bottom rod) US32D Cylinder 1 Falcon 951 US26D Top Strike 2 Von Duprin 338 US32D Closer 2 LCN 4011(H) w/ Overhead Stop US27 Kick Plates 2 Ives 8400 10° x 34° US32D Silencers 6 Please also provide pricing to paint the existing storefront framing to match existing adjacent doors and frames. N h 3 / m O er, ° s r, 5•t G E . Net amount of this Proposed Change (Add) (Deduct) (No Change) Net Change in Working Days Due to this Proposed Change (Add) (Deduct) (No Change) CONTRACTOR: BY: ARCHITECT: ❑ Recommend Acceptance ❑ Do Not Recommend Acceptance ❑ Other BY: DATE: DATE: OWNER: Er" Recommend Acceptance 0 Do Not ecommend Acceptance BY:f DATE: Mttihr '/t [VW--