HomeMy WebLinkAboutDon Gardner Construction-12/12/2011iDocument G701' - 2001 Change Order PROJECT: (Name and address) Waterloo, City of Forestry Building Upgrades 1117 Campbell St. Waterloo IA 50701 TO CONTRACTOR: (Name and address) CHANGE ORDER NUMBER: 2 DATE: November 18, 2011 ARCHITECT'S PROJECT NUMBER: 2011-0002 ............ __... CONTRACT DATE: July 12, 2011 CONTRACT FOR: General Construction OWNER ❑ ARCHITECT ❑ CONTRACTOR 0 FIELD 0 OTHER 0 The Contract is changed as follows: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) Change order approval for urethane insulation based on actual sq. ft to what was requested in bid. On the Bid form for interior wals the sq. ft. was 1,912 at $3.63/sq.ft. The actual was 2,850, difference of 938 sq. ft. at $3.63 = $3,404.94 The original (Contract Sum) Wfuer-afite€4-Maaa -14ic } was $ 95, 410.00 The net change by previously authorized Change Orders $ The (Contract Sum) (Guaratateed_Maximu*n P.cice) prior to this Change Order was $ 95r 410.00 The (Contract Sum) (Garfkateedl•-A i m -P. ise) will be (increased) (4ecreased) {.u4ged) by this Change Order in the amount of The new (Contract Sum) (Onaranteed.Maximun Pricy)including this Change Order will be The Contract Time will be (oft ed)-( se4) (unchanged) by The date of Substantial Completion as of the date of this Change Order therefore is (Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.) ( ) days $ 3,404.00 $98,814.00 NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. AHTS Architects PLC Don Gardner Construction ARCHITECT (Firm name) 327 E. 4th St. Suite 204 Waterloo, IA 50703 ADDRESS (Signatur Larry R. Kurtz (Typed name) DATE if—, " • I/ CONTRACTOR (Firm name) 315 LaPorte Rd. Waterloo,IA 50702 ADDR 1,e,i4 BY (Signature) Mark Gardner (Typed me) City of Waterloo OWNER (Firm name) Y (Signature)' Ernest G Clark, (Typed name) I (49011 DATE Mayor CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AIA Document G701 Tm - 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org. ItAIADocument G701"- 2001 Instructions Change Order GENERAL INFORMATION Purpose AIA Document G701 is for implementing changes in the Work agreed to by the Owner, Contractor and Architect. Execution of a completed G701 indicates agreement upon all the terms of the change, including any changes in the Contract Sum (or Guaranteed Maximum Price) and Contract Time. Use of Current Documents Prior to using any AIA Contract Document, users should consult www.aia.org or a local AIA component to verify the most recent edition. Reproductions This document is a copyrighted work and may not be reproduced or excerpted from without the express written permission of the AIA. There is no implied permission to reproduce this document, nor does membership in The American Institute of Architects confer any further rights to reproduce this document. The AIA hereby grants the purchaser a limited license to reproduce a maximum of ten copies of a completed G701, but only for use in connection with a particular project. The AIA will not permit reproduction outside of the limited license for reproduction granted above, except upon written request and receipt of written permission from the AIA. Rights to reproduce the document may vary for users of AIA software. Licensed AIA software users should consult the End User License Agreement (EULA). To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org. COMPLETING THE G701 FORM Description of Change in the Contract Insert a detailed description of the change or reference specific exhibits describing, in detail, the change to be made in the Contract by this Change Order. Include any drawings, specifications, documents or other supporting data to clarify the scope of the change. Determination of Costs Insert in the blanks provided, or strike out the terms in parentheses that do not apply, the original Contract Sum or Guaranteed Maximum Price; the net change by previously authorized Change Order (note that this does not include changes authorized by Construction Change Directive unless such changes were subsequently agreed to by the Contractor and recorded as a Change Order); the Contract Sum or Guaranteed Maximum Price prior to this Change Order; the amount of increase or decrease, if any, in the Contract Sum or Guaranteed Maximum Price; and the new Contract Sum or Guaranteed Maximum Price as adjusted by this Change Order. Change in Contract Time Insert in the blanks provided, and strike out the unused terms in parentheses, the amount (in days) of the increase or decrease, if any in the Contract Time. Also insert the date of Substantial Completion, including any adjustment effected by this Change Order. EXECUTION OF THE DOCUMENT When the Owner and Contractor, in occurrence with the Architect, have reached agreement on the change to be made in the Contract, including any adjustments in the Contract Sum (or Guaranteed Maximum Price) and Contract Time, the G701 document should be executed in triplicate by the two parties and the Architect, each retaining an original. AIA Document G701 TM - 2001. Copyright © 1979, 1987, 2000, and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org.