HomeMy WebLinkAboutFailor Hurley Construction-11/21/2011 (2)zitAIA Document G7OITM - 2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 002 11050 Public Market Interior Developmen - General Construction BP2 TO CONTRACTOR (Name and address): Failor Hurley Construction PO Box 446 Hudson, IA 50643 DATE: October 11, 2011 ARCHITECT'S PROJECT NUMBER: 11050 CONTRACT DATE: July 22, 2011 CONTRACT FOR: General Construction OWNER: ❑ ARCHITECT: ❑ CONTRACTOR ❑ FIELD: 0 OTHER 0 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) 1. Cost associated with changing the single wall spiral duct to a double wall spiral duct. Per Failor Hurley PR dated 8.31.2011 . Amount in excess of $5,000.00 mechanical allowance. ADD: $710.00 2. Cost associated to extend the new 16" round spiral duct to the edge of the cafe counter including one (1) tap. Per Failor Hurley PR dated 9.14.2011 ADD: $1,166.00 8. Cost associated to paint new conduits intalled on the exposed ceiling of the Public Makert Project. Per Failor Hurley PR dated 9.15.2011 ADD: $1,586.00 4. Cost associated with remaining amount of electrical allowance not used. DEDUCT: $1,035.00 The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is $ 212,000.00 $ 6,039.00 $ 218,039.00 $ 2,427.00 $ 220,466.00 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. INVISION Architecture ARCHITECT (Firm name) PO Box 1800, Waterloo, IA 50704-1800 BY (Signature) Michael Broshar, FAIA (Typed name) 10/10/1 DATE Failor Hurley Construction CONTRACTOR (Firm name) PO Box 446, Hudson, IA 50643 ADDFItES d BY (Signature) City of Waterloo OWNER (Firm name) City Hall 715 Mulberry Street, Waterloo, Iowa of 03 William W Failor (Typed name) 1011, fin DATE BY (Signature) // l �i_ n e1�t� 61. 4 8'GL (Typed name) "(.94( gin( DATE AIA Document G701 TM - 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 10:30:44 on 10/11/2011 under Order No.5896542442_1 which expires on 07/19/2012, and is not for resale. User Notes: (2000172079) August 31, 2011 InVision Architecture P.O. Box 1800 Waterloo, Iowa 50704 Attn: Mr. Justin Holthaus Subj: Public Market Interior Development Phase 2 — General Construction Justin, CONSTRUCTION ''may We propose to furnish all material, labor, and equipment to change the single wall spiral duct to a double wall spiral duct in accordance with the owner's request for the additional sum of $5,710.00. Breakdown Mechanical $5,110.00 Bond 81.00 Contractor's Fee 519.00 Total Add: $5,710.00 Note - Delivery time on the spiral duct is four (4) days from the date of order. We trust our proposal meets with your approval and we will have your early authorization to proceed. Please feel free to contact us if any additional information is required. Sincerely, FAILOR HURLEY CONSTRUCTION William W. Failor P.O. Box 446, Hudson, IA 50643 I Office 319-230-3475 I Fax 319.988.9804 1 Fai1orHurley.com Sep 1411 08:09a William W. Failor 319-988-3275 p.1 [CONSTRUCTION FAX MEMO September 14, 2011 Justin Holthaus InVision Architecture Fax no. 233-9772 Subj: Public Market Interior Development — Bid Package 2 Justin, We propose to furnish all material, labor, and equipment required to extend the new 16" round spiral duct to the edge of the cafe counter including one (1) tap as requested by the ownerfor the additional sum of $1,166.00. Clarifications 1. New S-1 diffuser to be mounted at 45 degrees toward floor 2. Delivery time on the S-1 diffuser is approximately three (3) weeks Breakdown Young Plumbing & Heating $1,043.00 Bond 17.00 Contractor's Fee 106.00 Total Add: $1,166.00 We trust our proposal meets with your approval and we will have your early authorization to proceed. Sincerely, Farls; AlLLORHURLEY CON TR CTION ) William W. Failor P.O. Box 446, Hudson, IA 50643 1 Once 319-230-3475 1 Fax 319.988.9804 1 Fa1OrHuriay.com Sep 1511 01:29p William W. Failor 319-988-3275 p.1 CONSTRUCTIONI FAX MEMO September 15, 2011 Justin Holthaus InVision Architecture Fax no. 233-9772 Subj: Public Market Interior Development — Bid Package 2 Justin, We propose to furnish all material, labor, and equipment required to paint new conduits installed on the exposed ceiling of the Public Market Project in accordance with previous correspondence for the additional sum of $1,772.00. Breakdown Modem Painting $1,556.00 Bond -264 Contractor's Fee BILL AGREED TO CUT THE BOND AND CONTRACTORS FEE. TOTAL: $1,586.00 As the project completion date is rapidly approaching, your prompt response to this proposal is needed. Feel free to contact us if any additional information is needed. Sincerely, FAILOR HURLEY CONSTRUCTION 441! William W. Failor P.O. Box 446, Hudson, IA 50643 1 Office 319.230-3475 1 Fax 319.988.9804 J FallorHurley.com