Loading...
HomeMy WebLinkAboutAmericlean-11/14/2011 (2)CITY OF WATERLOO Council Communication City Council Meeting: 11-14-2011 Prepared: 10-31-2011 Dept Head Signature: # of Attachments: 3 SUBJECT: Five Sullivan Brothers Convention Center Duct And Coil Cleaning Change Order #1 Submitted by: Craig Clark Building Official/Maintenance Administrator Recommended City Council Action: Approve recommendation of award of change order #1 in the amount of $67,668.84 to Americlean of Waterloo, Iowa in conjunction with Five Sullivan Brothers Convention Center Duct And Coil Cleaning, be received, placed on file and adopted. Summary Statement Addition work to be done by Americlean will help protect the Five Sullivan Brothers Convention Center heating and cooling system from future problem. This type of work was not part of the original contat but is very important for future use of the Five Sullivan Brothers Convention Center. Expenditure Required $67,668.84 Source of Funds 010-22-6868-1382 Background Information: Request # RFC CW5501-002-B Project # City of Waterloo To: Craig Clark REQUEST FOR CHANGE Request date: 10/04/11 Project Name: 5 Sullivan Brothers Convention Center HVAC Project Location: 4th and Sycamore Reason for Request: O Insufficient Information ❑ Engineering Conflict X Alternate Proposal Probable Effect: X Increase Cost ❑ Decrease Cost O No Cost Change X Increase Time ❑ Decrease Time ❑ No Time Impact Action Requested: ❑ Clarification ❑ Direction X Approval Reference: Mold -HVAC Sanitizing agents and Antimicrobiai/Fungicidal Coatings Drawing No -Sheets M11, 12 and 20 Detail No -NA Spec Section -NA This RFC is the 2nd in a series to be submitted as information and recommendations are best determined. As before, this segmented approach is deemed best to allow for the project to continue, utilizing industry recommended protocols for addressing mold contaminates, and to assist in restoring the contaminated lining materials within the HVAC systems. These recommendations address the application of EPA registered sanitizing/disinfecting agents and antimicrobial/fungicidal HVAC coatings, each registered specifically for use in HVAC Systems. HVAC Systems #3, 4 and 5. Recommendation Per Project IEP recommendations, included the HVAC and Environmental Assessment (performed by Joel Koffron, Environmental Engineer -IEP). Contractor to provide the following services: 1) Supply OSHA required PPE to be donned by workers during application of sanitizing/disinfecting agents and antimicrobial/fungicidal coating materials to the interior of the contaminated ductwork. 2) Apply Oxine- EPA registered HVAC sanitizing agent to all supply (HP and LP) and return ductwork on HVAC systems #3, 4, and 5. 3) Apply Surface Shield- EPA registered antimicrobial HVAC encapsulate to all Low Pressure supply ductwork and all return ductwork on HVAC systems #3, 4, and 5. Clear coating- ULV application. 4) Apply IAQ 8500 or Fosters 40-30- EPA registered antimicrobial/fungicidal HVAC coating to all HP supply ductwork on HVAC systems #3, 4, and 5, from the AHU to the VAV's. Black coating- airless sprayer/ lance application. 5) Provide protective services- drops, containments, visqueen as required for applications. 6) Furnish and install additional access doors as required for application of products as above 7) Supply lift equipment for application of sanitizing and coating agents. *Removal and replacement of degraded or unsalvageable interior lining materials in the AHU's and any HP supply ductwork is not included, and will be addressed on another RFC as information and recommendations are available. 1 RFC CW5501-002-B 5 Sullivan Brothers Alternate Bid- RFC # CW5501-002-B (HVAC Sanitizing agents and AntimicrobiatIF [tgicidal Coatings—HVAC Systems #3, 4 and 5) Provide all necessary labor, equipment, and materials as noted in the recommendations section of this RFC. PPE- Supply respirators, respirator cartridges, disposable respirators, Tyvek suits as required $385.92 Protective services- Supply all labor and materials for required drops, visqueen, site protection during the application of products $199.60 Apply Oxine- EPA Registered HVAC sanitizing agent to all HP and LP Supply and Return ductwork on HVAC systems #3, 4, and 5 HVAC System #3 $1489.00 HVAC System #4 $2182.00 HVAC System #5 $4241.00 Apply Surface Shield- EPA Registered HVAC antimicrobial encapsulating coating -Clear- ULV application- to all LP Supply and Return ductwork on HVAC systems #3, 4, and 5 HVAC System #3 $1732.21 HVAC System #4 $8140.93 HVAC System #5 $15952.14 Apply IAQ 8500 or Foster 40-30- EPA Registered HVAC fungicidal/antimicrobial coating- Black - Airless sprayer/spray lance application- to all HP Supply ductwork on HVAC systems #3, 4, and 5 HVAC System #3 $8205.94 HVAC System #4 $3154.43 HVAC System #5 $5926.51 2 RFC CW5501-002-B 5 Sullivan Brothers Furnish and install additional Ductmate 8-10" insulated access doors- DCI 8GA or DCI 10GA- as required to allow for adequate access to ductwork for application of specified products 48 each $1391.04 Supply lift equipment for additional duration for application of noted materials, including delivery and pick up $1850.52 Total RFC #CW5501-002-B NOT TO EXCEED $54851.24 *Contractor will review and initiate any alternate decreased cost options for reduced scope of work which may include substitution coating materials if deemed appriate during this work, and adjust the final invoice accordingly as a benefit to the owner/agent Response: x Proceed with recommendation 0 Proceed with the following instructions: Billing to be: 0 Unit Price 0 Cost Plus Owner signature. X Lump Sum 0 T&M 7/-Rdi date 3 RFC CW5501-002-B 5 Sullivan Brothers ENVIRONMENTAL SERVICE AGREEMENT This AGREEMENT is by and between: Americlean and City of Waterloo agree as follows: Reference No.: RFC #CW5501-001 Americlean of Iowa, LLC 1410 Rockford Rd SW Cedar Rapids, IA 52404 City of Waterloo Five Sullivan Brothers Convention Center 4th and Sycamore Waterloo, IA 50703 1) Allow Americlean of Iowa LLC to provide environmental consulting services which will include: (a) Performing a visual inspection of all ductwork for each of the currently installed and functioning air handling mechanical units to include AHU numbers 3, 4 and 5. (b) Perform a minimum of two (2) surface samples from each of the supply side unit ducting insulation linings and a minimum of one (1) per return main duct runs. This would be a total of nine (9) surface samples. (c) Perform air sampling of a minimum of two (2) ambient air sample in one of the main areas in which each of these areas service, minimum of six (6) indoor air samples with one (1) outdoor baseline collected for a total of seven (7) air samples. (d) Collect all data and work with the owners selection of mechanical contractor to make suggestions to the owner as to the direction and scope of work that would be felt necessary to provide a Condition 1 Environment within the building and to restore the mechanical systems (as defined in the applicable standards noted) therein. (e) We recommend conducting a complete Post Remediation Verification (PRV) sampling at the completion of all work to verify that a Condition 1 Environment exists within the building in the areas inspected. This is not included and cost/scope to be determined. 2.) Fee Schedules for Services Environmental Engineer / IEP - $98.50/hr (site and documentation time) Technician for Assessment - $68.50/hr (assist IEP, provide access to ductwork) Samples - $99.50/ea (this includes shipping, restock costs and laboratory fees) Anticipated time for IEP time — 18 hours = $1,773.00 Anticipated time for Technician - 9 hours = $616.50 Sampling Fees —16 samples — $1592.00 Total fees — Not to Exceed - $3981.50 Terms: As outlined on the original contract for this project. If further work is warranted on your project based on any recommendations by Americlean of Iowa LLC, other professionals, requested by the Client, or if unforeseen conditions arise, then Americlean of Iowa LLC will notify the Client of the change in scope of the project and charge Time, Material, and Subcontract rates in accordance with the Americlean of Iowa LLC costs and all other fees and costs which are due pursuant to this service agreement. 3.) The industry standard remediation provisions set forth in the IICRC S520 & ACR 2006 general conditions and guidelines and are incorporated hereunto and made a part of this agreement. EXECUTED THIS i4 Day of -August. NCO , 20 11 By: Client - of �sva�es-1 1(11(itle Cr By: Americlean of Iowa LLC Title Cedar Rapids Iowa City Waterloo Dubuque (319)362-0604 (319)354-4577 (319)233-8144 (563)582-2646 Davenport Toll Free FAX (563)383-0604 (800)716-0604 (319)896-4509 Email:, americlean@southslope.net www.americleaniowa.com Request # RFC CW5501-002-A Revised Project # City of Waterloo To: Craig Clark REQUEST FOR CHANGE Request date: 09/09/11 Project Name: 5 Sullivan Brothers Convention Center HVAC Project Location: 4th and Sycamore Reason for Request: O Insufficient information ❑ Engineering Conflict X Alternate Proposal Probable Effect: X Increase Cost o Decrease Cost ❑ No Cost Change X Increase Time ❑ Decrease Time ❑ No Time Impact Action Requested: O Clarification ❑ Direction X Approval Reference: Mold Containment, PPE, Cleaning of Ambient Air Drawing No -Sheets M11,12 and 20 Detail No -NA Spec Section -NA This RFC is the first in a series to be submitted as information and recommendations are best determined. This segmented approach is deemed best to allow for the project to continue, utilizing industry recommended protocols for addressing mold contaminates, and to assist in reducing impact to workers and building occupants. The intent of these recommendations are to provide for OSHA required PPE, Site Protection (Cleaning of ambient air during cleaning processes), and containment/isolation strategies as required during the remaining cleaning efforts of HVAC Systems #3 and 4. Recommendation Per Project IEP recommendations, included the HVAC and Environmental Assessment (performed by Joel Koffron, Environmental Engineer -IEP). Contractor to provide the following items during the remaining cleaning of HVAC Systems #3 and #4: 1) Supply OSHA required PPE to be donned by workers during cleaning of the contaminated ductwork 2) Furnish HEPA filtered AFD's (Air Filtration Devices) in reasonable, sufficient quantity and sizing in work areas of facility to clean/scrub ambient air to reduce airborne contaminates 3) Implement localized containment cubes or barriers as required in areas that do not compromise worker or occupant safety to isolate ductwork openings/work areas during cleaning efforts 4) Furnish HEPA AFD's in each work area in close proximity to the cleaning efforts to control and capture airbome contaminates during cleaning efforts 5) HEPA AFD's quotation to include set-up, tear down, monitoring as required, decontamination, and filter changes as required 1 Revised RFC CW5501-002-A 5 Sullivan Brothers Alternate Bid- RFC # CW5501-002-A (AFD's, Isolation, PPE —HVAC Systems #3 and 4) Provide all necessary labor, equipment, and materials as noted In the recommendations section of this RFC. PPE- Supply respirators, respirator cartridges, disposable respirators, Tyvek suits as required $672.00 Containment barriers- Supply all labor and materials for required containment cubes, walls, and barriers including zipper doors and poles as necessary. $1558.80 Fumish the following HEPA AFD's for the duration of the project related to HVAC Systems #3 and 4: 2-4 each- XXLg 2000 CFM AFD's to be placed in areas/rooms conditioned by AHU's #3 and 4 $5138.88 3 each- Lg 600 CFM AFD's —to be utilized in locations during cleaning efforts, and placed randomly throughout project areas for duration of project as deemed necessary $1351.26 Equipment set up, tear down, monitoring, and decontamination of AFD's $804.02 Furnish/supply filter replacements for AFD's- HEPA filters and pre filters. $1474.52 Total RFC #CW5501-002-A (Revised 09/15/11) NOT TO EXCEED $8836.10 2 Revised RFC CW5501-002-A 5 Sullivan Brothers Response: x Proceed with recommendation ❑ Proceed with the following instructions: Billing to be: 0 Unit Price Owner signature: 0 Cost Plus X Lump Sum ❑ T&M Cedar Rapids Iowa City Waterloo Dubuque (319)362-0604 (319)354-4577 (319)233-8144 (563)582-2646 Davenport Toll Free FAX (563)383-0804 (800)718-0804 (319)896-4509 Email americineaol.com amerideanesouthslooe.net www.amerideaniowa.com 3 Revised RFC CW5501-002 A 5 Sullivan Brothers