Loading...
HomeMy WebLinkAboutReilly Construction Co-11/7/2011CHANGE ORDER NO. 1 Owner: City of Waterloo, Iowa Date: October 10, 2011 Project: FY 2011 Highway 63 South Manhole Rehabilitation Owner's Contract No.: 809 Contractor: Reilly Construction Company, Inc. Date of Contract Start: August 9, 2011 $ 99,675.00 You are directed to make the following changes in the Contract Documents. Description: 8001: Seal Casting Rings to Top of Manhole 22 Each @ $200.00 = $ 4,400.00 8002: Rebuild Top 3 Feet of Manhole 18-6-9 Located in Ansborough Avenue Pavement 1 Each @ $1,950.00 = 1,950.00 8003: Add Water Plug to Seal Inside and Outside of Leaking Manholes 9 Each @ $425.00 = 3.825.00 TOTAL ADDED ITEMS $10,175.00 TOTAL INCREASE/DECREASE FOR BID ITEMS (SEE ATTACHMENT) (6,180.00) NET ADD $3,995.00 Reason for Change Order: 8001: Chimney seal would not work on old style cone sections. 8002: Existing brick and concrete adjusting rings and pavement box -out had to be removed and replaced to allow chimney seal installation. 8003: Required to seal active infiltration on manholes. CONTRACT PRICE CONTRACT TIMES To Final Completion Original: $ 99,675.00 Original: September 30, 2011 Previous C.O.s (ADD/DEDUCT): $ — Previous C.O.s (ADD/DEDUCT): This C.O. (ADDS): $ 3,995.00 This C.O. (ADD/DEDUCT): Contract Price With All Approved Change Orders: $ 103,670.00 REVISED: September 30, 2011 Revised Completion Date: September 30, 2011 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. APPROVED: By: ACCEPTED: By: THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO ed Signature) Date: Contractor (Authored Sign V t7 Date: L:\work\project\113632\adnm\60184424.61-Hwy 63 MH Rehab\CO No 1.doc AECOM 60184424.61 1 Project No. Change Order No. ATTACHMENT TO CHANGE ORDER NO. 1 FY 2011 HIGHWAY 63 MANHOLE REHABILITATION CITY CONTRACT NO. 809 CITY OF WATERLOO, IOWA Project No. 60184424.61 Contractor: Reilly Construction CONTRACT COMPLETED CHANGE Item Description Units Unit Price Quantity Quantity Quantity Amount ADD ITEMS 1 Remove, Salvage and Reinstall Frame and Cover EA 275.00 41.0 49.0 8.00 2,200.00 3 Remove Cone and Add Flat Top EA 925.00 2.0 3.0 1.00 925.00 4 Remove Adjusting Rings on Manhole MH 200.00 34.0 38.0 4.00 800.00 6 Add 12 -in Barrel Section to Manhole EA 350.00 2.0 4.0 2.00 700.00 12 Internal Chimney Seal greater than 12 -in EA 525.00 18.0 25.0 7.00 3,675.00 13 32 -In Internal Chimney Seal EA 900.00 1.0 2.0 1.00 900.00 16 Manhole Inflow Dish EA 125.00 54.0 55.0 1.00 125.00 19 Rural Mix Fertilizing and Seeding AC 5,500.00 0.50 0.87 0.37 2,035.00 DEDUCT ITEMS 8 Add 36 -In Barrel Section to Manhole EA 625.00 1.0 - (1.00) (625.00) 9 6 -In Adjusting Rings EA 125.00 19.0 17.0 (2.00) (250.00) 10 4 -In Adjusting Rings EA 115.00 15.0 12.0 (3.00) (345.0 11 Internal Chimney Seal less than or equal 12 -In EA 375.00 64.0 31.0 (33.00) (12,375.00) 14 54 -In Internal Chimney Seal EA 1,300.00 1.0 - (1.00) (1,300.00) 15 Mnahole Lid Gasket EA 100.00 84.0 83.0 (1.00) (100.00) 17 9" thick Crushed Stone Base SY 17.50 30.0 - (30.00) (525.00) 18 Stabilization Mix Fertilizing and Seeding AC AC 3,000.00 4,000.00 0.5 1.00 - 0.87 (0.50) (0.13) (1,500.00) (520.00) 20 Mulching TOTAL INCREASE/DECREASE FOR BID ITEMS (6,180.00)