"Iowa Department of Transportation
Non -
Change Order Part Part
Non -Substantial: 0 0
No. 4 Substantial: ►/ 0 10 / 20 /11
Contract
Accounting ID No.: N/A (Project Locally Let) County Black Hawk
Concurrence Date
Project No: NRT-NT08(1)-9G-07
Kind of Work: P.C.C. Trail Date Prepared: 10-03-11
Contractor. Vieth Construction Corporation
You are hereby authorized to make the following changes to the contract documents.
A - Description of change to be made or extra work to be done:
8006 - Additional Removals
8007 - Causeway Changes
8008 - Additional Supervision/Overhead Work
8009 - Additional Structural Concrete
8010 - Additional Reinforcing Steel
8011 - Additional Mobilization
8012 - Sheet Pile - Provide and Install
B — Reason for change or extra work:
The City of Waterloo has determined to do additional footing repair work on the existing riverwalls between 5th and 6th Streets.
8006 - Work shall include all removals necessary to provide adequate depth for new topping course.
8007 - Work needed to adjust causeway to complete full and partial depth repairs to existing riverwalls.
8008 - Additional time required to superintend and oversee the additional construction/
8009 - Work shall include all additional structural concrete needed to complete the added repairs
8010 - Work shall include all additional reinforcing steel needed to complete the added repairs
In order to complete the 7th Street Portage, a revised design involving driven sheet piling was required because the existing rock surface was
much lower than was estimated for the original design.
8011 -Additional mobilization is required to mobilize specialized equipment needed to drive sheet pile.
8012 - Work shall include providing and installing sheet piling in accordance with the revised plan details.
(Continued on reverse side)
Approved
Director, Office of Systems Planning Dateeer Date
Receipt is acknowledged of this change or extra work and terms of settlement are hereby agreed -to:
Approved contingent upon funds being available under the existing I/t-% 4 6-00A-rJ7.
Ity of Werloo, IA
)
16(9%4 /Nit
Date
project agreement or upon additional Federal -aid funds being Contractor
By
made available by a modified project agreement.
Date For the Division Administrator
Federal Highway Administration
Approved
`V2c�
�1
Date
Assistant Construction Engineer Date
DISTRIBUTION: Project Engineer — Forward original to District.
District — Nonsubstanlial — Forward original and one copy to the Office of Construction and two copies bads to the Project Engineer.
- Substantial - Forward original and two copies to the Office of Construction.
C-1 -Settlement for cost of work to be made as follows:
8006 — Contractor wil
8007 — Contractor wil
8008 — Contractor wil
8009 — Contractor wil
8010 — Contractor wil
8011 — Contractor wil
8012 — Contractor wil be paid $515 per LF of sheet piling installed.
C-2 — Justification for cost(s)
be paid a lump sum price of $17,500.
be paid a lump sum price of $3,850.
be paid a lump sum price of $2,450.
be paid $1,185 per CY of structural concrete placed.
be paid $1.85 per pound of reinforcing steel
be paid a lump sum price of $15,000
Accounting ID No.
1111111
(Project Locally Let)
Change Order No. 4
8006 — Amount of removals is approximately double the original bid quantity. The original bid price for removals was $20,000.
8007 — The original price for installation of the causeway was $27,500. The lump sum price provided by the contractor appears
reasonable based on the original price, and the work required to move the causeway to allow the repair work to be completed.
8008 — The contractor will be required to provide substantial additional oversight of subcontractor completing the work, as well as
considerable estimating time for this additional work.
8009 — The structural concrete price for this change order work appears reasonable in comparison to the original bid price of
$1,085.
8010 — The reinforcing steel price for this change order work appears reasonable in comparison to the original bid price of $1.60.
8011— Prime contractor for this job requested quotes from two subs for this work. The lump sum mobilization price appears
reasonable for bringing in specialty equipment to the job site.
8012 — Prime contractor for this job requested quotes from two subs for this work. The per LF price appears to be within reason for
the work required, particularly considering the short pile lengths.
55 additional working days will be added to contract for this work. This change order significantly changes the scope of the work. In
addition, the site conditions (building in the Cedar River), have not allowed a typical construction sequencing for the original scope of
work, and have necessitated the addition of additional working days.
D — ITEMS INCLUDED IN CONTRACT
If Credit
Add "CR"
Change
No.
Line Item Number
Unit Price
.xxx
Quantity
.xxx
Amount
.xx
7
E — ITEMS NOT INCLUDED IN CONTRACT
TOTAL
If Credit,
Add "CR"
Change
No.
Item Description
Item Number
Function
Code
Unit Price
.xxx
Quantity
.xxx
Amount
xx
8006
Additional Removals
34
410
1.00
17,500.00
17,500.00
8007
Causeway Relocation
35
410
1.00
3.850.00
3,850.00
8008
Additional Review
36
410
1.00
2,450.00
2,450.00
8009
Additional Structural Concrete
37
410
1,185.00
27.00
31,995.00
8010
Additional Reinforcing Steel
38
410
1.85
1,000.00
1,185.00
8011
Mobilization
39
410
1.00
15,000.00
15,000.00
8012
Sheet Piling
40
410
515.00
200.00
103,000.00
TOTAL
174,980.00