HomeMy WebLinkAboutPeterson Construction-9/26/2011Owner City of Waterloo Project FY 2010 River Renaissance Lower Plaza Owner's Contract No. 763 CHANGE ORDER NO. 12 Date September 20, 2011 3 - CJ Contractor Peterson Contractors Inc. Date of Contract Start April 15, 2010 $ 3,189,424.95 You are directed to make the following changes in the Contract Documents. Description: 12-1 Provide Scofield Chromix Coloring Agent and Lithochrome ColorWax (12,465 SF @ $2.86/SF) $35,649.90 TOTAL ADDITIONS $35,649.90 Reason for Change Order: 12-1 Based on the results obtained on other downtown Waterloo Vision Iowa projects. it was decided to use the Scofield products in lieu of the originally bid coloring agents.. CONTRACT PRICE CONTRACT TIMES To Substantial To Final Completion Completion Original: $ 3,189,424.95 Original Completion Date: 11/30/2010 12/31/2010 Previous C.O.s (ADD/DEDUCT): $ 167,505.85 Revised Completion Date: No Change No Change This C.O. (ADD/DEBUUCT): $ 35,649.90 Contract Price with all approved Change Orders: $ 3,393,580.70 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPR S ED: By. Owner (Authorized Signature) W -1:/t1-?- ).\ By,� Qt1(a "Poll Date Contractor (Authorized Signature) Date Date AECOM 60155128 / 12 Project No. Change Order No. L:\work\project\60155128\eng\Change Orders\Lower Plaza CO# 12.docx