Failor Hurley Construction-9/19/2011
IA Document G701TM - 2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 001 11050 Public Market Interior Developmen - General Construction BP2 TO CONTRACTOR (Name and address): Failor Hurley Construction PO Box 446 Hudson, IA 50643 DATE: August 25, 2011 ARCHITECT'S PROJECT NUMBER: 11050 CONTRACT DATE: July 22, 2011 CONTRACT FOR: General Construction OWNER: 0 ARCHITECT: 0 CONTRACTOR ❑ FIELD: 0 OTHER: 0 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) 1. Cost associated with furnishing all material, labor, and equipment required to install Fluid -Applied Flooring in Kitchen 110 in lieu of painting the floor in accordance with your request. Per Failor Hurley Construction document dated 8.22.11. ADD: $6,169.00 2. Cost associated with furnishing all material, labor, and equipment required to install FRP Paneling at the north wall of Kitchen 110 in accordance with the owner's request at the last project progress meeting. Per Failor Hurley Construction document dated 8.22.11. ADD: $524.00 3. Cost associated with deleting furnishing the grease interceptor on the subject project in accordance with the owner's request. Per Failor Hurley Construction document dated 8.12.11. DEDUCT: $654.00 The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be $ 212,000.00 $ 0.00 $ 212,000.00 $ 6,039.00 $ 218,039.00 The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is September 26, 2011 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. 1NVISION Architecture Failor Hurley Construction ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (F'rm name) City of Waterloo PO Box 1800, Waterloo, IA 50704-1800 B (Signature) PO Box 446, Hudson, IA 50643 ADD !Amyx) BY tgnature) Michael Broshar, FAIA William W Failor City 715 Mulberry Street, Waterloo. low 4i 703 (Typed name) (Typed name) E 0 2411 1 rL0I1 031/1, DATE DATE (Signature) Ernest G. Clark (Typed nain''e) DATE AIA Document G701 ' - 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:24:35 on 08/25/2011 under Order No.5896542442_1 which expires on 07/19/2012, and is not for resale. User Notes: (1782994281)