Loading...
HomeMy WebLinkAboutAecom Technical Services-9/12/2011A=COM AECOM 319 232 6531 tel 501 Sycamore Street 319 232 0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com Supplemental Agreement No. 2 Cedar River Water Trail Portages at Park Avenue, Paramount Park and 6th Street Dam Waterloo, Iowa WHEREAS, an Agreement for Professional Services was entered into by the City of Waterloo, Iowa ("City"), and AECOM Technical Services, Inc., previously known as Earth Tech, Inc. ("Consultant"), of Waterloo, Iowa, dated August 6, 2007, for the construction of two portages on the proposed Cedar River Water Trail in Waterloo, Iowa; and WHEREAS, the City and the Consultant entered into Supplemental Agreement No. 1, dated November 16, 2009, for Phase II, Construction -Related Services, for the construction of three portages on the north side of the Cedar River located near Park Avenue, Paramount Park and the 6th Street Dam; and WHEREAS, the City and the Consultant now desire to enter into Supplemental Agreement No. 2 for design and construction -related services for additional river wall repairs between 5th Street and 6th Street, in addition to substructure modifications to the 6th Street dam portage due to unforeseen subsurface conditions. NOW THEREFORE, it is mutually agreed to amend the original Agreement for Professional Services as follows: I. Project Description The project consists of river wall repairs on the north side of the river from 5th Street to 6th Street in addition to footing modifications for the proposed 6th Street dam portage. II. Scope of Services The Scope of Services provided by the Consultant under this Agreement shall consist of design and construction -related services for rehabilitation of the existing river wall on the north side of the river between 5th and 6th Streets, in addition to modifications of the proposed 6th Street dam portage footing due to unforeseen subsurface conditions. The Scope of Services to complete this work is further defined as follows: Design Services (Tasks 1-5) These tasks include the final design of the river wall rehabilitation and the revised 6th Street dam portage footing design and preparation of final construction plans and specifications for the project. Included in these tasks will be structural design, typical sections and details, tabulations and quantities, and project specifications. It is anticipated this work will be added to the existing construction contract. The following specific tasks lead to the completion of the design services: Task 1 - Wall and Footing Structural Design Task 2 - Typical Sections and Details Task 3 - Bid Items and General Notes a. Bid Item and Quantity Listing b. Estimate Reference Information c. General Notes Task 4 - Tabulations and Quantities Task 5 - Project Specifications A=COM Page 2 Construction -Related Services (Tasks 6-10) These tasks include the construction -related services for the project. These tasks will be completed in conjunction with the overall portage project. The following specific tasks lead to the completion of the construction -related services for this portion of the project. Task 6 - Answer Design Questions Task 7 - Field Observation Task 8 - Reports to Client Task 9 - Final Field Review Task 10 - Record Drawings III. Compensation Compensation for the above design services will be a lump sum fee of Ten Thousand Dollars ($10,000.00), and compensation for the above construction -related services will be a lump sum fee of Ten Thousand Dollars ($10,000.00) and shall not be exceeded without authorization of the City. IV. In all other respects, the obligations of the City and the Consultant shall remain as specified in the Agreement for Professional Services dated August 6, 2007. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 2 as of the dates shown below: CITY OF WATERLOO, IOWA ATTEST: B Ernest G. Clark Mayor AECOM TECHNICAL SERVICES, INC. Joe A. Becker Vice President L:\work\ADMI N\AGREE\SUPPLE\SA2CedarRiverWaterTrail.doc Date M91\ -"9 -Ar Ai Date September 6, 2011