Loading...
HomeMy WebLinkAboutVoltmer Inc-8/22/2011City of Waterloo, Iowa, Traffic Operations 408 E. eh St, Waterloo, IA 50703 Ph: (319) 291-4440; Fax: (319) 291-4094 DATE: TO: ATTENTION: FROM: dew/1A SUBJECT: CS TSf^ - !�'I 707 —85-07 REAS ❑ FOR YOUR APPROVAL )4F,Qii YOUR REVIEW/COMMENTS OR YOUR FILES ❑ FOR YOUR SIGNATURE ❑ TAKE APPROPRIATE ACTION ON ❑ FOR YOUR INFORMATION ❑ PER YOUR REQUEST ❑ PER OUR CONVERSATION ❑ PER E-MAIL 0 COMMENTS: k,V i i;),40o ajyt- ' /c-aj pi- '4, ee.14 st-/Ze44ex)av, . .%ld4,edS 462*1 • CITY OF WATERLOO, IOWA Traffic Operations Department Contract No.: 28149 CONTRACT MODIFICATION No. 2 Traffic Operations Project Number: TRF -147 Project No: CS -TSF -8155(707)- -85-07 Kind of Work: Traffic Signals Date Prepared: August 7, 2011 Contractor: Voltmer Inc. The above referenced contract between City of Waterloo and Voltmer Inc. is hereby modified as described in this Modification document. A - Description of change to be made or extra work to be done: 1- Change order to modify and complete Traffic Signalization: a. Adding a relay point on a communication tower for radio communications system and eliminating 2 tall poles. b. Additional raceway into the pole base. c. Restore lighting circuit. d. Pole raceways. 2- Remove existing pavement markings. 3- Astro Brackets for sign mounting in place of wood posts. 4- Additional saw cut needed for pavement removal. 5- Additional 2.8 SY 10" PCC Pavement Widening. B — Reason for change or extra work: 1- Traffic Signalization a. Reduces two poles at the location for improved safety, adds the component on tower with 120 degree field that will enable it to "see" this location as well as many other locations for future radio installations. b. Raceways into the existing poles are too full to accommodate the number of new cables specified. Extra conduit needs to be installed through existing concrete base. c. Needed but not addressed on the plans. d. Added camera cable and added preemption cables are do not fit the bottom chord of the truss. Relocate the units to top chord. 2- Existing edge line pavement markings need to be removed where they no longer comply with the design where the left tum pockets are extended. (Continued on reverse side) Approved: District 2 Local Systems Engineer Date Project Engineer Receipt is acknowledged of this modification and terms of settlement are hereby agreed to. For City of Waterloo: Name: 4 S't— Signature Date: Title: For Contra tor: Name: Signature r' 1AI.�ij0\,-Vylex TitleWka} I®W(u—r Date: Cs)?A P 11 4 u-,971 2c Date 3- "Turning Traffic Must Yield To Pedestrian" Signs is installed on the signal poles using Astro brackets for improved operations and eliminating wood posts. Contractor agrees that full payment of wood post contract item 180 fully compensates the cost of Astro brackets VI'/W3 NOSVIN ! O z 6' 0 da 6131410 NOI1V110001111101N3YW.dlld30 VMOI end that the cost of poles not installed equals the cost of the Astro brackets installed. 4 HIND; Pavement removal on Sheet B.06 needs two saw cuts. The quantity tabulations only show enough quantity for 1 saw cut. The detals however, show two cuts are needed. It is agreed that the contractor be paid for only half of the extra saw cut length and the contractor bear the cost of the other half. 5- PCC Pavement Widening, 10", is 2.8 SY above the contract quantity. C-1 —Settlement for cost of work to be made as follows: 1- $18,623.20 a. $8,434.00 b. $1,200.00 c. $5,239.20 d. $3,750.00 2- $385.00 3- $0.00 4- $830.00 5- $134.4 C-2 — Justification for cost(s) 1- Traffic Signalization a. The radio communications prices appear justified based on City's previous experience with that type of work and equipment. Thi supplier was also directly contacted the supplier to make sure the prices are justified. b. Higher cost than normal is justified of delivery charges for rushing small quantities of material, lost time for crew and administrative time to come up with the solution. c. Breakdown of prices appear reasonable for the size of the job. d. Prices are reasonable based on the Traffic Operation's knowledge of similar activities. Higher cost of mobilization of this activity for traffic control. U.S. 63 is a state highway and you must close portions at a time and keep it open to traffic and establish traffic control per Iowa DOT standards. 2- Price is just based on similar work. 3- Price of Astro bracket could have been higher than the wood posts but contractor accepts an even -out replacement. 4- Sub -contractor had asked for $1660. Only half of this amount and no prime mark-up are agreed upon. 5- Item 070 Quantity adjustment per contract unit price. D - ITEMS INCLUDED IN CONTRACT Change No. Line Item Number Unit Price Quantity Amount 7002 200 18,623.20 1.00 18,623.20 7003 180 42.00 11.00 CR 462.00 CR 7004 070 48.00 2.8 134.40 385.00 TOTAL 18,295.60 E - ITEMS NOT INCLUDED IN CONTRACT If Credit, Add "CR" Change No. Item Description Item Number Function Code Unit Price .xxx Quantity .xxx Amount .xx 8004 PAV'T MARK RMVD 360 2527- 48.125 8.000 385.00 9263180 8006 ASTRO BRACS 365 2599- 115.500 4.000 462.00 SUPPLY AND INSTALL 9999005 8007 SAW CUT 370 2599- 4.000 207.500 830.00 9999009 TOTAL 1,677.00