HomeMy WebLinkAboutAecom Technical Services-7/25/2011A COM AECOM 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecom.com U.S. HIGHWAY 63 IMPROVEMENTS FRANKLIN STREET TO NEWELL STREET FINAL DESIGN ASSISTANCE WATERLOO, IOWA SUPPLEMENTAL AGREEMENT NO. 5 319 232 6531 tel 319 232 0271 fax WHEREAS, a Professional Services Agreement was entered into by the City of Waterloo, Iowa ("City"), and AECOM Technical Services, Inc., formerly Earth Tech, inc. ("Consultant"), of Waterloo, Iowa, dated April 3, 2006, for the alternative evaluation, traffic analysis, environmental documentation, preliminary design, final design and construction review for improvements on U.S. Highway 63 between the U.S. 218 Interchange and Donald Street in Waterloo, Iowa; and WHEREAS, Preliminary Engineering (NHSX-63-6(69)--3H-07) was defined and authorized in said agreement dated April 3, 2006; and WHEREAS, the City and Consultant entered into Supplemental Agreement No. 1 dated July 27, 2007, for engineering services during the construction phase of the U.S. Highway 63 —Westfield Avenue Connection Project; and WHEREAS, the City and Consultant entered into Supplemental Agreement No. 2 dated December 14, 2007, to increase the Estimated Actual Costs for Task 15 — Management of Contaminated Subsurface Soil provided by Weston Solutions, Inc., due to delay in construction progress related to inclement weather conditions and management/disposal for excess spoil; and WHEREAS, the City and Consultant entered into Supplemental Agreement No. 3 dated August 19, 2010, to include the final design of a 4 -lane highway between Newell Street and Donald Street in Waterloo, Iowa, in accordance with the Preliminary Plans completed in November 2009; and WHEREAS, the City and Consultant entered into Supplemental Agreement No. 4 dated December 3, 2010, to remove the water main design from the Scope of Services; and WHEREAS, the City and Consultant desire to amend the previous agreements to include final design assistance to the Iowa DOT for U.S. 63 improvements between Franklin Street and Newell Street in Waterloo, Iowa. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: 1. PROJECT DESCRIPTION The project consists of U.S. 63 improvements between Franklin Street and Newell Street in Waterloo, Iowa. The preliminary roadway design, including the conceptual plan for enhancements, Environmental Assessment and Location/Design Public Hearing were completed as part of the "Initial Design" services for the project. IL SCOPE OF SERVICES The Scope of Services includes final design assistance for the above project. It is understood that the Iowa DOT will complete all parts of the final design and construction plans for this project, except for those tasks specifically outlined in this scope of services. The following tasks are included in this scope. , AZCOM Page 2 Division 1: Roadway Design Assistance Task 1 - Roadway Lighting Design. This task consists of the final design of a roadway lighting system along U.S. 63 between Franklin Street and Newell Street. It is anticipated that the system will include intersection and mid -block lighting on both sides of the roadway. Two control stations are anticipated, one on each side of the Canadian National Railroad crossing. The lighting system will use the same type of poles, luminaires, colors and finishes that are selected for the Newell to Donald Street segment. No additional evaluation of lighting alternatives is included. Roadway lighting at signalized intersections will be part of the traffic signal system and is not included in this task. Task 2 - Railroad Bridge Enhancements. This task consists of the final evaluation of enhancement concepts and final design plans for the enhancements at and immediately adjacent to the Canadian National Railroad overpass. The design concepts for these enhancements were prepared during the initial design phase and include new bridge railings, abutment retaining wall and wing wall treatments, pier treatments, bridge beam coloring, modular block retaining walls and landscaping in the immediate vicinity of the bridge. This task is not included in the basic services, but will be added by Supplemental Agreement, if required. Task 3 - Roadway Landscaping. This task includes the conceptual and final design of roadway landscaping within the existing right-of-way of U.S. 63. It is anticipated that the landscaping concept will be similar to the design which was developed for the north segment between Newell Street and Donald Street, consisting of road side trees and plantings. This task also includes preparation of Special Provisions for any non-standard bid items. Additional streetscaping elements, such as decorative pavement, brick pavers, retaining walls, additional lighting, road side furniture and other amenities, will be added by Supplemental Agreement, if requested. This task isnot included in the basic services, but will be added by Supplemental Agreement, if required. Task 4 - Cost Estimates. This task includes preparation of any Engineer's Opinion of Probable Construction Cost for the portions of the project designed by the Consultant. Task 5 - Public Information Activities. This task includes participating in and attending public informational meetings for the project. The planning, preparation and conducting of public meetings will be completed by Iowa DOT. It is anticipated that AECOM representatives will attend one public informational meeting and two neighborhood meetings. Task 6 - Project Coordination and Meetings. This task includes ongoing coordination, exchange of information and attendance at meetings, as requested by the City throughout the final design phase. The extent of this task is represented by the estimated hours assigned to the task. Railroad coordination, as needed for the roadway and potential enhancements, is not included in this scope but will be added by Supplemental Agreement, if needed. Task 7 - Project Administration. This task includes in-house, project -related administrative activities throughout the duration of the project. Included are internal project management, internal project team meetings, correspondence, filing, budget management, invoicing, monthly reports and other project -related administrative activities. ACOM Page 3 Division 2: Sanitary Sewer Design Task 8 - Sanitary Sewer Design. This task consists of the final design for replacement of the existing sanitary sewers under the proposed new roadways. The City of Waterloo will provide a televised inspection of the existing sewers and will provide the results to the Consultant. Construction staging and maintenance of traffic plans are not included in this task but will be added by Supplemental Agreement, if requested. This task includes the following activities: • Review of televised inspection tapes, and making a recommendation on repair or replacement options to the City. • Field survey to determine depth of existing sewers, and base mapping of existing profiles. • Preparation of final design plan and profile sheets, determination of bid items, preparation of design tabulations, quantities and cost estimates, and submittal of electronic sheet files to the DOT for inclusion in the DOT's final plan set. The following segments of sanitary sewer are included n this scope: 12 -Inch Sanitary Sewer From Franklin Street to Mullan Avenue, Approximately 260 Feet in Length Sanitary Sewer and Manhole in Almond Street, Approximately 30 Feet in Length 12 -Inch Sanitary Sewer Crossing at Saxon Street, Approximately 100 Feet in Length 12 -Inch Sanitary Sewer Crossing at Dane Street, Approximately 120 Feet in Length 12 -Inch Sanitary Sewer Crossing Near Chestnut Street, Approximately 120 Feet in Length 15 -Inch Sanitary Sewer North of the Canadian National Railroad Overpass, Approximately 80 Feet in Length III. TIME OF BEGINNING AND COMPLETION Consultant shall not begin work under this agreement until so directed in writing by the City and they have received a copy of an executed agreement and a copy of the FHWA authorization. Work under this agreement shall be completed within eighteen (18) months after receipt of the documents noted above. IV. COMPENSATION The Consultant shall be reimbursed for the actual costs incurred in accordance with Article 3 of the original Agreement. The Estimated Actual Costs, Fixed Fee, Contingency and Maximum Amount Payable for this supplemental agreement, as stated below and as shown in Attachment A, are segregated from previous agreements. Division I Division II Estimated Actual Costs $53,500.00 $13,300.00 Fixed Fee 6,800.00 1,700.00 Contingency 00.00 00.00 Maximum Amount Payable $60,300.00 $15,000.00 V. In all other aspects, the obligations of the City and Consultant shall remain as specified in the Professional Services Agreement dated April 3, 2006, and subsequent amendments. A=COM Page 4 IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 5 as of the dates shown below: AECOM TECHNICAL PIPES, INC. Joe A. Becker Vice President CITY OF W j TERLOO, IOWA By Ernest G. Clark Mayor IOWA DEPARTMENT OF TRANSPORTATION ACCEPTED FOR AUTHORIZATION Date July 11, 2011 Date l �)L )5/ By Date Robert Welper, P.E. Local Systems Engineer District 2 L:\work\ADMIMAGREE\SU PPLE\SA5Hwy63.doc Attachment A U.S. HIGHWAY 63 IMPROVEMENTS FRANKLIN STREET TO NEWELL STREET WATERLOO, IOWA FINAL DESIGN ASSISTANCE Cost Analysis -Division I I. Direct Labor Cost (AECOM Technical Services) Category Hours Rate/Hour Amount Senior Professional 86 $82.00 $7,052.00 Project Professional 144 $54.80 $7,891.20 Staff Professional 24 $39.20 $940.80 Professional 0 $31.00 $0.00 CADD Operator 11 100 $29.25 $2,925.00 CADD Operator! 0 $20.25 $0.00 Senior Technician 0 $31.35 $0.00 Technician 0 $24.85 $0.00 Project Support 38 $26.30 $999.40 $19,808.40 392 ll. Payroll Burden and Overhead Provisional Costs 165.00% $32,683.86 111. Direct Project Expenses Category Units Rate/Unit Amount Mileage 400 $0.555 $222.00 B/W Copies 7000 $0.06 $420.00 Color Copies 300 $0.12 $36.00 Miscellaneous, Other $350.00 $1,028.00 IV. AECOM Technical Services Estimated Actual Costs $53,520.26 Rounded $53,500.00 V. Subcontract Expense na $0.00 VI. Estimated Actual Costs $53,500.00 VII. Fixed Fee $6,800.00 VIII. Contingency $0.00 AECOM Technical Services $0.00 na IX. Maximum Amount Payable $60,300.00 Attachment A U.S. HIGHWAY 63 IMPROVEMENTS FRANKLIN STREET TO NEWELL STREET WATERLOO, IOWA FINAL DESIGN ASSISTANCE Cost Analysis -Division 11 I. Direct Labor Cost (AECOM Technical Services) Category Hours Rate/Hour Amount Senior Professional 6 $82.00 $492.00 Project Professional 40 $54.80 $2,192.00 Staff Professional 0 $39.20 $0.00 Professional 0 $31.00 $0.00 CADD Operator II 64 $29.25 $1,872.00 CADD Operator I 0 $20.25 $0.00 Senior Technician 0 $31.35 $0.00 Technician 0 $24.85 $0.00 Project Support 14 $26.30 $368.20 $4,924.20 124 11. Payroll Burden and Overhead Provisional Costs 165.00% $8,124.93 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 100 $0.555 $55.50 B/W Copies 1000 $0.06 $60.00 Color Copies 100 $0.12 $12.00 Miscellaneous, Other $125.00 $252.50 IV. AECOM Technical Services Estimated Actual Costs $13,301.63 Rounded $13,300.00 V. Subcontract Expense na $0.00 VI. Estimated Actual Costs $13,300.00 VII. Fixed Fee $1,700.00 VIII. Contingency $0.00 AECOM Technical Services $0.00 na IX. Maximum Amount Payable $15,000.00 Attachment A U.S. HIGHWAY 63 IMPROVEMENTS FRANKLIN STREET TO NEWELL STREET WATERLOO, IOWA ANAL DESIGN ASSISTANCE STAFF HOUR ESTIMATE - AECOM Portion Description of Work Senior Prof. Project Prof. Staff Prof. CADD Operator II Project Support Total _._ Division_l:,_Roadway Design Assistance w ___.._......._ ................_.._ ..__....._....__-_-.._ _._._.__.._._._._._....._............_....._....._...._._._.___ 1 Roadway Lighting Design 6 60 1632 4 118 2 Railroad Bridge Enhancements 3 Roadway Landscaping 0 4 Cost Estimates 4 8 2 14 5 Public Information Activities 12 1212 2 38 6___ProieciCoordinationandMe-etings 48 52 56 10 166 Y? Project Administration ....._...._ ___._............_._....__._.._ ........._20 ....._......_ 16.._.._.._....._..._._.....__20__..._..._.._._ �56........ ._.__.__..-_ _....-___...__.._.____ _._......_.... ..._...._.....1 ..__......_..._� _._._.._._ ..... _ Division 1 Total 86 44 24.._._.___..100 38 392 Division 2: Sanitary Sewer Design., -_.-.__ ._ ._...-.-.._-_.-._.._..._.__.__..--_._._..__.._._.....^ ^ ^ _.....__...... _--..._. --....._._-.-------..._._. 8 Sanitary Sewer Design 6 40 64 14 124 Total Hours 92 184 24 164 52 516