Loading...
HomeMy WebLinkAboutAecom Technical Services-7/25/2011 (2)CITY OF WATERLOO DEPARTMENT OF ENGINEERING TRANSMITTAL 715 Mulberry Street Waterloo, IA 50703 DATE:8/8/11 TO: Maria Armstrong Transmitted herewith are: QUANTITY Contract No.790 wed -7/(25v1 PROJECT: NHSX-63-6(69)-3H-07 DESCRIPTION Agreement Change Order Contracts and Bonds Engineering Contract Maintenance Bond Plans and Specifications Punch List TV Reports One Original Supplemental Agreement No. 5 One Copy Each "Notice -To -Proceed" E-mail n n n n For your Action For your Approval For your Information For your signature Other M n n Per Your Request Per our Conversation For your review For your Files COMMENTS: Cc: Michelle Weidner w/attachments, Pauline Closson w/attachments, File w/attachments City Engineering Department By. Jeff B es, Associate Engineer A=COM AECOM 319 232 6531 tel 501 Sycamore Street 319 232 0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com U.S. HIGHWAY 63 IMPROVEMENTS FRANKLIN STREET TO NEWELL STREET FINAL DESIGN ASSISTANCE WATERLOO, IOWA SUPPLEMENTAL AGREEMENT NO. 5 WHEREAS, a Professional Services Agreement was entered into by the City of Waterloo, Iowa ("City"), and AECOM Technical Services, Inc., formerly Earth Tech, Inc. ("Consultant"), of Waterloo, Iowa, dated April 3, 2006, for the alternative evaluation, traffic analysis, environmental documentation, preliminary design, final design and construction review for improvements on U.S. Highway 63 between the U.S. 218 Interchange and Donald Street in Waterloo, Iowa; and WHEREAS, Preliminary Engineering (NHSX-63-6(69)-3H-07) was defined and authorized in said agreement dated April 3, 2006; and WHEREAS, the City and Consultant entered into Supplemental Agreement No. 1 dated July 27, 2007, for engineering services during the construction phase of the U.S. Highway 63 — Westfield Avenue Connection Project; and WHEREAS, the City and Consultant entered into Supplemental Agreement No. 2 dated December 14, 2007, to increase the Estimated Actual Costs for Task 15 — Management of Contaminated Subsurface Soil provided by Weston Solutions, Inc., due to delay in construction progress related to inclement weather conditions and management/disposal for excess spoil; and WHEREAS, the City and Consultant entered into Supplemental Agreement No. 3 dated August 19, 2010, to include the final design of a 4 -lane highway between Newell Street and Donald Street in Waterloo, Iowa, in accordance with the Preliminary Plans completed in November 2009; and WHEREAS, the City and Consultant entered into Supplemental Agreement No. 4 dated December 3, 2010, to remove the water main design from the Scope of Services; and WHEREAS, the City and Consultant desire to amend the previous agreements to include final design assistance to the Iowa DOT for U.S. 63 improvements between Franklin Street and Newell Street in Waterloo, Iowa. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: I. PROJECT DESCRIPTION The project consists of U.S. 63 improvements between Franklin Street and Newell Street in Waterloo, Iowa. The preliminary roadway design, including the conceptual plan for enhancements, Environmental Assessment and Location/Design Public Hearing were completed as part of the "Initial Design" services for the project. II. SCOPE OF SERVICES The Scope of Services includes final design assistance for the above project. It is understood that the Iowa DOT will complete all parts of the final design and construction plans for this project, except for those tasks specifically outlined in this scope of services. The following tasks are included in this scope. A=COM Page 2 Division l: Roadway Design Assistance Task 1 - Roadway Lighting Design. This task consists of the final design of a roadway lighting system along U.S. 63 between Franklin Street and Newell Street. It is anticipated that the system will include intersection and mid -block lighting on both sides of the roadway. Two control stations are anticipated, one on each side of the Canadian National Railroad crossing. The lighting system will use the same type of poles, luminaires, colors and finishes that are selected for the Newell to Donald Street segment. No additional evaluation of lighting alternatives is included. Roadway lighting at signalized intersections will be part of the traffic signal system and is not included in this task. Task 2 - Railroad Bridge Enhancements. This task consists of the final evaluation of enhancement concepts and final design plans for the enhancements at and immediately adjacent to the Canadian National Railroad overpass. The design concepts for these enhancements were prepared during the initial design phase and include new bridge railings, abutment retaining wall and wing wall treatments, pier treatments, bridge beam coloring, modular block retaining walls and landscaping in the immediate vicinity of the bridge. This task is not included in the basic services, but will be added by Supplemental Agreement, if required. Task 3 - Roadway Landscaping. This task includes the conceptual and final design of roadway landscaping within the existing right-of-way of U.S. 63. It is anticipated that the landscaping concept will be similar to the design which was developed for the north segment between Newell Street and Donald Street, consisting of road side trees and plantings. This task also includes preparation of Special Provisions for any non-standard bid items. Additional streetscaping elements, such as decorative pavement, brick pavers, retaining walls, additional lighting, road side furniture and other amenities, will be added by Supplemental Agreement, if requested. This task is not included in the basic services, but will be added by Supplemental Agreement, if required. Task 4 - Cost Estimates. This task includes preparation of any Engineer's Opinion of Probable Construction Cost for the portions of the project designed by the Consultant. Task 5 - Public Information Activities. This task includes participating in and attending public informational meetings for the project. The planning, preparation and conducting of public meetings will be completed by Iowa DOT. It is anticipated that AECOM representatives will attend one public informational meeting and two neighborhood meetings. Task 6 - Project Coordination and Meetings. This task includes ongoing coordination, exchange of information and attendance at meetings, as requested by the City throughout the final design phase. The extent of this task is represented by the estimated hours assigned to the task. Railroad coordination, as needed for the roadway and potential enhancements, is not included in this scope but will be added by Supplemental Agreement, if needed. Task 7 - Project Administration. This task includes in-house, project -related administrative activities throughout the duration of the project. Included are internal project management, internal project team meetings, correspondence, filing, budget management, invoicing, monthly reports and other project -related administrative activities. A=COM Page 3 Division 2: Sanitary Sewer Design Task 8 - Sanitary Sewer Design. This task consists of the final design for replacement of the existing sanitary sewers under the proposed new roadways. The City of Waterloo will provide a televised inspection of the existing sewers and will provide the results to the Consultant. Construction staging and maintenance of traffic plans are not included in this task but will be added by Supplemental Agreement, if requested. This task includes the following activities: • Review of televised inspection tapes, and making a recommendation on repair or replacement options to the City. • Field survey to determine depth of existing sewers, and base mapping of existing profiles. • Preparation of final design plan and profile sheets, determination of bid items, preparation of design tabulations, quantities and cost estimates, and submittal of electronic sheet files to the DOT for inclusion in the DOT's final plan set. The following segments of sanitary sewer are included n this scope: 12 -Inch Sanitary Sewer From Franklin Street to Mullan Avenue, Approximately 260 Feet in Length Sanitary Sewer and Manhole in Almond Street, Approximately 30 Feet in Length 12 -Inch Sanitary Sewer Crossing at Saxon Street, Approximately 100 Feet in Length 12 -Inch Sanitary Sewer Crossing at Dane Street, Approximately 120 Feet in Length 12 -Inch Sanitary Sewer Crossing Near Chestnut Street, Approximately 120 Feet in Length 15 -Inch Sanitary Sewer North of the Canadian National Railroad Overpass, Approximately 80 Feet in Length 111 TIME OF BEGINNING AND COMPLETION Consultant shall not begin work under this agreement until so directed in writing by the City and they have received a copy of an executed agreement and a copy of the FHWA authorization. Work under this agreement shall be completed within eighteen (18) months after receipt of the documents noted above. IV. COMPENSATION The Consultant shall be reimbursed for the actual costs incurred in accordance with Article 3 of the original Agreement. The Estimated Actual Costs, Fixed Fee, Contingency and Maximum Amount Payable for this supplemental agreement, as stated below and as shown in Attachment A, are segregated from previous agreements. Division I Division 11 Estimated Actual Costs $53,500.00 $13,300.00 Fixed Fee 6,800.00 1,700.00 Contingency 00.00 00.00 Maximum Amount Payable $60,300.00 $15,000.00 V. In all other aspects, the obligations of the City and Consultant shall remain as specified in the Professional Services Agreement dated April 3, 2006, and subsequent amendments. ACOM Page 4 IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 5 as of the dates shown below: AECOM TECHNICAL SERVICES, INC. By 175.9"1". Joe A. Becker Vice President CITY OF WATERLOO, IOWA By Ernest G. Clark Mayor IOWA DEPARTMENT OF TRANSPORTATION ACCEPTED FOR AUTHORIZATION Date July 11, 2011 Date goki a15,di) 1( By Date Robert Welper, P.E. Local Systems Engineer District 2 L:\work\ADM IN\AGREE\SUPPLE\SA5Hwy63.doc Attachment A U.S. HIGHWAY 63 IMPROVEMENTS FRANKLIN STREET TO NEWELL STREET WATERLOO, IOWA FINAL DESIGN ASSISTANCE Cost Analysis -Division I I. Direct Labor Cost (AECOM Technical Services) Category Hours Rate/Hour Amount Senior Professional 86 $82.00 $7,052.00 Project Professional 144 $54.80 $7,891.20 Staff Professional 24 $39.20 $940.80 Professional 0 $31.00 $0.00 CADD Operator II 100 $29.25 $2,925.00 CADD Operator I 0 $20.25 $0.00 Senior Technician 0 $31.35 $0.00 Technician 0 $24.85 $0.00 Project Support 38 $26.30 $999.40 $19,808.40 392 II. Payroll Burden and Overhead Provisional Costs 165.00% $32,683.86 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 400 $0.555 $222.00 B/W Copies 7000 $0.06 $420.00 Color Copies 300 $0.12 $36.00 Miscellaneous, Other $350.00 $1,028.00 IV. AECOM Technical Services Estimated Actual Costs $53,520.26 Rounded $53,500.00 V. Subcontract Expense na $0.00 VI. Estimated Actual Costs $53,500.00 VII. Fixed Fee $6,800.00 VIII. Contingency $0.00 AECOM Technical Services $0.00 na IX. Maximum Amount Payable $60,300.00 Attachment A U.S. HIGHWAY 63 IMPROVEMENTS FRANKLIN STREET TO NEWELL STREET WATERLOO, IOWA FINAL DESIGN ASSISTANCE Cost Analysis -Division II I. Direct Labor Cost (AECOM Technical Services) Category Hours Rate/Hour Amount Senior Professional 6 $82.00 $492.00 Project Professional 40 $54.80 $2,192.00 Staff Professional 0 $39.20 $0.00 Professional 0 $31.00 $0.00 CADD Operator II 64 $29.25 $1,872.00 CADD Operator I 0 $20.25 $0.00 Senior Technician 0 $31.35 $0.00 Technician 0 $24.85 $0.00 Project Support 14 $26.30 $368.20 $4,924.20 124 II. Payroll Burden and Overhead Provisional Costs 165.00% $8,124.93 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 100 $0.555 $55.50 B/W Copies 1000 $0.06 $60.00 Color Copies 100 $0.12 $12.00 Miscellaneous, Other $125.00 $252.50 IV. AECOM Technical Services Estimated Actual Costs $13,301.63 Rounded $13,300.00 V. Subcontract Expense na $0.00 VI. Estimated Actual Costs $13,300.00 VII. Fixed Fee $1,700.00 VIII. Contingency $0.00 AECOM Technical Services $0.00 na IX. Maximum Amount Payable $15,000.00 Attachment A U.S. HIGHWAY 63 IMPROVEMENTS FRANKLIN STREET TO NEWELL STREET WATERLOO, IOWA FINAL DESIGN ASSISTANCE STAFF HOUR ESTIMATE - AECOM Portion Description of Work Senior Prof. Project Prof. Staff Prof. CADD Operator II Project Support Total Division 1: Roadway Design Assistance 1 Roadway Lighting Design 6 60 16 32 4 118 2 Railroad Bridge Enhancements 0 3 Roadway Landscaping 0 4 Cost Estimates 4 8 2 14 5 Public Information Activities 12 12 12 2 38 6 Project Coordination and Meetings 48 52 56 10 166 7 Project Administration 20 16 20 56 Division 1 Total 86 144 24 100 38 392 Division 2: Sanitary Sewer Design 8 Sanitary Sewer Design 6 40 64 14 124 Total Hours 92 184 24 164 52 516 Page 1 of 2 JEFF BALES From: JEFF BALES Sent: Monday, August 08, 2011 5:40 PM To: 'Becker, Joe' Cc: Lentz, Bob; Welper, Robert [DOT]; ERIC THORSON; NOEL ANDERSON Subject: RE: Highway 63 Project (Franklin to Conger/Newell) - Supplemental Agreement No. 5 Joe, I looked at Bob Lentz's e-mail and that clarifies the "bid -ready plan sheets" matter. As you stated a copy of the FHWA authorization is not required to begin work. We will need a separation between Division I and Division II as the City is using two different sources of revenue. Attached is a copy of the signed agreement and per Bob Welper's e-mail below, his signature is not needed. Please consider this e-mail your "Notice -to -Proceed" with work under this Supplemental Agreement No. 5, effective Monday, August 8th, 2011. An original agreement will be sent to you in the mail. Jeff Bales Associate Engineer City of Waterloo 715 Mulberry Street Waterloo, Iowa 50703 319-291-4312 From: Becker, Joe [mailto:JOE.BECKER@aecom.com] Sent: Monday, August 08, 2011 1:46 PM To: JEFF BALES Cc: Lentz, Bob; Welper, Robert [DOT]; ERIC THORSON; NOEL ANDERSON Subject: RE: Highway 63 Project (Franklin to Conger/Newell) - Supplemental Agreement No. 5 Jeff, I will have Bob Lentz respond to your comment since he is the project manager providing the services for the project. From the comments below, it appears there is no federal funding in the agreement. Therefore, a copy of the FHWA authorization required to begin work is not available. Please confirm it is not needed to begin work. Since the work is funded at the City level, do you still want the separation between Division I and Division II. Thank you for your clarification is these matters. Joe From: JEFF BALES [mailto:JEFF.BALES@WATERLOO-IA.ORG] Sent: Monday, August 08, 2011 12:07 PM To: Becker, Joe Cc: Lentz, Bob; Welper, Robert [DOT]; ERIC THORSON; NOEL ANDERSON Subject: FW: Highway 63 Project (Franklin to Conger/Newell) - Supplemental Agreement No. 5 Joe, Per Bob Welper's e-mail, it is our interpretation that AECOM will provide the "bid -ready plan sheets" for this project, under Supplemental Agreement No. 5. Please respond to this e-mail noting that you concur with this interpretation, before I issue the notice -to -proceed. Thanks. 8/8/2011 Page 2 of 2 Jeff Bales Associate Engineer City of Waterloo 715 Mulberry Street Waterloo, Iowa 50703 319-291-4312 From: Welper, Robert [DOT] [mailto:Robert.Welper@dot.iowa.gov] Sent: Monday, August 08, 2011 11:16 AM To: JEFF BALES Cc: Mohorne, Willie [DOT]; Callahan, Mark [DOT]; Dumdei, Victoria [DOT]; Little, David [DOT]; Jia, Yanxiao [DOT]; Miller, Ryan [DOT] Subject: RE: Highway 63 Project (Franklin to Conger/Newell) Supplemental Agreement No. 5 Jeff, I reviewed AECOM's SA#5 with an eye toward the City's design responsibilities within City -State Agreement #2010-16-0424 for Segment #2: sanitary sewer, water distribution, street lighting, and "enhancements". All items are addressed either by inclusion or specific exclusion except for water distribution. As I recall, there was little or no water main concerns in this segment. Of course minor water system adjustments, such as relocating hydrants to the new back of curb, are included in the DOT's roadway design. Water main "up-sizing" or system relocations are not. Please note Agreement #2010-16-0424 requires review by the Department and submission of the City's plan sheets (for sewer, lighting, etc.) for incorporation into DOT's final plan set. This requirement to deliver bid -ready plan sheets for the included design tasks is not specifically stated in this agreement. In fact, there are no deliverables mentioned at all and one may interpret the statement "...the Iowa DOT will complete all parts of the final design and construction plans, except for those tasks specifically outlined..." to mean the DOT will accept AECOM's design results (design calculations, lighting component lists, etc.) and create plan sheets from those results. The Department will not be doing this. I suggest this issue be clarified in writing so the City can confirm what is and is not in this agreement. My signature is not needed on this agreement. The City may proceed as it sees fit. Bob From: JEFF BALES [mailto:JEFF.BALES@WATERLOO-IA.ORG] Sent: Monday, August 08, 2011 10:38 AM To: Welper, Robert [DOT] Subject: Highway 63 Project (Franklin to Conger/Newell) - Supplemental Agreement No. 5 Bob, As we discussed last Friday, attached is a copy of supplemental agreement no. 5, which AECOM had a blank for your signature. I've also attached a copy of the Council letter which shows we are not using any federal funds and all of it will be financed by bonds. If you decide to sign it, since it refers back to the original agreement, can you sign and send a pdf to me, so I can send a notice -to -proceed to them ? AECOM would like to get started. Thanks. Jeff 8/8/2011