HomeMy WebLinkAboutAecom Technical Services-7/18/2011 (4)CITY OF WATERLOO
DEPARTMENT OF ENGINEERING TRANSMITTAL
715 Mulberry Street Waterloo, IA 50703
DATE:8/15/11
Contract No.790
TO: Robert Welper, DOT PROJECT:NHSX-63-6(69)--3H-07
Transmitted herewith are:
QUANTITY
DESCRIPTION
Agreement
Change Order Contracts and Bonds
Engineering Contract
Maintenance Bond
Plans and Specifications
Punch List
TV Reports
One Original Subconsultant Agreement No. 2 between AECOM and CRLA
One Original
Subconsultant Agreement No. 2 between AECOM and Robinson Eng.
For your Action
For your Approval
For your Information
For your signature
Other
P1 Per Your Request
r] Per our Conversation
n For your review
For your Files
COMMENTS:
Cc: Clerk's Office w/originals, File w/copies
City Engineering Department
By. • � ,
Jeff Bales, Associate Engineer
A=COM
AECOM 319 232 6531 tet
501 Sycamore Street 319 232 0271 fax
Suite 222
Watertoo, Iowa 50703
www.aecom.com
U.S. HIGHWAY 63 IMPROVEMENTS
NEWELL STREET TO DONALD STREET
WATERLOO, IOWA
SUPPLEMENTAL AGREEMENT NO. 2
WHEREAS, Robinson Engineering Company and AECOM Technical Services, Inc. (ATS), formerly
Earth Tech, Inc., entered into a Subconsultant Services Agreement dated April 3, 2006, for the U.S.
Highway 63 Improvements from U.S. 218 to Donald Street in Waterloo, Iowa; and
WHEREAS, Robinson Engineering and ATS entered into Supplemental Agreement No. 1 dated
April 28, 2010, to include a portion of the final design of the segment from Newell Street to Donald
Street; and
WHEREAS, Robinson Engineering and ATS desire to amend the previous agreements to include
modifications to the storm sewer design of the segment from Newell Street to Donald Street.
NOW THEREFORE, it is mutually agreed to amend the original Subconsultant Services Agreement
as follows:
Project Description
The project consists of a new four -lane highway between Newell Street and Donald Street
in Waterloo, Iowa.
II. Scope of Services
The services to be provided for the project under this agreement will include additional
activities that have been requested by the City and which are beyond the scope of the
existing agreement.
Task 1. Storm Sewer Design Modifications. The original scope of services included the
design of a 10 -year frequency storm sewer system in accordance with the approved
preliminary design. This task will be completed by Robinson Engineering and includes the
following modifications to the existing scope:
A. Evaluate Alternative Storm Frequencies. This task includes the analysis of
storm runoff, inlet spacing and conceptual design layouts for a 5 -year storm, in
addition to the 10 -year storm which was included in the original scope.
B. Evaluate 1 -Side and 2 -Side Systems. To reduce the pipe sizes resulting from the
higher storm frequencies and to investigate construction staging alternatives, this
task includes preparation of separate design concepts for a 1 -sided storm sewer
system and a 2 -sided storm sewer system. This task includes development of pipe
sizes and preliminary alignments for each system.
C. Modify Storm Sewer Design Plans. Upon approval of the conceptual design, this
task includes modifications to the previously approved preliminary storm sewer
design. The completion of final storm sewer tabulations and quantities were
included in the original scope and are not included in this task.
A=COM
Page 2
The Subconsultant shall provide the services in accordance with the project schedule
developed by ATS's project manager for the project.
III. Compensation
The Subconsultant shall be reimbursed on a fixed unit rate basis in accordance with the
following cost summary:
Classification Hours Rate Amount
Senior Engineer 0 $103.00 $ 0.00
Engineer 128 86.00 11,008.00
Technician 0 70.00 0.00
Administrative 0 40.00 0.00
Subtotal 128 $11,008.00
Project Expenses 0.00
Total Estimated Cost (Rounded) $11,000.00
Contingency 0.00
Maximum Amount Payable $11,000.00
The compensation for this supplemental agreement is to be integrated with those covered
under Supplemental Agreement No. 1.
S.A. No. 1
S.A. No. 2 Revised Total
Estimated Actual Costs $30,200.00 $11,000.00 $41,200.00
Contingency 1,500.00 0.00 1,500.00
Maximum Amount Payable $31,700.00 $11,000.00 $42,700.00
IV. In all other respects, the obligation of the Subconsultant and ATS shall remain as specified
in the Subconsultant Services Agreement dated April 3, 2006, and subsequent
amendments.
IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 2 as
of the dates shown below:
ROBINSON ENGINEERING COMPANY
AECOM TECHNICAL SERVICES, INC.
L:\work\ADMIN\AGREE\SUPPLE\RobinsonSA2Hwy631m pr.doc
Date Z .A " 1 Z6 U
Date July 26, 2011
A=COM
AECOM 319 232 6531 tel
501 Sycamore Street 319 232 0271 fax
Suite 222
Waterloo, Iowa 50703
www.aecom.com
U.S. HIGHWAY 63 IMPROVEMENTS
NEWELL STREET TO DONALD STREET
WATERLOO, IOWA
SUPPLEMENTAL AGREEMENT NO. 2
WHEREAS, Craig Ritland Landscape Architects (CRLA), and AECOM Technical Services, Inc. (ATS),
formerly Earth Tech, Inc., entered into a Subconsultant Services Agreement dated April 5, 2006, for the
U.S. Highway 63 Improvements from U.S. 218 to Donald Street in Waterloo, Iowa; and
WHEREAS, CRLA and ATS entered into Supplemental Agreement No. 1 dated April 28, 2010, to include
landscape architectural design for the final design of the segment from Newell Street to Donald Street; and
WHEREAS, CRLA and ATS desire to amend the previous agreements to include additional enhancement
features to the segment from Newell Street to Donald Street.
NOW THEREFORE, it is mutually agreed to amend the original Subconsultant Services Agreement as
follows:
I. Project Description
The project consists of a new four -lane highway between Newell Street and Donald Street in
Waterloo, Iowa.
II. Scope of Services
The services to be provided for the project under this agreement will include landscape
architectural design services. The Subconsultant shall provide the services in accordance with the
project schedule developed by ATS's project manager for the project. The services are further
defined by the following tasks:
Task 3. Additional Enhancement Design This task includes the preliminary and final design of
additional enhancement features which will be added to the project as a result of additional
enhancement funding which has been obtained for the project. The additional enhancement
design will include:
A. Modify Grading and Landscaping, Logan School Area. This task includes changes to
the grading and landscaping plan as a result of the recent decision to remove the Logan
School Building and eliminate the retaining wall.
B. Modify Grading and Landscaping, Louise Street to Dale Street. This task includes
modifications to the grading and landscaping design to utilize the entire depth of lots which
are being acquired for the new right-of-way.
C. Neighborhood Monuments. This task includes final design and detailing of decorative
neighborhood monuments to be located at several of the intersection corners.
A=COM
Page 2
D. Brick or Stamped Concrete Treatments. This task includes the final design and detailing
of brick or colored/stamped concrete treatments at intersection locations. Included are the
sidewalk areas behind the curb at intersection returns and ends of raised medians. CRLA
will consider the ADA requirements when developing the conceptual plans.
E. Decorative Railing/Fence. This task includes the design of a decorative railing or fence
to be located along the new bikeway between Esther Street and Louise Street.
F. Wayfinding Signing. This task includes the conceptual and final design of special
wayfinding signs along U.S. 63. It is anticipated that special signs will be installed at the
Donald Street and Newell Street intersections.
G. Additional Landscaping Design (Bioswales). This task includes additional special
landscaping design and soil amendment design for the low -impact drainage features
(bioswales).
Task 4. Additional Lighting Design. This task includes additional analysis and design of an
enhanced lighting system beyond the scope and staff -hours included in the original contract.
Included are the evaluation of additional roadway lighting alternatives, final design of the roadway
lighting system and the design of a pedestrian lighting system along portions of the new sidewalks.
Task 8. Additional Project Meetings. The original project scope included six (6) project review
meetings with the Technical Advisory Committee. This task provides for an additional eight (8)
meetings to be held at the Waterloo City Hall.
Task 9. Additional Project Administration. This task includes the additional in-house, project -
related administrative activities associated with the additional services in this supplemental
agreement.
III. Compensation
The Subconsultant shall be reimbursed on a fixed unit rate basis in accordance with the following
cost summary:
Task Hour Estimate:
Description
Principal Associate
Landscape Architect Landscape Architect
3A - Logan School Area 12 36
3B - Louis Street to Dale Street 12 36
3C - Neighborhood Monuments 16 48
3D - Brick or Stamped Concrete 24 72
3E - Decorative Railing/Fence 4 36
3F - Wayfinding Signing 8 60
3G - Landscape Design (Bioswales) 8 24
4 - Lighting Design 16 40
8 - Project Meetings 16 24
9 - Project Administration 18 40
Total 134 416
AMOM
Page 3
Cost Estimate:
Hours Rate Amount
Principal Landscape Architect 134 $110.00 $14,740.00
Associate Landscape Architect 416 85.00 35,360.00
Reimbursable Expenses 400.00
Maximum Amount Payable $50,500.00
The compensation for this supplemental agreement is to be integrated with those covered under
Supplemental Agreement No. 1. The Maximum Amount Payable of $18,500.00 in Supplemental
Agreement No. 1 is increased by $50,500.00 to a revised Maximum Amount Payable of
$69,000.00.
IV. In all other respects, the obligation of the Subconsultant and ATS shall remain as specified in the
Subconsultant Services Agreement dated April 5, 2006, and subsequent amendments.
IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 2 as of the
dates shown below:
CRAIG RITLAND LANDSCAPE ARCHITECTS
AECOM TECHNICAL SERVICES, INC.
By
Joe A. Becker
L:\work\AD,> 1MAGREE\SUPPLE\CraigRitlandSA2Hwy63Impr.doc
7/12711
Date July 26, 2011