Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Failor Hurley Construction-7/18/2011
Inst. 'AIATM Document A101 — 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum 1 AGREEMENT made as of the Twenty -Second day of July in the year Two Thousand Eleven (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status, address and other information) City of Waterloo City Hall 715 Mulberry Street Waterloo, Iowa 50703 Telephone Number: 319-291-4301 Fax Number: 319-291-4286 and the Contractor: (Name, legal status, address and other information) Failor Hurley Construction PO Box 446 Hudson, IA 50643 Telephone Number: 319-230-3475 Fax Number: 319-988-9804 for the following Project: (Name, location and detailed description) 1 11050 Public Market Interior Development - General Construction BP2 The Architect: (Name, legal status, address and other information) INVISION Architecture PO Box 1800 Waterloo, IA 50704-1800 Telephone Number: 319.233.8419 Fax Number: 319.233.8419 The Owner and Contractor agree as follows. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A201 TM -2007, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. AIA Document A101 TM — 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:43:06 on 07/22/2011 under Order No.5896542442_1 which expires on 07/19/2012, and is not for resale. User Notes: (844776751) !nit TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement if it dimers from the date of this Agreement or, if applicable, state that the date will be fixed in a notice to proceed.) Commencement date will be fixed in a notice to proceed. If, prior to the commencement of the Work, the Owner requires time to file mortgages and other security interests, the Owner's time requirement shall be as follows: § 3.2 The Contract Time shall be measured from the date of commencement. § 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( ) days from the date of commencement, or as follows: (Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of commencement. If appropriate, insert requirements for earlier Substantial Completion of certain portions of the Work.) The completion date shall be no later than September 26, 2011. AIA Document A•10117° — 2007. Copyright O 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:43:06 on 07/22/2011 under Order No.5896542442_1 which expires on 07/19/2012, and is not for resale. User Notes: (844776751) Portion of Work Substantial Completion Date , subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to achieve Substantial Completion on time or for bonus payments for early completion of the Work) ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be Two Hundred Twelve Thousand Dollars and Zero Cents ($ 212,000.00 ), subject to additions and deductions as provided in the Contract Documents. § 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the bidding or proposal documents permit the Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires.) § 4.3 Unit prices, if any: (Identify and state the unit price; state quantity limitations, if any, to which the unit price will be applicable.) Item Units and Limitations Price Per Unit ($0.00) No unit prices § 4.4 Allowances included in the Contract Sum, if any: (Identify allowance and state exclusions, if any, from the allowance price.) Item No allowances Price ARTICLE 5 PAYMENTS § 5.1 PROGRESS PAYMENTS § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: § 5.1.3 Provided that an Application for Payment is received by the Architect not later than the Thirty-first day of a month, the Owner shall make payment of the certified amount to the Contractor not later than the Tenth day of the Following month. If an Application for Payment is received by the Architect after the application date fixed above, payment shall be made by the Owner not later than Thirty (30 ) days after the Architect receives the Application for Payment. (Federal, state or local laws may require payment within a certain period of time.) § 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to Init AIA Document A101 TM — 2007. Copyright © 1915, 1918, 1925, 1937,0 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the t maximum extent possible under the law. This document was produced by AIA software at 11:43:06 on 07/22/2011 under Order No.5896542442_1 which expires on 07/19/2012, and is not for resale. User Notes: (844776751) !nit substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of Five percent ( 5.00 %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute shall be included as provided in Section 7.3.9 of AIA Document A201TM-2007, General Conditions of the Contract for Construction; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of Five percent ( 5.00 %); .3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of AIA Document A201-2007. § 5.1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to the full amount of the Contract Sum, less such amounts as the Architect shall determine for incomplete Work, retainage applicable to such work and unsettled claims; and (Section 9.8.5 of AIA Document A201-2007 requires release of applicable retainage upon Substantial Completion of Work with consent of surety, if any.) .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of AIA Document A201-2007. § 5.1.8 Reduction or limitation of retainage, if any, shall be as follows: of it is intended prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting from the percentages inserted in Sections 5.1.6.1 and 5.1.6.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) § 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. § 5.2 FINAL PAYMENT § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2.2 of AIA Document A201 2007, and to satisfy other requirements, if any, which extend beyond final payment; and .2 a final Certificate for Payment has been issued by the Architect. § 5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final Certificate for Payment, or as follows: AIA Document A101 TM — 2007. Copyright ©1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:43:06 on 07/22/2011 under Order No.5896542442_1 which expires on 07/19/2012, and is not for resale. User Notes: (844776751) ARTICLE 6 DISPUTE RESOLUTION § 6.1 INITIAL DECISION MAKER The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A201-2007, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. (If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.) § 6.2 BINDING DISPUTE RESOLUTION For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A201 2007, the method of binding dispute resolution shall be as follows: (Check the appropriate box. If the Owner and Contractor do not select a method of binding dispute resolution below, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction) Arbitration pursuant to Section 15.4 of AIA Document A201-2007 Litigation in a court of competent jurisdiction Other (Specify) ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201-2007. § 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201-2007. ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A201-2007 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any.) § 8.3 The Owner's representative: (Name, address and other information) Buck Clark City Hall 715 Mulberry Street Waterloo, Iowa 50703 § 8.4 The Contractor's representative: AIA Document A101 " - 2007. Copyright O 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:43:06 on 07/22/2011 under Order No.5896542442_1 which expires on 07/19/2012, and is not for resale. User Notes: (844776751) Init. (Name, address and other information) William W Failor Failor Hurley Construction PO Box 446 Hudson, IA 50643 § 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. § 8.6 Other provisions: ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below. § 9.1.1 The Agreement is this executed AIA Document A101-2007, Standard Form of Agreement Between Owner and Contractor. § 9.1.2 The General Conditions are AIA Document A201-2007, General Conditions of the Contract for Construction. § 9.1.3 The Supplementary and other Conditions of the Contract: Document Title Date Pages § 9.1.4 The Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Title of Specifications exhibit: Exhibit A - Specification Section Title Date Pages § 9.1.5 The Drawings: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Title of Drawings exhibit: Exhibit B - Drawings Number § 9.1.6 The Addenda, if any: Title Date Number Date Pages 1 7/5/11 2 2 7/7/11 7 Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. § 9.1.7 Additional documents, if any, forming part of the Contract Documents: AIA Document A101 Tm — 2007. Copyright O 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:43:06 on 07/22/2011 under Order No.5896542442_1 which expires on 07/19/2012, and is not for resale. User Notes: (844776751) Inst. .1 AIA Document E201Tm-2007, Digital Data Protocol Exhibit, if completed by the parties, or the following: .2 Other documents, if any, listed below: (List here any additional documents that are intended to form part of the Contract Documents. AIA Document A201-2007 provides that bidding requirements such as advertisement or invitation to big Instructions to Bidders, sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) Contractor's Bid dated July 11, 2011 Performance Bond Payment Bond Certificate of Insurance ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A201-2007. (State bonding requirements, if any, and limits of liability for insurance required in Article 11 ofAL4 Document A201-2007.) Type of insurance or bond General Liability Automobile Liability Worker's Compensation Umbrella Liability This Agree ent entered into as Limit of liability or bond amount ($0.00) $1,000,000 Combined Single Limit per occurrence; $1,000,000 Aggregate $1,000,000 Combined Single Limit Statutory Benefits $100,000 Coverage B $1,000,000 Combined Single Limit; $2,000,000 Aggregate f the I .land year first written above. .4.,);LA> R (Signature CONTRACTOR (Signature) 1 Buck Clark, Mayor (Printed name and title) 116lr William W Failor, President (Printed name and title) AIA Document A101 T°° - 2007. Copyright ©1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:43:06 on 07/22/2011 under Order No.5896542442_1 which expires on 07/19/2012, and is not for resale. User Notes: (844776751) F17/13/2011 13:04 3192914297 r _ � WATERLOO LEISURE SER PAGE 03/23 FORM OF BID OR PROPOSAL PUBLIC MARKET INTERIOR DEVELOPMENT BID PACKAGE 2 - GENERAL CONSTRUCTION CITY OF WATERLOO, IOWA Honorable Mayor and City Council Waterloo, Iowa Gentlemen: 1. The undersigned, being a Corporation existing under the laws of the State ofAktl , a Partnership consisting of the following partners; having familiarized (himself) (themselves) (itself) with the existing conditions on the project area affecting the cost of the work, and with all the contract documents listed in the Table of contents and Addenda (if any), as prepared by iNViSION Architeccture and now on file in the office of the City Clerk, City Hall, Waterloo, lowa, hereby proposes to furnish all supervision, technical personnel, labor, materials, machinery, tools, appurtenances, equipment, and services, including utility and transportation services required to construct and complete this PUBLIC MARKET INTERIOR DEVELOPMENT, BID PACKAGE 2 - GENERAL CONSTRUCTION, all in accordance with the above -listed documents and for the bid and alternates. BASE. BID A_ Having examined the Place of The Work and ail matters referred to in the Instructions to Bidders and the Contract Documents prepared by iNVISION Architecture for the above mentioned project, we, the undersigned, hereby offer to enter into a Contract to perform the Work for the Base Bid listed in this bid form of dollars B, ($07p rF,_ ), in lawful money of the United States of America. C. We have included the required security deposit as required by the Instruction to Bidders. CONTRACT TiME A, The Final Completion date shall be no later than September 26, 2011. ALTERNATES - SEE SECTION 0123 00 A. Alternate No_ 1: Water Heater replacement. , ADD . 0A6 _ I r, f �a/ i�/�►,t;dollers. ), in lawful money of the United States of America. 2. It is understood that the quantities set forth are approximate only and subject to variation and that the unit bid price for the work done shall govern in the actual payment to the Contactor. 3. In submitting this bid, the bidder understands that the right Is reserved by the City of Waterloo, lows, tO reject any or all bids. If written notice of the acceptance of this bid is mailed, telegraphed, or delivered to the undersigned within thirty (30) days after the opening thereof, or at any time thereafter FORM OF BiD OR PROPOSAL Page 1 of 2 PUBLIC MARKET INTERIOR DEVELOPMENT 07/13/2011 13:04 3192914297 144 WATERLOO LEISURE SER PAGE 04/23 7 before this bid is withdrawn, the undersigned agrees to execute and deliver an agreement in the prescribed form and furnish the required bond and certificate of the insurance within ten (10) days after the agreement is presented to him for signature, and start work within ten (10) days after "Notice to proceed" is issued. 4. Security in the sum of 5-% Dollars ($ in the form of is 4 submitted herewith in accordance with the iNSTRUCTIONS TO BIDDERS. 5. Attached hereto is a Non -Collusion Affidavit of Prime Contractor. 6. Attached hereto is a Resident Bidder Certification. 7. The bidder is prepared to submit a -rrancial and experience statement upon request. B. The Prime Contractor and Subcontractor(s), which have performed an aggregate of $10,000.00 in workfor the City in the current calendar year, are prepared to submit an AAP or Update and an EOC, within ten (10) days of notification that the bid submitted is lowest and acceptable. 9. The bidder has received the following Addendum or Addenda: Addendum No. 1 Date 7/5/,(f 71..?fLl 10_ The bidder has filled in ail blanks on this proposal. Those blanks not applicable are marked "none" or "NA" It The bidder has attached ail applicable forms. C 77©At (Name of Bidder) (Date) AIG0,2 Official Address: (Including Trp Code): Tale: f e 44./ gag N r s©rpt c°7 vclfit_� I_R.S. No. e 1? FORM OF BID OR PROPOSAL. Page 2 of 2 PUBLIC MARKET INTERIOR DEVELOPMENT Exhibit A Specification Specification Sections Pages Division 00 - Procurement and Contracting Requirements 37 Division 01 - General Requirements 29 Division 05 - Metals 3 Division 06 - Wood, Plastics and Composites 10 Division 07 - Thermal and Moisture Protection 5 Division 08 - Openings 10 Division 09 - Finishes 12 Division 22 — Basic Plumbing 46 Division 23 — Basic HVAC 57 Division 26 - Electrical 56 Exhibit B Drawings Sheet No. Sheet Title Drawing Date General Architectural A0.0 Title Sheet June 28, 2011 A0.1 Opening Schedules, Elevations & Details June 28, 2011 A0.2 Demolition Plan June 28, 2011 A1.1 Floor Plan — General Construction June 28, 2011 A4.0 Interior Elevations June 28, 2011 A5.0 Platform Plan & Details June 28, 2011 A6.0 Reflected Ceiling Plan June 28, 2011 A7.0 Finish/Equipment Plan June 28, 2011 Code Review Electrical E1.0 Power and Lighting Plan June 28, 2011 E2.0 Electrical Schedules and Details June 28, 2011 MechanicaVElectrical ME1.0 Cover Sheet and Demolition Plan June 28, 2011 M1.0 Above Floor and Under Floor Piping Plan June 28, 2011 M2.0 HVAC Plan June 28, 2011 M3.0 Mechanical Schedules and Details June 28, 2011 Structural KE1.0 Kitchen HVAC Equipment Schedules and Details June 28, 2011 FAILO-1 OP ID: JT i4� Ro, CERTIFICATE OF LIABILITY INSURANCE °��` 07/125/1125/11 THIS CERTIFICATE 1S ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate hotder in lieu of such endorsement(s). PRODUCER 319-233-6103 622 SinnottW 4th S ., PO ,Inc. 319-234-8133 622 W 4th St PO Box 1878 Waterloo, IA 50704 Daniel Sinnott War Dan Sinnott PHONE 319-233-6103 FAX uuc, No. Erd): (arc, No): 319-234-8133 E-MAIL ADDREss: Dans@sinnottagency.com INSURERS) AFFORDING COVERAGE NAIC # INSURER A : Allied/Nationwide Insurance Co 42579 INSURED FAILOR HURLEY CONSTRUCTION PO BOX 446 HUDSON, IA 50634 INSURERS: ACP7142740029 �� c 06/04/12 INSURER D : $ 1,000,000 INSURER E : $ 100,000 INSURER F : COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. R LTRADDL TYPE OF INSURANCE JNSR SUBR MD POLICY NUMBER POLICY EFF (MMIDDJYYYY) POUCY EXP (MMJDDJYYYII) UMITS A GENERAL X UABIUTY COMMERCIAL GENERAL LIABu n -v X ACP7142740029 06/04/11 06/04/12 EACH OCCURRENCE $ 1,000,000 DAMAGE TO RENTED PREMISES (Ea occrmerrce) $ 100,000 CLAIMS -MADE X OCCUR MED EXP (Any one person) $ 5,000 PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE —1 POLICY X OMIT APPLIES JEgi PER: LOC PRODUCTS - COMP/OP AGG $ 2,000,000 $ A AUTOMOBILE X LIABILITY ANY AUTO ALL OWNED AUTOS HIRED AUTOS SCHEDULED AUTOS NON -OWNED AUTOS ACP7142740029 06/04/11 06104/12 COMBINED SINGLE OMIT (Ea accident) $ 1,000,000 BODILYINJURY(Perperson) $ BODILY INJURY (Per accident) $ PROPERTY DAMAGE (Per accident) $ $ A X UMBRELLA UAB EXCESS UAB X OCCUR CLAIMS -MADE ACP7142740029 06/04/11 06/04/12 EACH OCCURRENCE $ 4,000,000 AGGREGATE $ 4,000,000 DED RETENTION $ $ A WORKERS COMPENSATION AND EMPLOYERS UABILITY ANY PROPRIETOR/PARTNERIEXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory In NH) If yes, describe under DESCRIPTION OF OPERATIONS below Y / N N r A ACP7142740029 06/04/11 06/04/12 X TWCTLIATIU-S OR - E.L EACH ACCIDENT $ 500,000 E.L DISEASE - EA EMPLOYEE $ 500,000 E.L. DISEASE - POLICY LIMIT $ 500,000 A INLAND MARINE EQUIPMENT ACP7142740029 06/04/11 06/04/12 RENTED/ 60,000 LEASED Additional (a rat Schedule, PROJECT PUBUCCnMAR EST INTERIOR DEVELOPMENT2 GENERAL �ulrea) CONSTRUCTION CERTIFICATE HOLDER CANCELLATION CITYWLO CITY OF WATERLOO 715 MULBERRY ST WATERLOO, IA 50703 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE D ACORD 25 (2010/05) © 1988-2010 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD THE AMERICAN INSTITUTE OF ARCHITECTS Bond No.2146568 AIA Document A312 Performance Bond Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): Failor Hurley Construction, Inc. P.O. Box 446 Hudson, IA 50643 OWNER (Name and Address): City of Waterloo 715 Mulberry Street Waterloo, IA 50703 CONSTRUCTION CONTRACT Date: July 22, 2011 Amount: ($ 212,000.00 ) Two Hundred Twelve Thousand Dollars and 00/100 Description (Name and Ldcation):11050 Public Market Interior Development - General Construction BP2 SURETY (Name and Principal Place of Business): North American Specialty Insurance Company 650 Elm Street Manchester, NH 03101 BOND Date (Not earlier than Construction Contract Date): July 22, 2011 Amount: ($212,000.00 ) Two Hundred Twelve Thousand Dollars and 00/100 Modifications to this Bond: M None CONTRACTOR AS PRINCIPAL Company: Failor Hutley Constryction, Inc/ Signatu e• Name and Title: WI1.c.av w W. H4i`o,G /326SIAeg rT (Any additional signatures appear on page 3) (Corporate Seal) 0 See Page 3 SURETY Company: (Corpor ,� /h North American Specialty Insurance Com 1;"5P Signature• SEA 1973 Name and Tit e: Dianne S. Riley B ` h Attorney-in-Fact '%-40; * (FOR INFORMATION ONLY—Name, AGENT or BROKER: Holmes Murphy & Associates, Inc. 3001 Westown Parkway West Des Moines, IA 50266 515 223-6800 Address and Telephone) OWNER'S REPRESENTATIVE (Architect, Engineer or other party): INVISION Architecture P.O. Box 1800 Waterloo, IA 50704-1800 AIA DOCUMENT A312 • PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED. • AIA ® THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 THIRD PRINTING • MARCH 1987 A312-1984 1 °1 The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by reference. 2 If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond, except to participate in conferences as provided in Subparagraph 3.1. 3 If there is no Owner Default, the Surety's obligation under this Bond shall arise after: 3.1 The Owner has notified the Contractor and the Surety at its address described in Paragraph 10 below that the Owner is considering declaring a Contractor Default and has requested and attempted to arrange a conference with the Contractor and the Surety to be held not later than fifteen days after receipt of such notice to discuss methods of performing the Construc- tion Contract. If the Owner, the Contractor and the Surety agree, the Contractor shall be allowed a reason- able time to perform the Construction Contract, but such an agreement shall not waive the Owner's right, if any, subsequently to declare a Contractor Default; and 3.2 The Owner has declared a Contractor Default and formally terminated the Contractor's right to complete the contract. Such Contractor Default shall not be de- clared earlier than twenty days after the Contractor and the Surety have received notice as provided in Sub- paragraph 3.1; and 3.3 The Owner has agreed to pay the Balance of the Contract Price to the Surety in accordance with the terms of the Construction Contract or to a contractor selected to perform the Construction Contract in accor- dance with the terms of the contract with the Owner. 4 When the Owner has satisfied the conditions of Para- graph 3, the Surety shall promptly and at the Surety's ex- pense take one of the following actions: 4.1 Arrange for the Contractor, with consent of the Owner, to perform and complete the Construction Contract; or 4.2 Undertake to perform and complete the Construc- tion Contract itself, through its agents or through inde- pendent contractors; or 4.3 Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a contract for performance and completion of the Con- struction Contract, arrange for a contract to be pre- pared for execution by the Owner and the contractor selected with the Owner's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the amount of damages as described in Paragraph 6 in ex- cess of the Balance of the Contract Price incurred by the Owner resulting from the Contractor's default; or 4.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances: .1 After investigation, determine the amount for which it may be liable to the Owner and, as soon as practicable after the amount is deter- mined, tender payment therefor to the Owner; or .2 Deny liability in whole or in part and notify the Owner citing reasons therefor. 5 lithe Surety does not proceed as provided in Paragraph 4 with reasonable promptness, the Surety shall be deemed to be in default on this Bond fifteen days after receipt of an additional written notice from the Owner to the Surety demanding that the Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Subparagraph 4.4, and the Owner refuses the payment tendered or the Surety has denied liability, in whole or in part, without further notice the Owner shall be entitled to enforce any remedy available to the Owner. 6 After the Owner has terminated the Contractor's right to complete the Construction Contract, and if the Surety elects to act under Subparagraph 4.1, 4.2, or 4.3 above, then the responsibilities of the Surety to the Owner shall not be greater than those of the Contractor under the Construction Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construction Contract. To the limit of the amount of this Bond, but subject to commitment by the Owner of the Balance of the Contract Price to mitigation of costs and damages on the Construction Contract, the Sure- ty is obligated without duplication for: 6.1 The responsibilities of the Contractor for correc- tion of defective work and completion of the Construc- tion Contract; 6.2 Additional legal, design professional and delay costs resulting from the Contractor's Default, and re- sulting from the actions or failure to act of the Surety under Paragraph 4; and 6.3 Liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual dam- ages caused by delayed performance or non-perfor- mance of the Contractor. 7 The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the Con- struction Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators or successors. 8 The Surety hereby waives notice of any change, includ- ing changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obliga- tions. 9 Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work or part of the work is located and shall be instituted within two years after Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever oc- curs first. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation avail - AIA DOCUMENT A312 • PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED. • AIA THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON. D.C. 20006 THIRD PRINTING • MARCH 1987 A312-1984 2 able to sureties as a defense in the jurisdiction of the suit shall be applicable. 10 Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the sig- nature page. 11 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions con- forming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory bond and not as a common law bond. 12 DEFINITIONS 12.1 Balance of the Contract Price: The total amount payable by the Owner to the Contractor under the Construction Contract after all proper adjustments have been made, including allowance to the Con - MODIFICATIONS TO THIS BOND ARE AS FOLLOWS: tractor of any amounts received or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor is entitled, re- duced by all valid and proper payments made to or on behalf of the Contractor under the Construction Con- tract. 12.2 Construction Contract: The agreement between the Owner and the Contractor identified on the sig- nature page, including all Contract Documents and changes thereto. 12.3 Contractor Default: Failure of the Contractor, which has neither been remedied nor waived, to per- form or otherwise to comply with the terms of the Construction Contract. 12.4 Owner Default: Failure of the Owner, which has neither been remedied nor waived, to pay the Con- tractor as required by the Construction Contract or to perform and complete or comply with the other terms thereof. (Space is provided below for additional signatures of added parties, other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL Company: (Corporate Seal) Signature: Name and Title: Address: SURETY Company: (Corporate Seal) Signature Name and Title: Address: MA DOCUMENT A312 • PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED. • AIA . THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 THIRD PRINTING • MARCH 1987 A312-1984 3 THE AMERICAN INSTITUTE OF ARCHITECTS Bond No. 2146568 AIA Document A312 Payment Bond Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): Failor Hurley Construction, Inc. P.O. Box 446 Hudson, IA 50643 OWNER (Name and Address): City of Waterloo 715 Mulberry Street Waterloo, IA 50703 CONSTRUCTION CONTRACT Date: July 22, 2011 Amount: ($212,000.00 ) Two Hundred Twelve Thousand Dollars and 00/100 Description (Name and Location): 11050 Public Market Interior Development - General Construction BP2 SURETY (Name and Principal Place of Business): North American Specialty Insurance Company 650 Elm Street Manchester, NH 03101 BOND Date (Not earlier than Construction Contract Date): July 22, 2011 Amount: ($ 212,000.00 ) Two Hundred Twelve Thousand Dollars and 00/100 Modifications to this Bond: 0 None CONTRACTOR AS PRINCIPAL Company: (Corporate Seal) S g Narne�d Title: 1,4ALL.,4,.,i 1,2 A m,4. Me:Sudr (Any additional signatures appear on page 6) Failor Hurley Constructi��, Inc. i na u_: /i ir` .� SURETY Company: North America,. Specialty Insurance Signature Name and Title: Dianne S. 'ley Attomey-in-Fact 1 See Page 6 (FOR INFORMATION ONLY—Name, Address and Telephone) AGENT or BROKER: OWNER'S REPRESENTATIVE (Architect, Engineer or Holmes Murphy & Associates, Inc. other party): 3001 Westown Parkway INVISION Architecture West Des Moines, IA 50266 P.O. Box 1800 515 223-6800 Waterloo, IA 50704-1800 MA DOCUMENT A312 • PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1954 ED. • AIA THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 THIRD PRINTING • MARCH 1987 A312-1984 4 1 The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner to pay for labor, materials and equipment furnished for use in the perfor- mance of the Construction Contract, which is incorpo- rated herein by reference. 2 With respect to the Owner, this obligation shall be null and void if the Contractor: 2.1 Promptly makes payment, directly or indirectly, for all sums due Claimants, and 2.2 Defends, indemnifies and holds harmless the Owner from claims, demands, liens or suits by any person or entity whose claim, demand, lien or suit is for the payment for labor, materials or equipment fur- nished for use in the performance of the Construction Contract, provided the Owner has promptly notified the Contractor and the Surety (at the address described in Paragraph 12) of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suits to the Contractor and the Surety, and provided there is no Owner Default. 3 With respect to Claimants, this obligation shall be null and void if the Contractor promptly makes pay- ment, directly or indirectly, for all sums due. 4 The Surety shall have no obligation to Claimants under this Bond until: 4.1 Claimants who are employed by or have a direct contract with the Contractor have given notice to the Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and, with substantial accuracy, the amount of the claim. 4.2 Claimants who do not have a direct contract with the Contractor: .1 Have furnished written notice to the Con- tractor and sent a copy, or notice thereof, to the Owner, within 90 days after having last performed labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials were furnished or supplied or for whom the labor was done or performed; and .2 Have either received a rejection in whole or in part from the Contractor, or not received within 30 days of furnishing the above no- tice any communication from the Contractor by which the Contractor has indicated the claim will be paid directly or indirectly; and .3 Not having been paid within the above 30 days, have sent a written notice to the Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to the Contractor. 5 If a notice required by Paragraph 4 is given by the Owner to the Contractor or to the Surety, that is suffi- cient compliance. 6 When the Claimant has satisfied the conditions of Paragraph 4, the Surety shall promptly and at the Surety's expense take the following actions: 6.1 Send an answer to the Claimant, with a copy to the Owner, within 45 days after receipt of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed. 6.2 Pay or arrange for payment of any undisputed amounts. 7 The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety. 8 Amounts owed by the Owner to the Contractor under the Construction Contract shall be used for the perfor- mance of the Construction Contract and to satisfy claims, if any, under any Construction Performance Bond. By the Contractor furnishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfy obligations of the Contractor and the Surety under this Bond, subject to the Owner's prior- ity to use the funds for the completion of the work. 9 The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelat- ed to the Construction Contract. The Owner shall not be liable for payment of any costs or expenses of any Claim- ant under this Bond, and shall have under this Bond no obli- gations bl -gations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond. 10 The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations. 11 No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent juris- diction in the location in which the work or part of the work is located or after the expiration of one year from the date (1) on which the Claimant gave the notice required by Subparagraph 4.1 or Clause 4.2.3, or (2) on which the last labor or service was performed by anyone or the last mate- rials or equipment were furnished by anyone under the Con- struction Contract, whichever of (1) or (2) first occurs. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 12 Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the signature page. Actual receipt of notice by Surety, the Owner or the Contractor, however accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page. 13 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions con- forming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is that this AIA DOCUMENT A312 • PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED. • AIA& THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE.. N.W.. WASHINGTON. D.C. 20006 THIRD PRINTING • MARCH 1987 A312-1984 5 Bond shall be construed as a statutory bond and not as a common law bond. 14 Upon request by any person or entity appearing to be a potential beneficiary of this Bond, the Contractor shall promptly furnish a copy of this Bond or shall permit a copy to be made. 15 DEF1NMONS 15.1 Claimant: An individual or entity having a direct contract with the Contractor or with a subcontractor of .the Contractor. to furnish labor, materials or equip- ment for use in the performance of the Contract. The intent of this Bond shall be to include without limita- tion in the terms "labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment used in the Construction Contract, architectural and engineering services required for performance of the work of the Contractor and the Contractor's subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor, materials or equipment were furnished. 15.2 Construction Contract: The agreement between the Owner and the Contractor identified on the sig- nature page, including all Contract Documents and changes thereto. 15.3Owner Default: Failure of the Owner, -which has neither been remedied nor waived, to pay the Con- tractor as required by the Construction Contract or to perform and complete or comply with the other terms thereof. MODIFICATIONS TO THIS BOND ARE AS FOLLOWS: It is understood and agreed that this Bond is amended by the following: 1. Amended paragraphs 4.1 and 4.2.3 by adding at the end of each paragraph "and furnished to Surety an explanation of the claim and copies of documents on which the Claimant relies to support the claim" 2. Amend paragraph 5 by changing "or" to "and". 3. Paragraph 6 is deleted and replaced with: 6. When the Claimant has satisfied the conditions of paragraph 4 and has submitted any additional supporting documentation, and any sworn proof of claim, requested by the Surety, the Surety shall within 45 days respond to the Claimant and offer to pay or arrange for payment of any undisputed amount; provided, however, that the failure of the Surety to fully and/or timely discharge its obligations under this paragraph or to dispute or identify any specific defense to all or part of a claim shall not be deemed an admission of liability by the Surety or otherwise constitute a waiver of any rights or defenses the Contractor and/or Surety may have or acquire as to such claim. In no event shall the Surety's liability to any Claimant under this Bond exceed the sum properly due such claimant. (Space is provided below for additional signatures of added parties, other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL Company: SURETY (Corporate Seal) Company: (Corporate Seal) Signature: Signature - Name and Title: Name and Title: Address: Address: AIA DOCUMENT A312 • PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED. • AIA 0 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 THIRD PRINTING • MARCH 1987 A312-1984 6 01, aseilgb NAS SURETY GROUP NORTH AMERICAN SPECIALTY INSURANCE COMPANY WASHINGTON INTERNATIONAL INSURANCE COMPANY GENERAL POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS, THAT North American Specialty Insurance Company, a corporation duly organized and existing under laws of the State of New Hampshire, and having its principal office in the City of Manchester, New Hampshire, and Washington International Insurance Company, a corporation organized and existing under the laws of the State of New Hampshire and having its principal office in the City of Schaumburg, Illinois, each does hereby make, constitute and appoint Dianne S. Riley Its true and lawful Attorney -in -Fact, to make, execute, seal and deliver, for and on its behalf and as its act and deed, the following surety bond: Principal: Failor Hurley Construction, Inc. Bond Number: 2146568 Obligee: City of Waterloo Bond Amount: See Bond Form Bond Description: 11050 Public Market Interior Development - General Construction BP2 Provided that no bond or undertaking or contract of suretyship executed under this authority shall exceed the amount of: FIFTY MILLION ($50,000,000) DOLLARS This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of Directors of both North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held on the 24th of March, 2000: "RESOLVED, that any two of the Presidents, any Managing Director, Senior Vice President any Vice President any Assistant Vice President, the Secretary or any Assistant Secretary be, and each or any of them hereby is authorized to execute a Power of Attorney qualifying the attorney named in the given Power of Attorney to execute on behalf of the Company bonds, undertakings and all contracts of surety, and that each or any of them hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Company; and it is FURTHER RESOLVED, that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be binding upon the Company when so affixed and in the future with regard to any bond, undertaking or contract of surety to which it is attached." ow* SEAL -19. a 1973 w *-• 4:181 s4pepte 4441:040 By Steven P. Anderson, President & Odef Executive Officer or Washingnm International Insurance Company & Senior Vice President °Mortis American Specialty iSSIIMICO Company 4e,e, David M. Layman, Senior Vice President of 2 IMCiarmtional Insurance Company By & vice President ofNorth American SpecWty Insurance Company IN WITNESS WHEREOF, North American Specialty Insurance Company and Washington International Insurance Company have caused their official seals to be hereunto affixed, and these presents to be signed by their authorized officers this 16th day of September 20 JL.. North American Specialty Insurance Company Washington International Insurance Company State of Illinois County of Cook ss' On this 1611i day of September 20 10 , before me, a Notary Public personally appeared Steven P. Anderson , President and ao of Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company and David M. Layman , Senior Vice President of Washington International Insurance Company and Vice President of North American Specialty Insurance Company, personally known to me, who being by me duly swom, acknowledged that they signed the above Power of Attorney as officers of and acknowledged said instrument to be the voluntary act and deed of their respective companies. koma Donna D. Sklens, Notary Public I, James A. Carpenter , the duly elected Assistant Secretary of North American Specialty Instuance Company and Washington International Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power ofAttorney given by said North American Specialty Insurance Company and Washington International Insurance Company, which is still in full force and effect. IN WITNESS WHEREOF, I have set my hand and affixed the seals of the Companies this22nd day of July ,2011 James A. Carpentes,&e President & ARS ashington Intematiomd Insurance Company & Assistant Secretary of North American Specialty Insurance Company