HomeMy WebLinkAboutIowa Northland Regional Council of Govenrments-6/27/2011GRANT APPLICATION
MEMORANDUM OF UNDERSTANDING
This memorandum of understanding is between the City of Waterloo, Iowa hereinafter referred to
as City, and the Iowa Northland Regional Council of Governments, hereinafter referred to as
INRCOG.
WHEREAS, the City wishes to engage INRCOG's grant writing services for the following
project:
Type of Grant: State Recreational Trails Program
Project Description: Cedar Valley Lakes Trail Enhancement and
Water Trail Connection
INRCOG will not charge the City in advance for grant preparation services; however, in the
event that State Recreational Trails funding is awarded for this project, INRCOG will submit a
grant preparation invoice in the amount of one and one-half percent of the funds awarded
(maximum $2,000.00), to be paid by the City from local funds. It is further understood that the
City will provide budget information and graphic materials necessary for the submittal of this
grant by June 15, 2011.
IN WITNESS WHEREOF, INRCOG and Ills City of Waterloo, Iowa have executed this
memorandum of understanding as of this day of June, 2011.
City of Waterloo, Iowa
BY:
rlayor
A'1"PEST: p-_,17:7ti
Iowa Northland Regional Council of Governments
BY:
Executive Director
A1"1'EST: �'�
Required Documentation and Narrative Information
The following documents and narratives must be attached to this application. In the upper right-hand comer of each
document or narrative write the corresponding letter shown below.
® A.
® B.
® C.
® D.
® E.
® F.
A NARRATIVE assessing existing conditions, outlining the concept of the proposed project, and providing
adequate project justification. The narrative must show that the concept is reasonable from a transportation
engineering and/or recreational standpoint and is part of an area -wide, local, regional, or statewide plan.
A MAP identifying the location of the project — An optional mapping application tool is available for your use
at the following website address: www.sysplan.dotstate.ia.us/fedstate_rectrails.htm
A CROSS-SECTION of the proposed trail project.
A SKETCH -PLAN of the trail project.
An ITEMIZED BREAKDOWN of the total project costs.
A TIME SCHEDULE for the total project development.
® G. An OFFICIAL ENDORSEMENT of the trail proposal from the authority to be responsible for the
maintenance and operation. The authority must provide written assurance that it will adequately maintain
the trail for its intended use and maintain the total trail used to justify the project in public use for a minimum
of 20 years following project completion.
® H. A NARRATIVE discussing the extent to which adjacent property owners have been informed of the
proposed project and an assessment of their acceptance.
1. Completed Minority Impact Statement attached to application
The award of State Recreational Trails funds; any subsequent funding or letting of contracts for design, construction,
reconstruction, improvement, or maintenance; and the fumishing of materials for this project shall not involve direct or
indirect interest of any state, county, or city official, elective or appointive. All of the above are prohibited by Iowa
Code Sections 314.2, 362.5, or 331.342. Any award of funding or any letting of a contract in violation of the foregoing
provisions shall invalidate the award of State Recreational Trails funding and authorize a complete recovery of any
funds previously disbursed.
Certification
To the best of my knowledge and belief, all information included in this application is true and accurate, including the
commitment of all physical and financial resources. This application has been duly authorized by the participating
local authority. I understand the attached OFFICIAL ENDORSEMENT(S) binds the participating local govemments to
assume responsibility for adequate maintenance of any new or improved trails.
I understand that, although this information is sufficient to secure a commitment of funds, an executed contract
between the applicant and the Department is required prior to the authorization of funds.
Represer the Ci of Waterloo, Iowa
Signature
Ernest G. Clark, Mayor
Typed Name and Title
Exhibit A-3
Date
June 13, 2011
Date
Oh Iowa Department of Transportation
Form 105101 (03-09)
MINORITY IMPACT STATEMENT
Pursuant to 2008 Iowa Acts, HF 2393, Iowa Code Section 8.11, all grant applications submitted to the
state of Iowa that are due beginning January 1, 2009 shall include a Minority Impact Statement. This is
the state's mechanism for requiring grant applicants to consider the potential impact of the grant projects
proposed programs or policies on minority groups.
Please choose the statement(s) that pertains to this grant application. Complete all the
information requested for the chosen statement(s). Submit additional pages as necessary.
❑ The proposed grant project programs or policies could have a disproportionate or unique positive
impact on minority persons.
Describe the positive impact expected from this project.
Indicate which group is impacted:
❑ Women ❑ Persons with a disability ❑ Blacks ❑ Latinos 0 Asians
❑ Pacific Islanders ❑ American Indians 0 Alaskan Native Americans ❑ Other
0 The proposed grant project programs or policies could have a disproportionate or unique negative
impact on minority persons.
Describe the negative impact expected from this project.
Present the rationale for the existence of the proposed program or policy.
Provide evidence of consultation with representatives of the minority groups impacted.
Indicate which group is impacted:
❑ Women 9 Persons with a disability 9 Blacks 9 Latinos
❑ Asians
9 Pacific Islanders 9 American Indians 9 Alaskan Native Americans 9 Other
The proposed grant project programs or policies are not expected to have a disproportionate or
unique impact on minority persons.
Present the rationale for determining no impact. This project involves improvements to an existing
recreation trail in conjunction with the connection of two designated water trails, each of which will be
open and accessible to all persons. To that end, we do not expect this project to have a disproportionate or
unique impact on minority persons.
I hereby certify that the information on this form is complete and accurate, to the best of my knowledge:
Name: Ernest G. Clark
Title: Mayor
Definitions
"Minority Persons," as defined in Iowa Code Section 8.11, means individuals who are women, persons
with a disability, Blacks, Latinos, Asians or Pacific Islanders, American Indians, and Alaskan Native
Americans.
"Disability," as defined in Iowa Code Section 15.102, subsection 7, paragraph "b," subparagraph (1):
b. As used in this subsection:
(1) "Disability" means, with respect to an individual, a physical or mental impairment that
substantially limits one or more of the major life activities of the individual, a record of physical
or mental impairment that substantially limits one or more of the major life activities of the
individual, or being regarded as an individual with a physical or mental impairment that
substantially limits one or more of the major life activities of the individual.
"Disability" does not include any of the following:
(a) Homosexuality or bisexuality.
(b) Transvestism, transsexualism, pedophilia, exhibitionism, voyeurism, gender identity disorders
not resulting from physical impairments or other sexual behavior disorders.
(c) Compulsive gambling, kleptomania, or pyromania.
(d) Psychoactive substance abuse disorders resulting from current illegal use of drugs.
"State Agency," as defined in Iowa Code Section 8.11, means a department, board, bureau, commission,
or other agency or authority of the state of Iowa.
Preliminary Construction Cost Estimate
Cedar Valley Lakes Trail Bridge Enhancement and
Brinker Lake -Cedar River Connection
City of Waterloo
June 16, 2011
Item
No.
Item Description
Unit
Unit
Cost
Quantity
Cost
1
Clearing and Grubbing
ACRE
$30,000.00
0.5
$15,000.00
2
Existing Pavement Removal
SY
$8.00
750.0
$6,000.00
3
Topsoil, Provide
CY
$15.00
500.0
$7,500.00
4
Class 10 Excavation (Recreational Trail)
CY
$10.00
7,000.0
$70,000.00
5
Class 10 Excavation (Channel)
CY
$25.00
4,000.0
$100,000.00
6
Recreational Trail Paving
SY
$35.00
750.0
$26,250.00
7
Recreational Trail Bridge (115 ft length)
LS
$205,000.00
1.0
$205,000.00
8
Existing Structure Removal
LS
$1,000.00
1.0
$1,000.00
9
Slope Protection - Class E Rip Rap (Embankment)
TON
$35.00
2,200.0
$77,000.00
10
Channel Protection - Class E Rip Rap
TON
$35.00
2,000.0
$70,000.00
11
Engineering Fabric
SY
$2.50
5,000.0
$12,500.00
12
Mobilization
LS
$30,000.00
1.0
$30,000.00
13
Contingency - 15%
LS
$93,000.00
1.0
$93,000.00
Construction Cost Subtotal
$713,250.00
Survey, Design, Staking and CE
$142,700.00
Estimated Project Total Cost $855,950.00