HomeMy WebLinkAboutVoltmer Inc-6/6/2011Contract No.: 28149 Kind of Work: Traffic Signals Contractor. Voltmer Inc. CITY OF WATERLOO, IOWA Traffic Operations Department CONTRACT MODIFICATION No. 1 Traffic Operations Project Number. TRF -147 Project No: CS -TSF -8155(707)- -85-07 Date Prepared: March 7. 2011 The above referenced contract between City of Waterloo and Voltmer Inc. is hereby modified as described in this Modification document. A - Description of change to be made or extra work to be done: 1- Change order for a detour signing. 2- Change order for work on a manhole adding a ring and taking out the the cone section. 3- Drain tile work 4- Pavement markings B — Reason for change or extra work: 1- Required for construction activities on the right turn island at SW comer. Right turns are not allowed onto US 63 south at the intersection during this phase of work. Cost includes removing conflicting signs. 2- Originally missed by the consultant. 3- To address and issue with a drain tile that was found when the subcontractor dug the bore pits for the jacked drain pipe. 4- Pavement markings had been omitted from bidding because of paint shortage. (Continued on r j . e side Approved: strict 2 Local ystems EaPBer Date Project Engineer Date Receipt is acknowledged of this modification and terms of settlement are hereby agreed to. For City of Waterloo: For Cont : dor: Name: Signature: Date: Name: Q/J Signature: ' ,� 4 Ik Title: )6IZS.�Q./".� Date: 4/00 /// C-1 —Settlement for cost of work to be made as follows: 1- $1,193.00 added to the existing lump sum price of $3,100.00 for traffic control. New price is $4,293.00. 2- $4,966.50 3- $2,024.00 4- $8,012.76 C-2 — Justification for cost(s) 1 -Requires providing three new signs, installation, maintanace and removal of conflict signing. The price appears to be fair for the detour. 2- Higher cost than normal is jusftified of delivery charges for rushing small quantities of materia, lost time for crew and administrative time to come up with the solution. 3- Breakdown of prices appear reasonable for the size of the job. 4- Unit prices are reasonable based on the Traffic Operation's knowledge of similar activities. Higher cost of mobilization of this activity is for traffic central. U.S. 634s a state highway and you must close portions at -a time and keep it open to traffic and estabtish traffic control per Iowa DOT standards. D - ITEMS INCLUDED IN CONTRACT Change No. Line Item Number Unit Price Quantity Amount 7001 24 4,293.00 1.00 4,293.00 7 Unit Price .xxx Quantity .xxx Amount .xx 8001 7 31 2435- 4,966.500 1.000 7 ADJUSTMENT, MINOR 0600010 7 8002 DRAIN TILE WORK 32 TOTAL 4,293.00 E - ITEMS NOT INCLUDED IN CONTRACT It Credit, Add "CR" Change No. Item Description Item Number Function Code Unit Price .xxx Quantity .xxx Amount .xx 8001 MANHOLE 31 2435- 4,966.500 1.000 4,966.50 ADJUSTMENT, MINOR 0600010 8002 DRAIN TILE WORK 32 2599- 2,024.000 1.000 2,024.000 9999010 8003 PAINTED PAV'T MARK, 22 2527- 108.000 34.97 3,776.00 WATERBORNE/SOLVENT 9263109 8003 PRE-CUT 23 2527- 406.000 6.000 2,436.00 SYMBOL+LEGEND, PREFORM POLYMER 9263154 8003 PAVEMENT MARKING 33 2599- 1,800.000 1.000 1,800.00 MOBILIZATION 9999010 TOTAL 15,002.5 Contract No.: 28149 CITY OF WATERLOO, IOWA Traffic Operations Department CONTRACT MODIFICATION No. 1 Traffic Operations Project Number. TRF -147 Project No: CS -TSF -8155(707)- -85-07 IGnd of Work: Traffic Signals Date Prepared: March 7. 2011 Contractor. Voltmer Inc. The above referenced contract between City of Waterloo and Voltmer Inc. is hereby modified as described in this Modification document. A - Description of change to be made or extra work to be done: 1- Change order for a detour signing_ 2- Change order for work on a manhole adding a ring and taking out the the cone section. 3- Drain tile work 4- Pavement markings B — Reason for change or extra work: 1- Required for construction activities on the right tum island at SW comer. Right tums are not allowed onto US 63 south at the intersection during this phase of work. Cost includes removing conflicting signs. 2- Originally missed by the consultant. 3- To address and issue with a drain tile that was found when the subcontractor dug the bore pits for the jacked drain pipe. 4- Pavement markings had been omitted from bidding because of paint shortage. (Continued on reverse side Approved: District 2 Local Systems Engineer Date Project Engineer Date Receipt is acknowledged of this modification and terms of settlement are hereby agreed to. For City of Waterloo: For Contractor. Name: Signature: Date: Liz Name: Signature: Title: Date: C-1 -Settlement for cost of work to be made as follows: 1- $1,193.00 added to the existing lump sum price of $3,100.00 for traffic control. New price is $4,293.00. 2- $4,966.50 3- $2,024.00 4- $8,012.76 C-2 — Justification for cost(s) 1 -Requires providing three new signs, installation, maintanace and removal of conflict signing. The price appears to be fair for the detour. 2- Higher cost than normal is jusftified of delivery charges for rushing small quantities of materia, lost time for crew and administrative time to come up with the solution. 3- Breakdown of prices appear reasonable for the size of the job. 4- Unit prices are reasonable based on the Traffic Operation's knowledge of similar activities. Higher cost of mobilization of this activity is for traffic control. U.S. 63 is a state highway and you must close portions at a time and keep it open to traffic and establish traffic control per Iowa DOT standards. D - ITEMS INCLUDED IN CONTRACT Change No. Line Item Number Unit Price Quantity Amount 7001 24 4,293.00 1.00 4,293.00 7 Unit Price .xxx Quantity .root Amount .xx 8001 7 31 2435- 4,966.500 1.000 7 ADJUSTMENT, MINOR 0600010 7 8002 DRAIN TILE WORK 32 TOTAL 4,293.00 E - ITEMS NOT INCLUDED IN CONTRACT If Credit, Add "CR' Change No. Item Description Item Number Function Code Unit Price .xxx Quantity .root Amount .xx 8001 MANHOLE 31 2435- 4,966.500 1.000 4,966.50 ADJUSTMENT, MINOR 0600010 8002 DRAIN TILE WORK 32 2599- 2,024.000 1.000 2,024.000 9999010 8003 PAINTED PAV'T MARK, 22 2527- 108.000 34.97 3,776.00 WATERBORNE/SOLVENT 9263109 8003 PRE-CUT 23 2527- 406.000 6.000 2,436.00 SYMBOL+LEGEND, PREFORM POLYMER 9263154 8003 PAVEMENT MARKING 33 2599- 1,800.000 1.000 1,800.00 MOBILIZATION 9999010 TOTAL 15,002.5