HomeMy WebLinkAboutPlumb Tech Inc/KW Electric-2/7/2011CITY OF WATERLOO Council Communication City Council Meeting: February 7,2011 Prepared: February 1, 2011 Dept. Head Signature: # of Attachments: 1 SUBJECT: Flood Mitigation for Various Buildings Change Order #1 Submitted by: Craig Clark Interim Building Official/Maintenance Administrator Approve recomme dation of award of chane order #1 in theam Recommended Ci ounce Action ' �� � Dunt $64,185.00-0 PP 9 Ptamtrfiech Tric: of Water�`oo IA, in-Conjunction—With-Chi/ of Waterloo Flood Mitigation for City Buildings, be received, placed on file and adopted. Approve recommendation of award of change order #1 in the amount $1550.00 to KW ttric Inc. oTWaterIoo1A, in conjunction with City ofWaterloo flood -Mitigation for'City Buildings, be received, placed on file and adopted. Summary Statement Expenditure Required $65,736.00 Source of Funds FEMA funds for flood mitigation Background Information: After reviewing the FEMA paperwork and meeting with FEMA representative it was determined that funding was available for other pumps that were outside of the original contract. Dg/31/2011 07:39 PAX cifc4 mW Plumb Tech CMS . 25? t/L�' AIRZ NE HW y ... G'! 4 TERL-00 IA 50703 Ph (349) 233-56?ii 6 plumbtech@ptinc us a Fax (319) 233-5737 �io001/0001 QUOTATION January 21, 2011 To: City of Waterloo Attn: Jeff Re: Sump Pumps Revised Due to a mistake on the part of my supplier one of the sump ip and pit was left out. This is a breakdown and new pricing fo and pits located between two locations for the: city of Waterk . .urry tor the inconvenience. Police Elevator: $ 20,280.00 City Hall Elevator: $ 14,685.00 Vault Area: $ 12905.00 Libraiy Elevator: $ 12,905.00 Total: $ 60,775.00 If you have any questions call 233-5616. Plumb Tech, Inc. Zach Behrends aq..s'!'6 3261 W1RLINE HWY: WATERLOO' IA 50703 <• Pl7(319) 233-5516 !u btectt@ptT hitsFax: (319) 233-5737 QUOTA770N November 18, 2010 To: Modus Attn: Travis Re: Flood Mitigation. Library We propose to famish the labor and materials. to route the sump pump line into the men's restroom and tie it into the storm sewer lorated in the outside wall. We have included the extra piping and wall cut and patch in our quote. Quote: $1,725.00 Youth Pavilion We propose to furnish the labor and materials to reroute a sanitary sewer line that runs directly in the center of were our pit needs to go. We have included all the necessary pipe, fitting and excavation to reroute the piping. Quote: $1.,685.00 If you have any questions call 233-5616. Plumb Tech, Inc. 72ch Behrends Electric Inc. 1127 Lincoln Street P.O. Box 967 Cedar Falls, Iowa 60613 htflwwk-weectic.�m Phone (319) 277-0415 Fax (319) 277-1418 Date: January 26, 2011 To: City of Waterloo Attn: Jeff RE: Sump pump wiring Jeff, We propose propose to install the wiring for the sump pumps for $1,bou.vu. Jae J.I.A.:,a4.-Lual 04.1.= the Library, City Hall, Police Dept in City Hall, and Records room in City Hall. Sump pumps and controls provided by others. If you have any questions please call. Brian Deyries EstimAtor/Project Manager