HomeMy WebLinkAboutPeterson Contractors Inc-1/24/2011CHANGE ORDER NO. 7 Owner City of Waterloo Date January 7, 2011 Project FY 2010 River Renaissance Lower Plaza Owner's Contract No. 763 Contractor Peterson Contractors Inc. Date of Contract Start April 15, 2010 $ 3.189.424.95 You are directed to make the following changes in the Contract Documents. Description: 7-1 Standpipe Connections TOTAL ADDITIONS $29,500.00 $29,500.00 Reason for Change Order. 6-1 The Waterloo Fire Department requested the additional standpipe hydrant connections after completion of design and bidding for the project. The proposed connection will include 2 connections at the lower level of the large retaining wall with pipe connections to the upper level where two 2 -way brass fire outlets will be constructed in the planter beds. CONTRACT PRICE CONTRACT TIMES To Substantial To Final Completion Completion Original: $ 3,189.424.95 Original Completion Date: 11/30/2010 12/31/2010 Previous C.O.s (ADD/B€944€T): $ 99.069.35 Revised Completion Date: No Chang No Change This C.O. (ADDIDE914(4-): $ 2 500.00 Contract Price with all approved Change Orders: $ 3.317.994.30 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no fluffier time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPRO By: Owner (Authorized Signature) 1-A4--,9011 Date P-1 -/t Contractor (Authorized Signature) Date vA 1 - -► Date L:\work\project1601551281eng\Change Orders\Lower Plaza CO#7.docx AECOM 60155128 / 7 Project No. Change Order No. CITY OF WATERLOO Council Communication City Council Meeting: January 24, 2011 Prepared: January 19, 2011 Dept. Head Signature: Eric Thorson, PE, City Engineer # of Attachments: SUBJECT: CHANGE ORDER NO. 7 - $29,500.00 INCREASE F.Y. 2.010 RIVER RENA[SSANCE LOWER PIAZA. Contract No. 763 PETERSON CONTRACTORS, INC. Submitted by: Jamie Knutson, P.E., Associate Engineer Recommended City Council Action: Staff has reviewed this Change Order and recommends that the Mayor be authorized to sign it on behalf of the City. Summary Statement Change Order No. 7 is for the increased amount of $29,500.00. This change order is for additional standpipe connections. Expenditure Required Source of Funds Solid Waste Distributions Policy Issue N/A Alternative N/A Background Information The Waterloo Fire Depaituient requested the additional standpipe hydrant connections after completion of design and bidding for the project. The proposed connection will include two connections at the lower level of the large retaining wall with pipe connections to the upper level where two, 2 -way brass fire outlets will be constructed in the planter beds. The City looked at several different options to provide these connections and this is the best solution at the lowest cost. Cc: Michelle Weidner, CFO Pauline Closson, Engineering