Loading...
HomeMy WebLinkAboutInVision Architecture-1/18/2011CITY OF WATERLOO Council Communication City Council Meeting: January 18, 2011 Prepared: January 10, 2011 Dept. Head Signature: # of Attachments: 1 SUBJECT: Processional Agreement Waterloo Center for the Arts Door and windows replacement Submitted by: Craig Clark Interim Building Official & Maintenance Administrator Recommended City Council Action: Approve agreement with Invision Architecture for an amount not to exceed $14,000 plus reimbursable expenses not to exceed $500.00 for analysis, design work, bid documents and construction coordination related to the Waterloo Center for the Arts window and door replacement project. Summary Statement Invision performed work on the Center for Arts addition therefore they are the logical firm to continue with the door and window upgrade. Expenditure Required $ 14,500. 00 Source of Funds CIP 2011 Background Information: 11/22!10 Debra Anderson, Maintenance Administrator City of Waterloo 715 Mulberry Street Waterloo, IA 50703 Debra: RE: Window and Door Replacement Project Waterloo Center for the Arts We are pleased to provide this proposal for improvements at the Waterloo Center for the Arts. Our understanding of the project is as follows: The scope of work is to study and implement replacement of the hollow metal doors and glazed framing along the river side of the 1965 structure. We will review and document conditions of the existing hollow metal doors and windows on the original structure. We will develop recommendations for replacement of the doors and window, along with budget pricing for the work. Building plans and elevations will be developed to indicate the recommended solution. We will develop bidding and construction documents to complete the work. We will issue documents for bidding, hold a pre-bid conference, assist the City in receiving bids, and will develop the contracts for construction. During construction, we will hold coordination meetings, review submittals of systems and materials, will conduct a punchlist inspection and will provide coordination of contractors submittals to complete the project. We do not anticipate that consulting engineers will be required to complete the project. Should we determine that the fin tube radiation adjacent to the existing openings needs modification or replacement, we would add that work by amendment, and would obtain a proposal at that time. We propose to hold two meetings during design, the first to review the existing conditions and recommendation for improvements, and the second to review documents prior to issuing for bidding. We will hold two meetings during construction for coordination, and will provide up to four site visits, in addition to the punchlist inspection. We propose to provide these services working on an hourly basis with a maximum fee of $13,000, plus reimbursable expenses. Statements will be issued on a monthly basis. Reimbursable expenses are limited to the cost of production of bidding documents and shipping, and will be billed at cost. The maximum reimbursable expenses will be $500. A copy of our hourly billing rates is attached. 0 0 W 0 O. Debra Anderson 11/22110 Page 2 of 2 I will be the primary contact for INVISION. Please contact me with any questions or if you would like further clarification of our proposal. We look forward to the opportunity to work with you on these improvements to the Waterloo Center for the Arts. Michael Broshar, FAIA xc: Lynor Koch/INVISION enclosure INVISION Architecture Billing Rates January 2010 Principal 165.00 Project Manager 1 125.00 Project Manager 11 110.00 Architect 100.00 Intern 80.00 Interior Designer 70.00 Technical Staff 70.00 Administrative 45.00