Loading...
HomeMy WebLinkAboutB & B Builders and Supply-1/10/2011CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 3 PROJECT: FY 2010 SIDEWALK REPAIR PROGRAM - ZONE 10 AND TRAIL REPAIRS CONTRACT NO. 779 Date Prepared: January5,2011 AMOUNT: $8,199.59 INCREASE TO: B & B BUILDERS AND SUPPLY , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated April 12, 2010. A. Description of change to be made or extra work to be done: Adjust original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: As -built quantities varied for some bid items C. Settlement for cost of work to be made as follows: Compensation already made to contractor through bid items. See attached summary. BY: e=r-6,ci#J-k_ ATTEST: TOTAL INCREASE /(b IL B & B BUILDERS AND SUPPLY Date CONTRACTOR Change Order No. 3 BY: arci- TITLE: $8,199.59 Date APPROVED: City Engineer / //Si// Date Contract No. 779 Sheet 1 of 1 F.Y. 2010 SIDEWALK AND RECREATIONAL TRAIL REPAIR PROGRAM - ZONE 10 CONTRACT NO. 779 FINAL QUANTITIES ADJUSTMENT DIVISION 1 - SIDEWALK REPAIRS BID ITEM Item Description B &I3 ORIGINAL FINAL QUANTITY INCREASE/ UNIT PRICE QUANTITY QUANTITY DIFFERENCE DECREASE 1 REM/REP SIDEWALK, 4" PCC $ 4.25 2,686.60 4,583.10 1,896.50 $ 8,060.13 2 NEW 4" PCC SIDEWALK $ 3.50 535.00 0.00 (535.00) $ (1,872.50) 3 NEW 6" PCC SIDEWALK $ 4.10 359.00 111.10 (247.90) $ (1,016.39) 4 REM/REP SIDEWALK, 6" PCC $ 4.75 6,410.90 6,587.32 176.42 $ 838.00 5 DETECTABLE WARNING SURFACE $ 18.00 620.00 552.00 (68.00) $ (1,224.00) 6 REM/REP 24" C&G, 7.5" PCC $ 28.50 23.50 46.10 22.60 $ 644.10 7 REM/REP 24" C&G, 9" PCC $ 30.40 52.50 102.50 50.00 $ 1,520.00 8 REM/REP 24" C&G,12" PCC $ 32.90 87.30 103.20 15.90 $ 523.11 9 WATER VALVE ADJUST $ 425.00 1.00 1.00 (0.00) $ (0.00) 10 REMOVE TREE ROOTS $ 85.00 12.00 14.00 2.00 $ 170.00 11 3/4" ROADSTONE $ 28.00 40.00 2.00 (38.00) $ (1,064.00) 12 TRAFFIC CONTROL $ 1,500.00 1.00 1.00 0.00 $ - DIVISION 2 - TRAIL REPAIRS BID ITEM Item Description $ 6,578.44 � B & B ORIGINAL FINAL QUANTITY INCREASE/ UNIT PRICE QUANTITY QUANTITY DIFFERENCE DECREASE 1 REM/REP 5" PCC TRAIL - South Riverside Trail $ 5.00 100.00 152.50 52.50 $ 262.50 2 REM. EX. ASPHALT, REPLACE WITH 5" PCC $ 4.50 8,262.00 8,211.00 (51.00) $ (229.50) 3 TRAFFIC CONTROL $ 2,000.00 1.00 1.00 0.00 $ 1001 FLOODING - REM. EX. ASPHALT, REPLACE W/5" PCC $ 4.50 900.00 890.00 (10.00) $ (45.00) 1002 1-1/2" ROADSTONE BACKFILL $ 32.00 45.00 58.60 13.60 $ 435.20 1003 ADD. TRAFFIC CONTROL FOR WASHOUT AREA $ 400.00 1.00 1.00 0.00 $ - 1004 ASPHALT TRAIL PATCHING $ 5.00 360.00 357.50 (2.50) $ (12.50) 1005 ADD. REPLACEMENT OF ASPHALT TRAIL - REM. EX. ASPHALT, REPLACE W/5" PCC $ 4.50 4,000.00 4,000.00 0.00 $ - 2001 ADD. REPLACEMENT OF ASPHALT TRAIL - REM. EX. ASPHALT, REPLACE W/5" PCC $ 4.50 5,950.00 5,819.14 (130.86) $ (588.85) $ (178.15) DIVISION 3 - HIGHWAY 218 OVERPASS PARKING LOT SIDEWALK REPAIRS BID B & B ORIGINAL FINAL QUANTITY INCREASE/ ITEM Item Description UNIT PRICE QUANTITY QUANTITY DIFFERENCE DECREASE 1 PCC SAWING $ 3.50 167.00 228.00 61.00 $ 213.50 2 REM/REP 10" PCC - STREET $ 6.00 449.00 598.60 149.60 $ 897.60 3 REM/REP 5" PCC - PARKING LOT $ 5.50 72.50 0.00 (72.50) $ (398.75) 4 NEW 6" PCC CURB $ 12.50 110.00 157.10 47.10 $ 588.75 5 CURB REPLACEMENT - PARTIAL DEPTH $ 20.00 11.50 0.00 (11.50) $ (230.00) 6 BRICK REPAIR $ 5.50 305.00 437.40 132.40 $ 728.20 7 TRAFFIC CONTROL $ 600.00 1.00 1.00 0.00 $ - $ 1,799.30 TOTAL INCREASE IN CONSTRUCTION ITEMS / FINAL QUANTITY SUMMARY $ 8,199.59 PAY ESTIMATE #1 $ 16,403.10 PAY ESTIMATE #2 $ 13,764.70 PAY ESTIMATE #3 $ 31,808.27 PAY ESTIMATE #4 $ 16,882.49 PAY ESTIMATE #5 $ 1,925.87 PAY ESTIMATE #6 $ 83,489.84 PAY ESTIMATE #7 $ 532.20 RETAINAGE* $ 7,274.02 TOTAL PAYMENTS $172,080.49 ORIGINAL CONTRACT AMOUNT $111,415.90 CHANGE ORDER #1 $ 25,690.00 CHANGE ORDER #2 $ 26,775.00 AMENDED CONTRACT AMOUNT $163,880.90 AMENDED CONTRACT AMOUNT $163,880.90 FINAL QUANTITY SUMMARY - CHANGE ORDER #3 $ 8,199.59 FINAL CONTRACT AMOUNT $172,080.49 RETAINAGE" - During the preparation of this document, it was found that the unit price forr Division 2 -Trail Repair, Bid Item #3, Traffic Control was iunknowing changed from $600 fo'$2000 in Pay Estimate #4; a $1400 increase that B & B Builders received payment for in future Pay Estimates. To make the Total Payments match'the Final Contract Amount, $1400 was subtracted from the calculated retainage of $8,674.02 (r ii sated from the'errorieous Tota l Construction Cast of $173,480.49) to the now shown amount of $7,274.02.