Loading...
HomeMy WebLinkAboutAecom Technical Services-1/10/2011A=COM AECOM 319 232 6531 tet 501 Sycamore Street 319 232 0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com SNOW REMOVAL EQUIPMENT (SRE) ACQUISITION SERVICES WATERLOO REGIONAL AIRPORT WATERLOO, IOWA FAA PROJECT NO. 3-19-0094-39 (Proposed) Project Description - See Attachment Scope of Services - See Attachment Compensation A. Compensation for Services for this task order shall be a lump sum fee of Thirty Thousand Dollars ($30,000.00). General Conditions Except as specifically amended by this agreement, services shall be provided in accordance with the Consultant Services Agreement for the Waterloo Regional Airport between AECOM Technical Services, Inc., formerly known as Earth Tech, Inc., and the Waterloo Airport Board dated December 5, 2008. APPROVED CITY OF WATERLOO, IOWA APPROVED AECOM TECHNICAL SERVICES, INC. By�� By G E nest G. ark, Mayor Date 162611 Date L:\work\ADMI N\AGREE\PROF\WatAirSREAcquisitionServices.doc Joe A. Becker December 29, 2010 ATTACHMENT FOR ACQUISITION OF SNOW REMOVAL EQUIPMENT (SRE) FOR THE WATERLOO REGIONAL AIRPORT WATERLOO, IOWA PROPOSED FAA AIP PROJECT NO. 3-19-0094-39 I. PROJECT DESCRIPTION The project is described as the acquisition of snow removal equipment (SRE) consisting of a truck with plow and spreader box, and a ramp tractor with blade for the Waterloo Regional Airport, Waterloo, Iowa. II. GENERAL PROJECT SCOPE The work to be performed by the Consultant shall encompass and include detailed work, services, materials, equipment and supplies necessary to provide background research, develop specifications, provide bidding services, prepare grant application and provide grant administration for the acquisition of the snow removal equipment for the Waterloo Regional Airport. Work shall be divided into the following tasks: A. Design Phase 1. Kick-off Meeting. This task consists of a kick-off meeting to present the project scope, finances, deliverables and schedule. 2. Data Collection and Review. This task consists of the collection of existing data applicable to this project and related to the proposed snow removal equipment. 3. Project Specifications. This task consists of the preparation of specifications for the acquisition of the snow removal equipment. It is anticipated that separate bid documents will be prepared for each piece of snow removal equipment (truck with plow and spreader box, and ramp tractor with blade). The specifications will be in compliance with current Central Region Federal Aviation Administration requirements in effect at the time the specifications are prepared. 4. Quality Review. This task consists of the quality review of work elements on the project. During the course of this project, quality reviews will be conducted by senior technical personnel that are not directly involved in the project. 5. Bid Assistance. This task consists of assisting the Sponsor in advertising for and receiving bids, answering bid document interpretation questions from bidders, analyzing the bids received and preparing a recommendation to the Sponsor for award of contract. 6. Grant Application. This task consists of assisting the Sponsor in preparation of grant application. 7. Pay Applications and Reimbursement Forms. This task consists of preparing and processing monthly applications for payment to the Contractor and forwarding to the Sponsor for execution with recommendations for approval and payment. This task also includes preparation of federal reimbursements forms for the Sponsor. 8. Punch List. This task consists of conducting a review of the equipment upon delivery to the Waterloo Regional Airport and preparing a list of items ("Punch List") to be completed or corrected. 9. Project Close -Out. This task consists of assisting the Sponsor with project completion and final close-out documentation from the Contractor for the FAA by providing a statement covering the following. a. Sponsor Certification for Equipment Final Acceptance b. Final Outlay Report - Standard Form SF -271 c. Final Project Cost Summary d. SF -425 Financial Report e. Final Acceptance Report 1) Provide Brief Description of Procured Equipment 2) Provide a Minimum of Two Photographs of Each Acquired Item 3) Summary of Key Milestone Dates 4) Change Order Summary (If Needed) 5) Buy American Summary 6) Copies of Vendor Certifications 7) Acceptance Test f. Sponsor Cover Letter 1) Amendment Request 2) Statement of Compliance with Approved Procurement Specifications 3) Eligibility of Claimed Costs 4) Inventory • Description of the Equipment • Serial Number or Other Identification Number • Source of the Property, Who Holds Title • Acquisition Date • Cost of the Equipment • % of Federal Participation in the Cost of the Equipment • Location, Use and Condition of the Equipment 10. Project Administration. This task consists of administration and coordination of the project. Preparation of bid documents for each piece of snow removal equipment for distribution to -Sponsor, FAA, suppliers and potential bidders is included in this task. Preparation of contracts, reports on progress, preparation of pay estimates and grant reimbursement and project close-out documentation are a part of this task. L:\viwork\ADMIN\AGREE\PROF\SRE Scope AIP 39.doc 1f)