Loading...
HomeMy WebLinkAboutPeters Construction-1/3/2011 (2)fyo A T A Document G701 ® 2001 Change Order PROJECT: (Name and address) Waterloo Boat House Cedar River & Park Road Waterloo, IA TO CONTRACTOR: (Name and address) Peters Construction Corp. 901 Black Hawk Road Waterloo, IA 50701 CHANGE ORDER NUMBER: DATE: 12/16/10 ARCHITECT'S PROJECT NUMBER: 2009-0010 3 CONTRACT DATE: 11/17/09 CONTRACT FOR: General Construction OWNER ❑ ARCHITECT ❑ CONTRACTOR 0 FIELD 0 OTHER 0 The Contract is changed as follows: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) See attached. The original (Contract Sum) (Guara eedlkiaximuuaice) was The net change by previously authorized Change Orders The (Contract Sum) (Gafeteteed- *i}T r4 ) prior to this Change Order was $ The (Contract Sum) (Gu&a t€,gd-Maoi,.,ufa-P4 e.) will be (-insreased) (decreased) (aged) by this Change Order in the amount of The new (Contract Sum) (Gear-anteed- ai n-Ppiee)-including this Change Order will be The Contract Time will be (ind) (dccxga,sed) (unchanged) by ___ (___ ) days The date of Substantial Completion as of the date of this Change Order therefore is __� (Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.) 842,320.00 20,495.53 862,815.53 -5,932 34 $ 856,883.19 NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. AHTS Architects, P.L.C. ARCHITECT (Firm name) 327 E. 4th St., Ste. 204 Waterloo, IA 50703 ADDRESS Peters Construction Corp. CONTRACTOR (Firm name) 901 Black Hawk Road Waterloo, IA 50701 ADDRESS City of Waterloo Dept. of Leisure Sertices OWNER (Firm name 1101 Campbell Avenue Water..00, IA 5070 Y (Signature) Larry Kurtz (Typed name) 12/16/10 DATE e) David S. Peters, (Typed name) 12122 Ito DATE President Y (Signature) Mayor Ernest G. Clark (Typed name) DATE11[74`( CAUTION: You should sign aro original AIA Coniract Document, on which this text appears in RED. Ari original assures Thai changes will not be obscured. AIA Document G701 TM - 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.G. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents. e-mail The American Institute of Architects' legal counsel, copyright@aia.org. A Change Order GENERAL INFORMATION Document G701'- 2001 Instructions Purpose AIA Document G701 is for implementing changes in the Work agreed to by the Owner, Contractor and Architect. Execution of a completed G701 indicates agreement upon all the terms of the change, including any changes in the Contract Sum (or Guaranteed Maximum Price) and Contract Time. Use of Current Documents Prior to using any MA Contract Document, users should consult www.aia.org or a local AIA component to verify the most recent edition. Reproductions This document is a copyrighted work and may not be reproduced or excerpted from without the express written permission of the AIA. There is no implied permission to reproduce this document, nor does membership in The American Institute of Architects confer any further rights to reproduce this document. The AIA hereby grants the purchaser a limited license to reproduce a maximum of ten copies of a completed G701, but only for use in connection with a particular project. The AIA will not permit reproduction outside of the limited license for reproduction granted above, except upon written request and receipt of written permission from the AIA. Rights to reproduce the document may vary for users of AIA software. Licensed AIA software users should consult the End User License Agreement (EULA). To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org. COMPLETING THE G701 FORM Description of Change in the Contract Insert a detailed description of the change or reference specific exhibits describing, in detail, the change to be made in the Contract by this Change Order. Include any drawings, specifications, documents or other supporting data to clarify the scope of the change. Determination of Costs Insert in the blanks provided, or strike out the terms in parentheses that do not apply, the original Contract Sum or Guaranteed Maximum Price; the net change by previously authorized Change Order (note that this does not include changes authorized by Construction Change Directive unless such changes were subsequently agreed to by the Contractor and recorded as a Change Order); the Contract Sum or Guaranteed Maximum Price prior to this Change Order; the amount of increase or decrease, if any, in the Contract Sum or Guaranteed Maximum Price; and the new Contract Sum or Guaranteed Maximum Price as adjusted by this Change Order. Change in Contract Time Insert in the blanks provided, and strike out the unused terms in parentheses, the amount (in days) of the increase or decrease, if any in the Contract Time. Also insert the date of Substantial Completion, including any adjustment effected by this Change Order. EXECUTION OF THE DOCUMENT When the Owner and Contractor, in occurrence with the Architect, have reached agreement on the change to be made in the Contract, including any adjustments in the Contract Sum (or Guaranteed Maximum Price) and Contract Time, the G701 document should be executed in triplicate by the two parties and the Architect, each retaining an original. AIA Document G701 T^° — 2001. Copyright © 1979, 1987, 2000, and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and international Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org. WATERLOO BOAT HOUSE EXHIBIT A CHANGE ORDER #3 ATTACHMENT :::10—IS ARCHITECTS 327 E. 4th Street, Suite 204 Waterloo, Iowa 50703 319.233.1163 319.233.9863 fax www.ahtsarchitects.com Keyed Switch at East OH Door ADD: $ 709.69 Add Access Panel at Mechanical Chase ADD: 991.00 Additional Base Flashing at Deck ADD: 159.99 Changes to Front Entry Canopy-Add'I Steel -REVISED ADD: 1,173.09 Conduit and Backing at TV Locations -REVISED ADD: 338.50 Change Restroom Door 12 to 4" Head ADD: 227.62 Delete Vapor Barriers at Walls DEDUCT: -325.00 Venting Holes in Tower Sheathing ADD: 198.43 Shorten/Change Pine Chase at Lobby DEDUCT: -280.00 Pine Box at Lobby ADD: 700.35 Credit for Sidewalks/Bollards DEDUCT: -5,160.00 Signage Allowance Adjustment ADD: 2,549.04 Misc. Electrical per RFP ADD: 1,855.93 Adjust Qwest Utility Extension Allowance ADD: 1.06 Additional Elevator Pit Light ADD: 618.64 Credit Mech/Elec. Allowances DEDUCT: -10,000.00 Entryway Receptacle ADD: 309.32 Total Change - DEDUCT: -$5,932.34 Mardy Hoist, AIA Steve Trost, AIA Duane Svoboda, AIA Larry Kurtz, ASLA