HomeMy WebLinkAboutCardinal Construction Co-12/20/2010CITY OF WATERLOO. IOWA CHANGE or EXTRA WORK ORDER NO. 3 PROJECT: F.Y. 2011 CARNEGIE ANNEX PARKING LOT REPAIR CONTRACT NO. 800 Date Prepared: December 1, 2010 AMOUNT: $1.900.15 INCREASE TO: CARDINAL CONSTRUCTION CO. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated October 24, 2010. A. Description of change to be made or extra work to be done: Adjust original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: As -built quantities varied for some bid items. C. Settlement for cost of work to be made as follows: Compensation already made to contractor through original bid items. See attached summary. CITY O ATERLBY: ,'1,14.61 6 Mayor Date CONTRACTO NET INCREASE $1,900.15 CARDINAL CONSTRUCTION CO. ATTEST: City Cterk Qi,VJ BY: PRINTED NAME: TITLE: Arof( APPROVED: /2-9-70 Date n/Z1/3/10 City Engineer Date F.Y. 2011 Carnegie Annex Parking Lot Repair Contract 800 Final Quantity Adjustments Change Order No. 3 Bid Cardinal Final Plan Incr/Decr Incr/Decr Item Description Unit Unit $ Qty Qty Qty Amount 1 Embankment -in -Place CY $13.91 523.5 500 23.5 $326.89 2 Excavation, Class 10, Roadway and Borrow CY $11.58 4.0 10 (6.0) ($69.48) 3 Compaction with Moisture and Density Control CY $5.69 527.5 525 2.5 $14.23 4 Standard or Slip Form Portland Cement Pavement, Class C, Class 3 Durability, 6 In. SY $53.90 284.7 260 24.7 $1,331.33 5 Removals, As Per Plan LS $8,354.42 1.0 1 0.0 $0.00 6 Structural Concrete (Miscellaneous) CY $732.15 19.25 20 (0.8) ($549.11) 7 Reinforcing Steel LB $1.02 3017.0 2400 617.0 $629.34 8 Removal of Pavement SY $11.60 323.2 300 23.2 $269.12 9 Sidewalk, PC Concrete, 5 In. SY $52.20 40.1 40 0.1 $5.22 10 Safety Closure Each $228.08 2.0 2 0.0 $0.00 11 Painted Pavement Marking, Waterborne or Solvent - Based Sta. $26.08 0.0 2.2 (2.2) ($57.38) 1001 Remove Wall and Fill Void LS $3,158.00 1.0 1 0.0 $0.00 2001 Cold Weather Protection SY $1.00 324.8 324.8 0.0 $0.00 Total Increase $1,900.15 Original Contract Amount $55,599.01 Change Order No. 1 $3,158.00 Change Order No. 2 $324.80 Change Order No. 3 $1,900.15 Final Contract Amount $60,981.96 Payments To Contractor Estimate No. 1 $57,932.86 Retainage $3,049.10 Total Payments to Contractor $60,981.96